HomeMy WebLinkAboutBarracks Pool Development PermitDEVELOPMENT PERMIT
PERMIT NO. 09-74 c..r~
CITY OF C OLLEGE STAT IO N
Plau11ing & IRnlnpmcm Scruitei
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
The Barracks Subdivision -PH 2
Common Area No. 5
(Pool Addition)
DATE OF ISSUE: February 26, 2010
OWNER:
Greens Prairie Investors, LLC
4490 Castlegate Dri ve
College Station , Texas 77845
SITE ADDRESS:
The Barracks Subdivision -PH 2
DRAINAGE BASIN:
Bee Creek Trib. "B"
VALID FOR 24 MONTHS
CONTRACTOR:
Wallace Phillips
4490 Castlegate Drive
College Station , Texas 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work of any kind may start until a Development Permit is issued.
2 . No wo rk beyond lim its covered in permit is authorized .
3. The permit may be revoked if any false statements are made herein . If revoked , all work must cease until permit is re-
issued .
4 . Development shall not be used or occupied until Certificate of Occupancy is issued .
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour)
and post construction .
7 . Other permits may have been required to fulfill lo ca l, state and fe deral requirements. Construction w ill be in
compliance with all necessary State and Federal Permits.
8. Stormwater mitigation , including detention ponds wi ll be constructed first in the construction sequence of the proj ect.
9. In accordance w ith Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Po llution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitt ing requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requ irements .
10 . All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
11 . All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of an y tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to , paint, o il,
solvents, asphalt, concrete , mortar, or other harmful liquids or materia ls within the drip line of any tree required to
remain is also prohibited .
12. All construction shall be in accordance with the stamped approved plans and specifications for t he above-named
project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically
requested and approved will be allowed .
13. Special Conditions : **TCEQ Phase II Ru les In Effect** . ...
l ,,PV'~ ~A/t!' , the Contractor, hereby agree to comply with all conditions herein.
G~/&S: &,u!rE ..:z;.;v.e;rrol!.J 3 -/-/0
Contractor Date
I hereby grant this permit for development. Contact j(c ,t ·r. .. Jc._r (97c,) 7 7 7-0 l 9 z __ I the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspe ctions.
-7 / z 6/fu
Date
Water & Sewer Flow Calculations
Fixture Count Determination
Barracks Pool
Fixture Unit Value
Fixture Type #of Fixtures Load Factor Fixture Units
_Bathroom~!'. __ -f---__ O ______ 6_____ _ ____ _Q_
[f~~.:~-d~ =-A,~=! =--~
Water Closet (va~---------~~------1.Cl_ _________ + _________ o
2f.:;~,~:,, +-=-~ !'~ ~==r =-~ ______ _d _____ =fil ______ ... --·--·===· ===
Sewer Peak Flow
Pool
Pool Discharge Pump
1 Townhome
Total
I Total= EJ
Peak Demand -16 gpm
Pool fill valve 3 gpm
Total Water Demand -19 gpm
19 gpm
50gpm
3gpm
72 gpm
3/4" meter
4" sewer service at 1 % slope -depth in pipe= 3", velocity= 2.4 fps
HARLE ENGINEERING COMPANY
3002 Texas Avenue South
College Station, Texas 77845
Voice/Fax 979.693.7191
December 24, 2009
Alan Gibbs, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
RE: Letter Acknowledging City Standards -Pool Addition -Barracks Subdivision
Phase 2
Dear Mr. Gibbs:
The purpose of this letter is to acknowledge that the construction plans for the water
service, sanitary sewer service and the sidewalk within the public right of way for the
above-referenced project, to the best of my knowledge, do not deviate from the B/CS
Design Guideline Manual. No other alternate design or construction methodology was
used.
I also acknowledge that, to the best of my knowledge, the details provided in the
construction plans are in accordance with the B/CS Standard Details.
Sincerely, .'m
JciSeph P. Schultz, P.E.
Civil Engineer
bJ/!'>'!!':""~~~·~i<;;l.~1''\_ ~'""'-"-\S (Jr' 'f1:: '!'J, ~A.,'?-o""""~"""e,,~l:,:·1~1 '"~j
yt,W0 <>" *'. "",. (j~ f1 ;JJ!1 ,/• '. .. 11~
jfP i'I: l' ~a * f~ i!*: s~*~tJ JiJ~ .. ~~~~ ~~.,~~O<>H <>H ~~~~ ~~<>~~ .. ~~ • ~~ 0 O~
IOSEPH P. SCHULTZ l).
<tu OH~~~~ o o • vno ~~ oo ~~-"-"e o ~~~~
6 "889 ~.CJ::, . .... G'9: v ,.~ /;././ J
·'"" ,-,Q,• ,'-'.,• _, · --' "-''->1s i:Y\"' "' -.6 q, ~~<$"& ••••• ,;i:,,.•·' o§ / 2 -2 7 -"" I lit1~&/0N1\L "'-"'""' C/ \.~%;~~~
Fff15J6
/\'\
v~ \9.,\X't.C\. ~~.r, n .. ', ·:, .. ' r~ .. -. \_/ ~\0\· 11\\.J \ r.\'~ • V' \\\' . \'\\U 1
FOR OFF:fr ~E ~~y''i \,
CASE NO.: :~: • '-1: V\)
)/.Jf1f/ ~1·
DATE SUBMITTED: I '/1 • · I• Y •( t '!
TIME: Ji!: -:~)'-::::. -· f
STAFF: /fri:r. CrrY or CoUEGE ~r1\TION
Home oflfxas A&.i\1 Unfrersity~ SITE PLAN APPLICATION
GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
~ $668 Site Plan Application Fee.
:,r 3 i
~ $250 Non-Residential Architectural Standards Building Review Application Fee (if applicable).
~ $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee. Fee is
0.75% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the
balance is due prior to the issuance of any plans or development permit).
~ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
~
~
~
Fourteen (14) folded copies of site plan.
One (1) folded copy of the landscape plan.
One (1) copy of the following for Non-Residential Architectural Standards building review or Nor!hgate
Building Review (if applicable).
@' Building elevations for all buildings.
5'1' A list of building materials for all facade and screening.
[if Color samples for all buildings or list colors to be used from the approved color palette.
Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
Notice of Intent (NOi) if disturbed area is greater than five (5) acres cumulatively.
~
~
~1~
tl~ Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
111~ Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
~ The attached Site Plan Non-Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why !hey are not
check off.
Date of Optional Preapplication or Stormwater Management Conference ~N/,~11\~--------------
NAME OF PROJECT Pool Addition -The Barracks Subdivision -Phase 2
ADDRESS Sergeant Drive -The Barracks Subdivision
LEGAL DESCRIPTION (Lot, Block, Subdivision) Common Area No. 5 of The Barracks Subdivision -Ph. 2
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for lhe project):
Name Wallace Phillips E-mail wal/ace.phillips@verizon_net
Street Address 4490 Castfegate Drive
City College Station State Texas Zip Code 77845 --------
Phone Number 690-7250 Fax Number 690-1041
-------------~
PROPERTY OWNER'S INFORMATION:
Name Greens Prairie Investors, LLC E-mail wallace.phi//ips@verizon.net
Street Address 4490 Castlegate Drive
City College Station State Texas Zip Code 77845 -------
Phone Number 690-7250 Fax Number 690-1041
-------------~
10/09 Page 1 of9
ARCHITECT OR ENGINEER'S INFORMATION:
Name Harle Engineering Company-Joe Schultz, PE E-mail joeschultz84@verizon.net
Street Address 3002 Texas Avenue South
City College Station State Texas Zip Code _7_784_5 ____ _
Phone Number 693-7191 Fax Number 693-7191 --------------
0 THE R CONTACTS (Please specify type of contact):
-------------------------Name _
Street Address
State
E-mail
City -----------------Zip Code -----------------
Phone Number Fax Number --------------
Current zoning R-3, Residential -Townhouse
Presentuseofproperty ~~~ac~an~t~--------------------------------
Proposed use of property '--P~o~o'-1---------------------------------
Number of parking spaces required O Number of parking spaces proposed ~o _______ _
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes IX No
M,YLTI-FAMILY RESIDENTl/'L PARKLAND DEDICATION r (l v<. •I \-i Jl.d.; c.+c JI (ltZ.I (Fees due prior to the issuance of a Building Pennit)
Total Acreage
Floodplain Acreage -----
Housing Units
___ #of 1 Bedroom Units
# of 2 Bedroom Units ---
___ # of 3 Bedroom Units
___ # of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
# Bedrooms = 132 sq. fl. ---
# Bedrooms < 132 sq. fl. ---
# of Multi-Family Dwelling Units
X$1646=$ -------
# of acres in floodplain
#of acres in detention
# of acres in greenways
Date dedication approved by Parks &
____ Recreation Advisory Board
COMMERCIAL
Total Acreage
Building Square Feet-----
Floodplain Acreage -----
• Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certfftes that the facts stated herein and exhibits attached hereto are true
and correct.
d.~al/,;)__ ~ / ..t-;l3 -oq
Date
10109 Page 2 of9
GENERAL PROVISIONS FOR DEVELOPMENT PERMIT
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no work is commenced within 24 months of issuance.
6. Applicant is hereby informed that other permits may be required to fulfill local, state, and federal regulator
requirements.
7. Applicant hereby gives consent to the City representatives to make reasonable inspections required to verify
compliance.
8. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. All development shall be in accordance with the plans and specifications submitted to and
approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of
College Station shall apply.
9. I, THE OWNER, CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT
PERMIT APPLICATION, ARE, TO THE'3EST OF MY KNOWLEDGE, TRUE, AND ACCURATE.
/ 2-.2.3.Vf
Date
ACKNOWLEDGMENTS (required for all development):
10/09
1. I, @,t/A;E f//1£.L;;r/?f , the owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and
ordinances of the City of College Stati•;m and State and Federal Regulations.
/ J!.-,)3 ~i:;'?
Date
2· I, @//,;(£ /7/111d/?5 , certify that all necessary State and Federal permits will be obtained
prior to construction. • }
t?i/a&v &A;L »41 ---'"''""".l'--'-.!.=..l,_,_~,2'+-,fl _____ _
Property Owner(s) ~ ~ Date
3
·
1• tfd4//4b ~ , the Owner, authorize release of plans to C(zA(T/(Ar;p/I
for bidding purposes OfliY'. JUdefStand that final approval and release of plans for construction is contingent on
contractor signature on approved D<1velopment Permit.
/ ;z-,,1.3 ~o'i'
Date
Page 2 of9
ENGINEERING CERTIFICATIONS (required for development in Special Flood Hazard Areas):
A I J ti r :(!-. k /9. <J .. ._f f-L . . . ' J.. Jc , certify that any nonresidential strul>..~ r proposed to be on
this site as paof this application is designated to prevent damage to the str~<t\!lrdts ~lnts as a result of
floodina from the 100-~ar storm. ·. ;'<b":, •• •''*''000 '"•{+,,~@ _#*.,<Ito "e (.9 w@ @!*" ~ ;; fVhl'VI.. 1 z~zf.,?1Ji····.,····· .. ·· · _~*'Ii. ~ IQ"'-n , ;H·~Gh~mc . " * » ~~~~:?ti h. r SCH Ur "H""7 05 ·~t4,i
Date j!~-"t) ••• ., ..... ,._ ........ "" . ~rp'r.f.J(J ".)]. e~ ..... ._ .. ~
'.o1-_>1>0,("., 0Ban l'·0~1; "~T~~ ;Ji' "!:.' ·~,
Engin
~~(},;\i/. :;
.,--.,,----,----,-,.---.,-..,.~,.-.,.-,.--, certify that the finished lloor elevalitnuiUhe lowest floor
including any basement, of any residential structure, proposed as part of this application is at or above the base
flood elevation established in the latest Federal Insurance Administration Flood Hazard study and map, as
amended.
8. I,
Engineer Date
C. I, j oS<~~ f. ~e-fr.,lf~ . , certify that the alterations or develoement covered by this permit
shall not diminis ihe flood-carrying capacity of the waterway adjoining or crossi~~~d site and that such
alterations or development are consistent with requirements of the City of Co~ ~liOP,·(:#~e, Chapter 13
=~~~'""°'-"'""-IJ['Jk ·.~·;·1.
I z .. 2-g ~f/~'!~fflL.f: .. ~~D,l::rft···~
Engin ~ Date i/;i;S:_.,\;:~~~:oc'D'c ' i;J} c/J:4 rl8
~~fS:~~~:,.~.~.~ .. ,.. -.·,::-~~~;.~{I
"W;-:-'Q-,:. ,.,,., ..• ,,-
D · I, , certify that the proposed alterations do not raise the level of the
100-year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval:
Page 3 of 9
10/09