Loading...
HomeMy WebLinkAboutRES2007-02096, 07-2097or-4mu Oq, Lauri � -3sg2- Amber Carter - Re: CAlling for CO for 2402 Stone Castlebr. 1 From: Mitchell Carson To: Amber Carter; Benjamin McCarty; Chris Haver; Date: 12/3/2007 3:44 pm Subject: Re: CAlling for CO for 2402 Stone Castle Cir This one is OK Mitch >>> Amber Carter 12/03/07 12:20 PM >>> by 07-2096 Any issues? Date: 12/3/2007 Inspection Comments for Finals Permit Year: 7 Permit Number: 2096 Address: 2402 STONE CASTLE CIR Type Inspection Type Code Description si ins Inspection Result Comments B100 BLDG, FOUNDATION -SLAB IC 08/03/2007 04:36 PM RH PDA B100 BLDG, FOUNDATION -SLAB IC Strings up, slab ground installed. B115 BLDG, FRAMING IC 09/11/2007 12:48 PM JGM PDA B115 BLDG, FRAMING IC need interior anchors and bracing behind fireplace B130 BLDG, INSULATION IC 09/13/2007 11:42 AM RH PDA B130 BLDG, INSULATION IC Before brick repair TYVEK. Tape seal around doors, B130 BLDG, INSULATION IC penetrations and seams. Foam sealant doesn't pass as a B130 BLDG, INSULATION IC moisture barrier as per Tyvek. Also, in the future TYVEK B130 BLDG, INSULATION IC must cover entire wall before soffits are installed. E150 ELEC, FINAL IC 11/30/2007 03:23 PM RH PDA E150 ELEC, FINAL IC Need plug to right of stove top and install gromet on E150 ELEC, FINAL IC romex in w/h cabinet. M110 MECH, FINAL IC September 11, 2007 8:00:33 AM acarter. M110 MECH, FINAL IC Entered Wrong Inspection Page 1 Date: 12/5/2007 Inspection Comments for Finals Permit Year: 7 Permit Number: 2096 Address: 2402 STONE CASTLE CIR Type Inspection Type Code Description Status Inspection Result Comments B100 BLDG, FOUNDATION -SLAB IC 08/03/2007 04:36 PM RH PDA B100 BLDG, FOUNDATION -SLAB IC Strings up, slab ground installed. B115 BLDG, FRAMING IC 09/11/2007 12:48 PM JGM PDA B115 BLDG, FRAMING IC need interior anchors and bracing behind fireplace B125 BLDG, FINAL IC 12/03/2007 03:07 PM RH PDA B125 BLDG, FINAL IC Need to finish installing electrical plug to right of B125 BLDG, FINAL IC stove top. Need to install address, handrails and post B125 BLDG, FINAL IC energy requirements in electrical panel door. B130 BLDG, INSULATION IC 09/13/2007 11:42 AM RH PDA B130 BLDG, INSULATION IC Before brick repair TYVEK. Tape seal around doors, B130 BLDG, INSULATION IC penetrations and seams. Foam sealant doesn't pass as a B130 BLDG, INSULATION IC moisture barrier as per Tyvek. Also, in the future TYVEK B130 BLDG, INSULATION IC must cover entire wall before soffits are installed. E150 ELEC, FINAL IC 11/30/2007 03:23 PM RH PDA E150 ELEC, FINAL IC Need plug to right of stove top and install gromet on E150 ELEC, FINAL IC romex in w/h cabinet. M110 MECH, FINAL IC September 11, 2007 8:00:33 AM acarter. M110 MECH, FINAL IC Entered Wrong Inspection M110 MECH, FINAL IC 12/03/2007 03:05 PM RH PDA M110 MECH, FINAL IC Need to complete vent -a -hood -duct. Page 1 PREPARED 12/05/07, 7:59:02 INSPECTION TICKET PAGE 4 City of College Station INSPECTOR: BUILDING INSPECTOR DATE 12/04/07 _ --_---_-_--_-------------------------------------------------------------- ADDRESS 2402 STONE CASTLE CIR j SUBDIV: CASTLEGATE PH 1 SEC 7 CONTRACTOR PITCOCK & CROIX PHONE (979) 764-7551 OWNER . . PHONE PARCEL . . 184200-1710-0100 APPL NUMBER: 07-00002096 RESIDENTIAL, 1 UNIT DETACHED NEW ------------------------------------------------------------------------------------------------ PERMIT: BLDG 00 BUILDING PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ B100 01 8/03/07 RH BLDG, FOUNDATION -SLAB TIME: 17:00 8/03/07 AP August 3, 2007 3:01:43 PM glsouth. 08/03/2007 04:36 PM RH PDA Strings up, slab ground installed. B115 01 9/11/07 JGM BLDG, FRAMING TIME: 17:00 9/11/07 AE September 10, 2007 9:46:47 AM glsouth. 09/11/2007 12:48 PM JGM PDA need interior anchors and bracing behind fireplace B130 01 9/13/07 RH BLDG, INSULATION TIME: 17:00 9/13/07 AE September 12, 2007 1:40:46 PM kwolfe. 09/13/2007 11:42 AM RH PDA Before brick repair TYVEK. Tape seal around doors, penetrations and seams. Foam sealant doesn't pass as a moisture barrier as per Tyvek. Also, in the future TYVEK must cover entire wall before soffits are installed. B125 01 12/03/07 RH BLDG, FINAL TIME: 17:00 12/03/07 DA December 3, 2007 11:06:52 AM glsouth. 12/03/2007 03:07 PM RH PDA Need to finish installing electrical plug to right of stove top. Need to install address, handrails and post energy requirements in electrical panel door. B125 02 12/04/07 BI BLDG, FINAL TIME: 17:00 � December 4, 2007 2:29:23 PM acarter. ----------------------(-------------- CONTINUED ONTONEXT PAGE ----------------------------------- PREPARED 12/05/07, 7:59:02 INSPECTION TICKET PAGE 5 City of ------------------------------------------------------------------------------------------------ College Station INSPECTOR: BUILDING INSPECTOR DATE 12/04/07 ADDRESS . : 2402 STONE CASTLE CIR SUBDIV: CASTLEGATE PH 1 SEC 7 CONTRACTOR PITCOCK & CROIX PHONE (979) 764-7551 OWNER . . PHONE PARCEL . . : 184200-1710-0100 APPL NUMBER: 07-00002096 RESIDENTIAL, 1 UNIT DETACHED NEW ------------------------------------------------------------------------------------------------ PERMIT: MECH 00 MECHANICAL PERMIT SUB: CLIMATE MASTERS (979)775-6572 REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ M110 O1 9/10/07 BI MECH, FINAL TIME: 17:00 9/11/07 CA September 10, 2007 4:39:58 PM acarter. September 11, 2007 8:00:33 AM acarter. Entered Wrong Inspection M100 01 9/11/07 JGM MECH, ROUGH IN TIME: 17:00 9/11/07 AP September 11, 2007 8:00:51 AM acarter. M110 02 12/03/07 RH MECH, FINAL TIME: 17:00 12/03/07 DA December 3, 2007 11:17:07 AM kwolfe. 12/03/2007 03:05 PM RH PDA Need to complete vent -a -hood -duct. M110 03 12/04/07 BI MECH, FINAL TIME: 17:00 ' ��-V% ,,,/ December 4, 2007 3:18:11 PM acarter. -------------------------------------- COMMENTS AND NOTES-------------------------------------- WFO933747 / 001 City of College Station PAGE 1 REQ. DATE: 07/24/07 07/24/07 12:37:44 LOCATION: 2402 STONE CASTLE CIR LOC ID: 208130 REQUESTOR: PITCOCK & CROIX �-- ''� ORIGIN: CUSTOMER -WALK IN REQ USER: GLSOUTH AUTH USER:GLSOUTH WRK TYPE: 4" SEWER TAP AND 3/4" WATER TAP ******************************************************************************** TASK: SET UP NEW UTILITY ACCT SET READY SCHED START: 07/24/07 SCHED COMPLETION: 07/24/07 ******************************************************************************** JOB ORDER RESULT COf4MEPTrS . ,li _ f �i i . _. � Dec'06 2007 2:52PM RANDALL PITCOCK 9796935400 P.3 no TEXAS SPCS TERMITE TREATMENT DISCLOSURE DOCUMENT Location to be Treated: Approximate Measures to be Treated: I`' A LABEL FOR ANY OTHER PESTICIDE RECOWNDED OR USED HAS BEEN ATTACHED AS PART OF THIS DOCUMENT. WARRANTY INFORMATION (IF ANY) INCLUDING AREA COVERED, TIME PERIOD OF WARRANTY, RENEWAL OPTIONSAND COST, THE OSUGAT7ON8 OF THE PEST CONTROL OPERATOR TO RE- TREAT FOR TERMITE INFESTATIONS OR REPAIR DAMAGE CAUSED BY TERMITE INFESTATIONS WITHIN THE WARRANTY PERIOD, AND THE CONDITIONS THAT COULD DEVELOP AS A RESULT OF THE OWNER'S ACTION OR INACTION THAT WOULD VOID THE WARRANTY HAS ALSO BEEN ATTACHED. Charges for pre -treat: NOTES: Annual re-newal: ",y's:•l;',�s(gut,�4y'y+rya,�f';.�{,'y�`.. r'- arr..y;,,k,��:_ N t j. rpr'�?F...ky.,,�;=M1 Yi•' Xis"?;�jit,x�1 ,�y� ¢: K'$'!"ru•�,. 2n✓:+:.?4`d.i�;:us+�. :.S'��,+:v:�:+?iv, i.s�:::atr;ti7 Ca of Tochhulan M CB liewme 0 32120 I T Dec 06 2007 2:52PM RANDALL PITCOCK 9796935400 p-2 er . SUBTEI(iRAI`IEAN TERMITE`P:RECONSTRUCTION 1HSCLO' S.UiRRE FOR, ,EACH.FSTIMATE For all treatrrients there will be a diagram showing exactly what.will be treated prior to e beginning of fil treatment. Review the .pesticide Labet provided to you.at this time for ininimum treatment standards. Remember thaYyour:anchitects or design engineers specifications..must also be followed, unless they are in violation of the law'. R$v%iew the eonsilmer In rmation.sheet for further information. If you have any questions, contact the pest :control.company: or i e Texas .Structural Pest Control Board; PO Box 1-927, Austin, Texas 78767-1927. Tel `one:number(:12) 305=8250. ,.: Name of Customer. Address Ci777-7 ty State Zip Location to be Treated Type of Treatment: [ ] .Full [ artial A label of termiticide(s) is enclosed. The percentage of the. termiticide(s) to be, �app;lied -at this location is ' OG a Warranty Irifor on. provided >'niist lne?ude, t xe:Co l to Details of any Warranty provided and the fvllo►ving: Time Periiad of War► e0 1 O&W41Optsons and -C.00; and Obfigat ons of the Contracting Parties. If the warranty does .not include t}te, entire,:stmeture treated; the areas included in the warranty are: (spec%fy) . Total Square Feet to be Treated:Total.Lineai Feet to be Treated: Approximate Measurementsof the Structure(s)..to ; Treated: ti w � F0,07 Signature of Certtfied .AppiCM'DT Or' Fr rated. lame Date Technician Completing Estimate . Name of Pest Control Company TFCL. No. Lize And iegulafedonder: eTezae $tsti tura! Pest Control Act' Texas Structural Pest Control Board, PO Bog 1927, Auet n, Tea ' U7. 67-1927, Telephone number (512) 305.5250. Sample Form — April 4, 2005 Page 1 of 2 BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE, CATION, TX 77840 PHONE: (979) 764-357 FAX: (979) 764-3496 http://bpinspect-.Cstx.gov ---------------------------------------------------------------------------- Application Number . . . . . 07-00002096 Date 7/24/07 Application pin number . . . 958784 Property Address . . . . . . 2402 STONE CASTLE CIR Property ID: 184200-1710-0100 R #• Application type description RESIDENTIAL, 1 UNIT DETACHED NEW Subdivision Name . . . . . . CASTLEGATE PH 1 SEC 7 Property Use . . . . . . . . RESIDENTIAL Property Zoning . . . . . . . PLANNED DEVL HOUSING Application valuation . . . . 140514 Owner Contractor -- - - - - - - - - - - - - - - - - - - - - -- ----------------- PITCOCK & CROIX ------- P.O. BOX 10276 COLLEGE STATION TX 77842 (979) 764-7551 --- Structure Information 000 000 SINGLE FAMILY Construction Type . . . . . COMBUSTIBLE (UNPROTECTED) Occupancy Type . . . . . . RESIDENTIAL-SFR/DUPLEX Other struct info . . . . . EXTERIOR WALL TYPE BRICK IMPACT/PRORATA FEES PAID NA FOUNDATION TYPE SLAB NUMBER OF GARAGE BAYS 2.00 TYPE OF GARAGE (ATT/DET) ATT HEATED AREA 2129.00 INTERIOR WALL TYPE SHEETROCK NUMBER OF BATHROOMS 3.00 NUMBER OF BEDROOMS 3.00 SEWER TYPE PUBLIC TAZ 441.00 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT Additional desc . . BK Permit pin number . 515197 Permit Fee . . . . 583.00 Plan Check Fee .00 Issue Date . . . . 7/24/07 Valuation . . . . 140514 Expiration Date . . 1/20/08 Qty Unit Charge Per Extension BASE FEE 460.00 41.00 3.0000 THOU BLDG, VAL 100001-500000 123.00 ---------------------------------------------------------------------------- Special Notes and Comments -Future Bonus Room Not To Include Future Electrical Wiring. A J-box is Allowed for future Expansion but no Wall or - --------------- ----- ------------------------ ----- --- ----- ----------- BUILDING DEPTREPRESENTATIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764,-3576' FAX: (979)764-3496 http://bpinsp6ct.cstx.gov Application Number 07-00002096 Application pin number 958784 Page 2 Date 7/24/07 Special Notes and Comments Ceiling Wiring Allowed. -Narrow Wall Bracing Fully Sheathed with Interior Anchors and Bracing Behind Fireplace for Rear Porch Wall. ALL BRANCH CIRCUITS THAT SUPPLY OUTLETS IN DWELLING UNIT BEDROOMS SHALL BE PROTECTED BY AN ARC -FAULT CIRCUIT INTERRUPTERS) PROVIDE ATTIC ACCESS OPENING (MINIMUM ROUGH -FRAMED SIZE 22" X 3011) WITHIN 20' OF THE MECHANICAL EQUIPMENT AND WALKWAY PROVIDE CHEMICAL TREATMENT OR PHYSICAL BARRIER (SUCH AS METAL OR PLASTIC TERMITE SHIELDS) FOR PROTECTION AGAINST TERMITES. IF CHEMICAL TREATMENT IS USED, THE CONCENTRATION, RATE OF APPLICATION AND TREATMENT METHOD SHALL BE CONSISTENT WITH THE TERMITICIDE LABEL. BORACARE TREATMENT IS A SUITABLE SUBSTITUTE. ALL METHODS MUST BE USED IN CONJUNCTION WITH TREATED SILL PLATES. PROOF OF METHOD TO BE USED SHALL BE RECEIVED IN OUR OFFICE BEFORE A CERTIFICATE OF OCCUPANCY WILL BE ISSUED. Garage ceiling must have 5/8" Type X sheetrock when there is Habitable space above the garage. PROVIDE COMBUSTION AIR FOR GAS FIRED APPLIANCES PER CHAPTER 17, 2006 INTERNATIONAL RESIDENTIAL CODE Surface Drainage Shall Be Diverted to an Approved Point of Collection. Lots Shall Have a Grade Fall Minimum of 6" inches Within the First 10' feet Away From the Foundation Walls. ELECTRICAL SHALL BE INSTALLED PER 2005 National Electrical Code & LOCAL AMENDMENTS ELECTRIC STRIP HEATING NOT ALLOWED FOR RESIDENTIAL PROPERTIES WITH FLOOR AREA GREATER THAN 500 Sq. FEET MINIMUM FOUNDATION STANDARD - ALL FOUNDATION SHALL COMPLY WITH THE MINIMUM FOUNDATION STANDARD AS PER CITY'S ORDINANCE (FOUNDATION DETAIL SHALL BE SHOWN ON PLANS) MAKE SURE TO INCLUDE REBAR SLAB GROUND Hearth Extension Needed For Fireplace Opening <6 sq. ft.(8" side & 16" front) For Openings >6 sq. ft. (12" side & 20" front) ALL FRAMING SHALL COMPLY WITH 2O06 INTERNATIONAL RESIDENTIAL CODE PROVIDE ENGINEERED BEAM FOR GARAGE DOOR HEADER ATTACHED GARAGES SHALL HAVE ALL TOP PLATE AND HEADER BUILDING DEPT REPRESENTATIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3576 FAX: (979)764-3496 http://bpinspect.cstx.gov Application Number . . . . . 07-00002096 Application pin number . . . 958784 Page 3 Date 7/24/07 Special Notes and Comments PENETRATIONS SEALED Assure Proper GFI Locations, Including One Within 25' Of Outside A/C Unit PLATFORM FOR MECHANICAL EQUIPMENT AND/OR ACCESS MAY HAVE TO BE ELEVATED TO ALLOW FOR ATTIC INSULATION ACCESS TO JACUZZI TUB CIRCULATION PUMPS SHALL BE PROVIDED IN ACCORDANCE WITH 421.5 OF THE 2006 INTERNATIONAL PLUMBING CODE. IF NOT DETERMINED BY MANUFACTURER IT SHALL BE A MINIMUM OF 12" X 12" AND IF PUMP IS GREATER THAN 2' FROM ACCESS OPENING THEN IT MUST BE 18" X 18" OPENING IF LAWN SPRINKLERS IS PROVIDED, PERMIT MUST BE ISSUED PRIOR TO CERTIFICATE OF OCCUPANCY. REQUIRED EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY,TOOL OR SPECIAL KNOWLEDGE/EFFORT A Minimum of No. 15 Asphalt Felt or Other Approved Water Resisitive Barrier Shall be Placed Over All Exterior Sheathing Per 2006 IRC Section R703.2 THE MAXIMUM ALLOWABLE DRIVEWAY WIDTH MEASURED AT THE PROPERTY LINE IS 25' AND MINIMUM WIDTH OF 12' ON NARROW WALL BRACING WHERE SPECIAL NAILING PATTERN, STRAPPING BETWEEN STORIES, OR HOLD DOWNS ARE REQUIRED THESE ITEMS MUST REMAIN VISIBLE UNTIL THE INSPECTION PROCESS HAS BEEN DONE TO ALLOW FOR COVER-UP MUST INDICATE METHODS ON FLOOR PLAN TO BE USED TO MEET NARROW WALL BRACING REQUIREMENTS PER IRC CODE SECTION R602.10 IN 2006 IRC If PEX water supply piping is sleeved below the slab, seal annular space at ends with caulk, foam or other means. Also assure proper protection of pipe to U.V. light. ANY CHANGES OR ALTERATIONS TO SUBMITTED PLANS MUST BE RESUBMITTED AND APPROVED BEFORE WORK IS DONE IN ORDER TO ASSURE CODE COMPLIANCE POST PERMIT CARD ON JOB SITE WHEN WATER MAIN PRESSURE EXCEEDS 80 PSI, AN APPROVED PRESSURE REDUCING VALVE SHALL BE PROVIDED THAT LIMITS THE MAXIMUM STATIC WATER PRESSURE TO 80 PSI RECESSED LIGHTING INSTALLED IN THE BUILDING ENVELOPE SHALL BE IC RATED AND SEALED TO PREVENT AIR LEAKAGE For residential applications with a glazing area that exceeds 150-. of the gross area of exterior walls, R-8 duct insulation is required. As an alterna ive, R-6 duct ----------------------- ---- ----i� -- ------------- BUILDING DEPT REPRESENTATIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3576 FAX: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- Page 4 Application Number 07-00002096 Date 7/24/07 Application pin number . . . 958784 ---------------------------------------------------------------------------- Special Notes and Comments insulation can be used if the a/c system has a SEER rating of 12 or more. PROVIDE SANITARY FACILITIES FOR WORKERS ON SITE LOCATED OFF THE PUBLIC RIGHT-OF-WAY. SMOKE DETECTORS MUST HAVE 3' CLEARANCE FROM FORCED AIR DUCTS, CEILING FANS AND RETURN AIR PROVIDE STRING LINES FOR ALL BUILDING SETBACKS AND EASEMENTS ON FOUNDATION INSPECTION. FORM SURVEY MAY BE SUBMITTED IN PLACE OF STRINGS. SHOWERS AND TUB/SHOWER COMBINATIONS SHALL BE EQUIPPED WITH AN ANTI -SCALD VALVE THAT LIMITS WATER TEMPERATURE TO 120 DEGREES THE COMBINED SOLAR HEAT GAIN COEFFICIENT OF ALL GLAZED FENESTRATION PRODUCTS DEPENDING ON PERCENTAGE OF WALL TO GLAZING RATIO UP TO 2001 A .40 OR LOWER FACTOR AND ABOVE 200 TO 30% A .35 FACTO OR LOWER SHALL BE MET. ALL SILLS AND BOTTOM PLATES IN CONTACT WITH CONRETE MUST BE TREATED OR NATURALLY RESISTANT TO INSECTS AND DECAY SMOKE DETECTORS SHALL BE INTERCONNECTED, 120 VOLT W/BATTERY BACKUP AND LOCATED IN EACH SLEEPING ROOM AND OUTSIDE EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS REMOVE ALL VEGETATION AND FOREIGN MATERIAL FROM SLAB AREA PRIOR TO PLACING FILL. FILL SHALL BE FREE FROM VEGETATION AND FOREIGN MATERIAL. STAIRS SHALL COMPLY WITH SECTION R-311 (2006 IRC) WITH A CONTINUOUS HANDRAIL OR SECTION 1009 (2006 IBC) AS APPROPRIATE, CONTINUOUS HANDRAIL NEEDED, ENDS SHALL BE RETURNED OR SHALL TERMINATE INTO A NEWEL POST OR SAFETY TERMINAL ON COMMERCIAL JOBS. WINDOWS ADJACENT TO TUBS WITHIN 60" ABOVE DRAIN SHALL BE TEMPERED GLASS TEMPERED GLASS REQUIRED IN WINDOWS WITHIN 24" OF DOORS IN ADJACENT WALLS AN APPROVED DEVICE FOR THERMAL EXPANSION CONTROL SHALL BE PROVIDED FOR BUILDINGS UTILIZING STORAGE WATER HEATING EQUIPMENT AND A PRESSURE REDUCING VALVE PER R308.4 GLAZING ADJACENT TO STAIRWAYS WITHIN 36" AND LESS THAN 60" ABOVE WALKING SURFACE MUST BE TEMPERED (2003 IRC) RANGE/DRYER DUCT MUST COMPLY WITH 2O06 IMC -----------------------------------------Ji-------------- BUILDING DEPT REPRESENTATIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764'-3576 . FAX,: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- Page 5 Application Number 07-00002096 Date 7/24/07 Application pin number ---------------------------------------------------------------------------- 958784 Special Notes and Comments IF AN OPERABLE WINDOW IS MORE THAN 72" ABOVE EXTERIOR FINISHED GRADE THEN THE LOWEST PART OF THE WINDOW OPENING MUST BE AT LEAST 24" ABOVE THE FINSHED FLOOR FROM INSIDE THE ROOM. ALL PLUMBING, ELECTRICAL, AND HVAC (mechanical) WORK MUST BE PERFORMED BY LICENSED CONTRACTORS. CONTACT BUILDING DEPARTMENT FOR INSPECTIONS PRIOR TO COVERING ANY WORK ---------------------------------------------------------------------------- Other Fees . . . . . . . . . SEWER TAP 4" 350.00 WATER TAP 3/4" 400.00 ---------------------------------------------------------------------------- Fee summary Charged --------------------------- Paid Credited Due ---------- Permit Fee Total 583.00 -------------------- 583.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 750.00 750.00 .00 .00 Grand Total 1333.00 1333.00 .00 .00 ----------------------------------- - - - - -- vI--- --- --- - --�-------------- BUILDING DEPT REPRESENTATIVE: APPLICANT: TEMPORARY POLE PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVE COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 ---------------------------------------------------------------------------- Application Number 07-00002097 Date 7/24/07 Application pin number . . . 043688 Property Address . . . . . . 2402 STONE CASTLE CIR Property ID: 184200-1710-0100 R #• Application type description TEMP POLE Subdivision Name . . . . . . CASTLEGATE PH 1 SEC 7 Property Use . . . . . . . . RESIDENTIAL Property Zoning . . . . . . . PLANNED DEVL HOUSING Application valuation . . . . 0 Owner Contractor ------------------------ ------------------------ PITCOCK & CROIX P.O. BOX 10276 COLLEGE STATION TX 77842 (979) 764-7551 ---------------------------------------------------------------------------- Permit . . . . . . TEMP POLE PERMIT Additional desc . . BK Permit pin number . 515205 Permit Fee . . . . 20.00 Issue Date . . . . 7/24/07 Valuation . . . . 0 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . TEMP ELECT POLE CONNECT 45.00 ---------------------------------------------------------------------------- Fee summary ----------------- Charged ---------- Paid Credited ---------- Due Permit Fee Total 20.00 -------------------- 20.00 .00 .00 Other Fee Total 45.00 45.00 .00 .00 Grand Total 65.00 65.00 .00 .00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BUILDING DEPT REPRESENTATIVE: APPLICANT: co CITY OF COLLEGE STATION PlanningdDa IepmrntSendm APPLICATION FOR BUILDING PERMIT 1101 TEXAS AVENUE COLLEGE STATION, TX 77840 ' (979) 764-3570 (979) 764-3496 FAX W W W.CSTX.GOV ADDRESS/LOCATION: 24C Stone Castle Circle LOT v BLOCK _1 /SUBDIVISION For Oft& U:0* DATE:�I�CC RE'G APPLICATION # )V90 TEMP POLE #t —o t 7 CASTLEGATE SEC/PH_7/1 BUSINESS/OWNER NAME: PHONE:979/764-7551 CONTRACTOR/HOMEOWNER: _Randall W Pitcock PHONE:979/764-7551 CONTACT PERSON FOR REVIEW COMMENTS: _Randall W Pitcock PHONE:979/571-7774 FAX: _979/693-5400 EMAIL:_RANDALL@PITCOCKHOMES.COM ELECTRICIAN: M & M Electric PLUMBER: Ronnie West Plumbing HVAC: Climate Masters " GOOD CENTS (Residential only): ACCESSORY/STORAGE LOCATION RE -ROOF ADDITION MOVING SHELL ONLY DEMOLITION (Asbestos Survey) X NEW CONSTRUCTION " SLAB ONLY DUPLEX (Landscape Plans) REMODEURENOVATION• SWIMMING POOL TENT/CANOPY DESCRIPTION OF WORK: New single family residence PROPOSED USE: Residence HOMEOWNER ASSOCIATION/ARCHITECTUAL OR DESIGN REVIEW COMMITTEE APPROVAL: Yes TEXAS ACCESSIBILITY STANDARD (TAS) PROJECT REGISTRATION# EABPRJ VALUATION: $140514.00 o� (Cost of Labor and Materials) nX PUBLIC SEWER SEPTIc1TREATMENT SYSTEM SEWER TAP: ❑X WATER TAP: 01 OTHER TAP: ZE� TEMP POLE 4" SIZE g/ n SIZE SIZE TOTAL AREA:2566 NUMBER OF BEDROOMS: HEATED AREA: 2129 3 NUMBER OF BATHROOMS: 3 �./�E TYPE: SINGLE F DOUBLE FX II% ni ATTACHED DETACHED CA PORT PV % IGNATURE OF APPLICANT: '4p�e "If proposed work involves new comrfiercial corfstruction 6r fadade improvemeffg/renovations to an ex commercial property, building elevations are required. Official Use Only Plans Examiner Zoning Official y�ire Ma all rj.�T,,,1dG Comments: — AWLIWf &e R,mvr &-/�e Jry co.) Ab -rA4 I # w4d Rmt�k btlll�:5; I ... - ti Energy Code Compliance Information % Glazing of exterior walls 13.7% Insulation R value of exterior walls 13 Insulation R value of ceiling 1 (flat areas) 30 Insulation R value of ceiling 2 (vaulted areas/no attic) 30 Glazing SHGC (Solar Heat Gain Coefficient) .36 Glazing U-Factor .60 R value of ductwork 6 / A/C SEER Rating 13 Protection Against Subterranean Termites x Chemical Termiticide Treatment (Soil Treatment) ❑ Chemical Termiticide Treatment (Field Applied Wood Treatment) ❑ Physical Barriers ❑ Other *Verification of Application shall be submitted to the City of College Station Building Department prior to issuance of the Certificate of Occupancy. 'w PLAN -REVIEW ONE and TWO FAMILY OCCUPANCY REQUIREMENTS CITY OF COLLEGE STATION 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 (979) 764-3570; (979) 764-3496 FAX PLAN REVIEW/PERMIT NUMBER# D -"7 ` DATE: ,7 BUILDING ADDRESS: I. Foundation Requirements- Minimum City Foundation Standards N A. Concrete minimum compression strength of 3000 PSI B. Minimum four 4 inch slab thickness C. Vapor barrier Emil. Poly min. D. Slab/beam or pier layout shown 1. Footings/beams are continuous over the length and width of foundation 2. Footings 30" exterior, 24" interior, unless over 60' long must be 30" 3. Spacing of beams does not exceed 15' E. Reinforcement details to meet minimum requirements 1. Slab reinforcement 2. Exterior beam reinforcement 3. Interior beam reinforcement 4. Masonry fireplace foundation reinforcement F. Wood foundation details indicated p II. Framing: Floor, Wall, Ceiling and Roof Requirements N A. Girder or sill dimensions, grade & species B. Floor joist size, spacing, grade & direction of span indicted on plans C. Treated sill plate or bottom plate D. Tenant separation in duplex K 1. One -hour rated extending to roof deck N OK E. Header sizes indicated on plans N F. Emergency bedroom egress 1. Exit direct to outside 2. Operable window a. Twenty 20 inch clear width by twenty-four 24 inch clear height b. Maximum sill height of forty-four 44 inches above finished floor G. Operable bathroom window required when mechanical ventilation is not provided H. Stud grade andspacing I. Exterior wall details 1. Sheathing indicated on plans for Wall Bracing 2. Moisture barrier indicated on plans 3. Exterior Wall Covering J. Roof framing Ian or elevation shown K. Ceiling joist size, spacing, grade and direction of span indicated on plans L. Attic access location and size indicated on plans M. Span exceeding code tables must be engineered N. Rafter size, spacing, roof slope & purlin bracing if required to reduces an O. Roof covering P. All girders & beams for support of floors, walls, ceiling & roofs must have the size, grade & location indicated on plans Q. Tempered Glass required in all hazardous locations 1 ,PLANS REVIEW ONE and TWO FAMILY OCCUPANCY REQUIREMENTS CITY OF COLLEGE STATION 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 (979) 764-3570; (979) 764-3496 FAX R. 18" Overhangs allowed on zero lot line, non-combustible perforated soffit only S. All walls within 3' of property line to have protected openings. III. Stairway Requirements K Q A./OK A. Stairway Details N 1. Maximum riser height 7-3/4 inches 2. Minimum tread width 10 inches 3. Stairway risers are uniform 3/8" Max. difference 4. Stairway width not less than 36 inches 5. Stairway headroom not less that six ft. eight 6-8 B. Winder details 1. Treads a minimum of six 6 inches on narrow edge 2. Treads a minimum often (10) inches at a distance of twelve (12) inches from the narrow edge C. Spiral stairway details 1. Riser height less than nine and one-half 9-1/2 inches 2. Treads a minimum of seven and one-half (7-1/2) inches at a distance of twelve (12) inches from the narrow edge 3. Stairway width not less than thirty-six inches 4. Headroom required not less than six ft six 6-6 inches 5. All treads must be identical D. Guards/handrail details 1. Guards required when a porch, deck, balcony or landing is thirty (30) inches above grade or finished floor 2. Handrails are required on stairways located two or more risers above floor/grade 3. Handrails must be thirty-four to thirty-eight (34-38) inches when measured from the leading edge of the tread 4. Handrails must not project more than four & one-half (4-1/2) inches into width of a stairway 5. Guards must be a minimum of thirty-six 36 inches above finished floor 6. Guards & handrails along open-side(s) of stairway must have intermediate railing or uprights that prevent the passage of a four 4 inch sphere IV. Fireplace Requirements NA/019 A. Hearth extensions 1. Fireplace opening < 6 s , ft, extensions: 8" & 16" forward 2. Fireplace opening > 6 s . ft. extensions: 12" side & 20" forward B. Masonry fireplace requires 2" clearance from all combustible materials C. Chimneys must meet IRC Chapter 10 Requirements V. Electrical Service Requirements A. Electrical plan to include: INA�r 1. Electrical fixtures & switches indicated 2. Smoke detector locations indicated as required 3. GFI circuits indicated where required 4. Arc fault protection for bedroom circuits 5. Panel location PLAN -REVIEW ONE and TWO FAMILY OCCUPANCY REQUIREMENTS CITY OF COLLEGE STATION 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77840 (979) 764-3570; (979) 764-3496 FAX VI. Plumbing Requirements A. Pressure reducing valve required when water pressure exceeds 80 psi N K B. Plumbing access to bathtubs C. Means for thermal expansion provided when required D. Water heaters elevated 18" when installed in the garage or room directly off garage VII. Mechanical Requirements N K A. All mechanical ventilation's in bathrooms & range hood ventilation must be ducted to outside excludes ductless units B. Attic installed H.V.A.C. requirements: 1. Twenty-four (24) inch wide unobstructed walkway from attic access to equipment must be provided 2. Attic access located within 20 feet of equipment C. Combustion air supplied for gas appliances when required) VIII. Energy Requirements N K A. Compliance software worksheet MECcheck submitted, or B. Energy data supplied Percent of glazing, insulation R-values, window U-values, etc. Zoning Ordinance Requirements — Ordinance 850 IN Permitted use for district Density requirements Minimum lot size Setbacks Easements Required parking Street Ordinance Requirements N Maximum drive width for residence is 25' combined for circular and 12' minimum for single Minimum 20 feet from driveway to side(intersecting) street property line sight triangle Driveway access to lesser street for corner lots Subdivision Regulations — Ordinance 690 N Approved subdivision Plat filed Flood lain Regulations — Ordinance 1301 N Does not block any water course or divert any flow Elevation certificate needed K "APPROVED PLANS PER IRC SECTION R106.3.1." L S EXAMINER `� - f 3 -01 DATE