HomeMy WebLinkAboutSP2015-000060ENGINEER:
TEXAS A IIENUE SO U
VICINITY MAP
INDEX OF SHEETS
SP - SITE PLAN
DP - DEMOLITION PLAN
LP - LANDSCAPE PLAN
I - IRRIGATION PLAN
k.,
OWNER:
HA VER TY FURNITURE COMPA, NIES, INC.
CIO BRAD SMITH
780 JOHNSON FERRY RD NE, SUITE 800
GA 30342
ARCHITECT:
+197J
�� is rn
c�.
PROJECT BENCHMARK: None.
0
N
n
BOLT SIGN TO TUBE WITH
3/8" CADMIUM PLATED
BOLTS, NUTS, & WASHERS
"U" CHANNEL POST
(3 LB/FT) PAINT BLACK
4" STEEL PIPE BOLLARD
FILLED w/ 3500 PSI CONCRETE
PAINT TRAFFIC YELLOW.
00
CONCRETE
SIDEWALK
12"
RESERVED
PARKING
MAXIMUM -
FINE $500.0
3500 PSI
CONCRETE v A N
ACCESSIBLE
VAN ACCESSIBLE SIGN
USDOT-FHWA MUTCD R7-8a
TEXT PER
LOCAL CODE
GREEN
REFLECTORIZED
BACKGROUND -
WHITE REFLECTORIZED
BORDER -
GREEN REFLECTORIZED
LETTERING -
GREEN REFLECTORIZED
NOTES:
1. ALL TRAFFIC CONTROL DEVICES SHALL MEET ALL CURRENT USDOT-FHWA MUTCD STANDARDS.
2. ALL SIGNS SHALL CONFORM WITH ALL CURRENT A.D.A., FEDERAL, STATE AND LOCAL CODES AND REGULATIONS.
3. PLACE "VAN ACCESSIBLE" SIGN IN FRONT OF VAN ACCESSIBLE SPACES ONLY.
4. ALL SIGNS TO BE 0.080" THICK ALUMINUM.
4. WHEN SPACE IS ADJACENT TO BUILDING, SIGN MAY BE MOUNTED TO BUILDING.
HANDICAP SIGN ,& MOUNTING DETAIL
N.T.S.
3204 EARL RUDDER FWY S.
SITE
Con. rete
___ �� � I� scale: ,I
Pavement ---__r�\ �.
f 1 Inch 50o feetn COLLEGE STATION, TX 77845
PLAN & DESIGN SPECIALISTS IN
j CIVIL ENGINEERING • HYDRAULICS
--------------------------- ---------------------=�
_ HYDROLOGY s UTILITIES +STREETS
P TARGET SITE PLANS +SUBDIVISIONS
----------------------------------------------------- t. s
www.mitchellandmorgan.com
20Nov15
L------------------------------------------ OF TF
ICN Y MAP '
JOEL J. MITCHELL
/................. ....... ........
p 80649 Q ,
I
.�\ SSA • c,
' I AL
I '
cale:
f i InchS� 20
7
I I 0.0
-0COConstruction Notes: I a m
1. This layout was completed without benefit of survey.
The contractor shall use existing features (curbs,
paint lines, etc.) to establish the location of all I I W
proposed facilities. Contact engineer if assistance is I I
-------J required.
2. All Dimensions are to face of curb. _ \
3. All landscape beds shall be excavated to remove all As halt I /
I asphalt, base, concrete, and stabilized material. The Pavement' ! I \� \ = o
excavation shall be a minimum of 18" deep, or to
the bottom of the structure, whichever is deeper. i /ir i �� I o r
The entire excavation shall be backfilled with topsoil. �! I O D N Q
4. All pavement concrete and as halt to be removed �! �� - '-'-I X
shall be saw cut prior to demolition to provide a Proposed Havertys Furniture ,. I �- Of z i-
L----------- neat joint. I _0 ? Lu
5. All concrete sidewalk shall be at least 4" thick 3000 j ¢ zo
Lo
psi concrete with #3 bars at 12" on center each I a Q Q
zM I !2 X F-
way. Sidewalks shall be placed on 2" (minimum) I N W N
cement stabilized sand. =-- L- >Ld
6. All concrete pavement shall be at least 6" thick o
cJ
I f
3000 psi concrete with #4 bars at 16" on center ;.; i i +" i oN _J
each way. Concrete Pavement shall be placed on 6" 20 23' I
(minimum) cement stabilized sand. I i'
7. All asphalt pavement shall consist of 2" Type D i I
HMAC per TxDOT Specification 340 on top of 8"
cement treated limestone base (3% cement)
GENERAL CONSTRUCTION NOTES: herein. Testing shall be provided by a certified laboratory, at the Owner's expense, to verify these standards.
1. It shall be the responsibility of the Contractor to verify the exact location of ALL existing underground Any retesting due to substandard work shall be at the expense of the Contractor. Structural areas shall Include 8. All sidewalks and pavements Shall be graded to
utilities. Furthermore, the Contractor shall contact all utility company representatives a minimum of 48 hours in all sidewalks and shall extend 5' beyond the curb lines of all streets, alleys and parking areas. provide 2% slope away from the building.
advance of any excavation. 6. It is the responsibility of the contractor to comply with all State and Federal Regulations regarding
construction activities near energized overhead power lines. Additionally, the contractor shall coordinate all
a. Contact Dig Tess ® 1-800-344-8377 proposed work and procedures with the City of C.S. Electrical Division.
b. Contact Dan Augsburger ® Suddenlink 595-2429 7. All materials & labor not identified as a Separate Bid Item shall be considered subsidiary to the item in
C. Contact Richard Wallace ® Verizon 821-4752 which it is used. All materials and equipment shall be both furnished and installed unless otherwise noted.
d. Contact Sam Weida ® CSU (ELectrical) 764-6255 8. The Contractor must provide construction staking from the information provide on these plans.
e. Contact Butch Willis ® CSU (Water/Wastewater) 764-3660 9. All soil exposed by construction shall receive cellulose fibermulch seeding.
f. Contact Luis Cisneros ® Atmos Gas (Gas) 229-4627 10. Trenches may be left open overnight if properly barricaded. Clay Pavers at building entrance. Foundation
11. Adjustment of Water Meters, Valves, Manholes, Irrigation Systems, and any other Public or Private Utility,
2. All construction shall be in accordance with the current City of College Station (C.S.) Standard etc. are not separate pay items. The Price of the adjustment shall be subsidiary to the construction of Sewer per manufacturer's recommendations.
Specifications for Street Construction, B/CS Unified Technical Specifications, Water and Sewer and Generals, 2012, Line, Force Main, etc.
and BCS Unified Design Details. All inspection shall be performed by the staff of the City Engineer of C.S. All 12. The contractor shall coordinate with Suddenlink Communications, CSU, ATMOS, and Verizon to adjust the
construction shall be coordinated with the City of C.S. City Engineer. location of existing facilities, if necessary.
or traffic control in accordance with TMUTCD. This is not a separate a
indicated in these Ions the Contractor shall obtain written 13. The contractor is responsiblef P P Y
3. In lieu of using the construction materials p�y
approval from the City Engineer for any substitution prior to Construction. Requests for changes should include item. Concrete , Sidewalk
of Section 7 .11 of the
Unifie
d Development
will meet the standards n ite i htin I Building and IP
financial) responsible for 14. Exterior
e contractor shall be9
product information and an engineers seal where applicable. The y p9 9
9 PP
the engineer's time spent reviewing changes and redesigning based on contractors requests. Ordinance. The light source shall not project below an opaque housing and no fixture shall direct) project light
9 P 9 9 9 9 q 9 P 19 Y P J 9
cross an •------------- �'=-"=-----
4. Trench Safety Requirements shall be in accordance with O.S.H.A. Standard 29 CFR Part 1926 Subpart P and horizontally. Fixtures will be mounted m such a manner that the protected cone of light does not y �
i
I
all federal, state and local regulations. property line. I
5. TRENCHING AND BACKFILLING: All trenching and backfilling shall conform to the specifications set out 15. Contractor shall provide parking lot striping in accordance with the layout shown on these plans. I I
I
I I
I
SITE PLAN NOTES:
1. Name of Project: Havertys Furniture, 35,400 S.F.
2. Legal Description:
LOT 1, KAPCHINSKI HILL
8.21 Acres
3. Owner: Haverty Furniture Companies, Inc.
4. Engineer: Mitchell & Morgan, L.L.P.
3204 Earl Rudder Fwy S
College Station, Texas 77845
(979) 260-6963
5. Zoning: GC General Commercial
6. Existing Use: Retail Proposed Use: Retail
7. Setbacks: Per City of College Station Ordinances
8. Site Area: 8.21 acres
9. Water Demands : No changes from existing system.
10. Sanitary Demands: No changes from existing system.
11. Parking: Existing 410 Spaces.
Proposed 399 Spaces.
Required 87,199 / 250 = 349 Spaces.
Engineers Drainage Certification:
The improvements to this site do not impact the existing
drainage conditions. The design of the site maintains the
existing drainage patterns in both character and quantity. No
modifications to the existing drainage system and detention
system are warranted.
This site does not lie within the 100-year floodplain boundary
per FEMA's Flood Insurance Rate Map panel 48041 CO305F.
Effective Date: April 2, 2014.
Disturbed Area = 0.00 Acres. No soil will be exposed with this
construction.
4" High White Lettering
4" High Red Stripe
177277: i,Ska°`r FIRE LANE -NO PARKING -TOW AWAY ZONE
All curbs and curb ends designated as
firelanes on plans shall be painted red
with four (4) inch white lettering stating
"FIRE LANE -NO PARKING -TOW AWAY ZONE"
Wording may not be spaced for more than
fifteen (15) feet apart.
FIRE LANE STRIPING DETAIL
FIDE LANE
DESIGNATED
PARKING
ONLY
18" x 12"
See Ordinance for
additional Information
on companion TOW AWAY sign
FIRE LANE SIGN
_____________
I • I
Existing Handicap
facilities & Parking
to remain.
Fire Department Handicap Parking Signs
Knox Box mounted to be provided on each
6' High on wall. space.
I
I
I
I
I
L
Concrete :Sidewalk
a.
y,.
1 _
l-
r` 63' '
ca
2 5� �+ 15.5 �- � 27 15.5 ?, E2_5'
00 B VAN`
, =- -
RE
NL B Landscape Island
Directional Bore irrigation to new Stripe all curbs per �
landscape islands. Fire Lane Requirements
If
I .1
I I
L'
J \
I
I
I
I
I
I �
I . I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ELEVAT I0
CEO " IFICATE
[] REQUIRED
❑ +1'
❑ +2'
❑ +3'
❑ +4' .
MNOT REQUIRED
RE V1 P
Oil P ""IA1I C r
JIAN08201/1 �A�
COLLEGE STATION
ENGINEE RING
REVIEWED FOR
COMPLIANCE
JAN 0 8 2016
COLLEGE STATION
DEVELOPMENT SERVICES
PLAT FILED: 1. i,.j
Of 4 Sheets
PROJECT BENCHMARK: None.
SEAL W EXPANSION JOINT MATERIAL SMOOTH DOWEL BAR, See detail
/ for diameter, length and spacing
(SONOBORN SL-1 OR APPROVED EQUAL) (3/4"x18" @ 12" O.C. for curbs & concrete pvmt.
Install per Manufacturer Specification , 3/4" (1 /2"x18" @ 12" O.C. for sidewalk)
nenvrn nnn_ � 1"
r.1
Df rebar of the
rb and tie it to the
e new curb.
CONNECT TO EXISTING CURB DETAIL
NTS
New Concrete I Existing Concrete
Proposed Reinforcement Drill & Epoxy Proposed
See Detail
Reinforcement into Existing
Concrete (Min. 9" Depth Drill)
Match thickness (Epoxy per TxDot 5016)
to existing concrete
o oQ a
CONNECT TO EXISTING CONCRETE DETAIL
NTS
SECTION A -A
FIELD BEND
EXISTING REINFORCEMENT
INTO NEW CURB ---
to
Co
ttT � — —
TYPE 3 CURB
FOR USE WITH CONCRETE PAVEMENT OR APRON
NOT A SEPAIRATE PAY ITEM
1/4" WIDE x 1" DEEP GROOVE
METAL KEYWAY PLATE SEAL W/ JOINT MATERIAL
W/ FORMED GROOVE (SONOBORN SL-1 SEALANT
EDGE ROUNDED TO OR APPROVED EQUAL
1 /4" RADIUS 15" MIN. LA ERAL REINFORCEMENT
LAP (SEE PAVEMENT TYPICAL
SECTIONS)
See Pavement
Detail
\-- SECOND POUR
FIRST POUR —/ V
REBAR TO BE CENTERED IN SLAB
LONGITUDINAL JOINT
LONGITUDINAL JOINT SHALL BE REQUIRED AT THE
STREET CENTERLINE
DRILL & EPDXY #3 BARS 12"
X 16" @ 12" OC 2%
77
0 5\�
PROPOSED CURB / /�'`#3 BARS CENTERED IN 5"
AND GUTTER 0 3500PSI CONCRETE
LIME STABILIZED SUBGRADE
i
* NOTE: WALK OFF CAN BE CONSTRUCTED
MONOLITHICALLY WITH CURB AND GUTTER.
WALK OFF AT CURB
NTS
Limit of Pavement Concrete
for Asphalt Pavement
Edge of Existing
Pavement
1 " Type D HMAC
Reinforced
2 Type B HMAC a .,`,E
6" Base ,{.. Y ` Concrete
,.. ;
8" LSSB 6" LSSB
PARTIAL DEPTH '
SAW CUT - LEAVE
EXISTING REINFORCEMENT
CONSTRUCT CURB ON EXISTING
CONCRETE PAVEMENT
See BCS United Standards for curb details
NTS
M
/ A- / \
Remove Existing Parking Island
(concrete) and parking striping. /
•
— — — — — — — — —--------------------�
---------------------
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - - - - - - - — - - - `
1 I
I
I
------I L-------------------------------------------------------------------------------— — — — — — — — — —
-------- -
I '
I '
C------------------
1 1
�4
Remove Existing Parking Island
(concrete, stabilized material, etc)
J \
I
I
I
1
I
1 - I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
HTC H ELL F
a
MOoRGAN
T.979.260.6963
F.979.260.3564
FIRM# 1443
3204 EARL RUDDER FWY S.
/
i COLLEGE STATION, TX 77845
/ PLAN & DESIGN SPECIALISTS IN
/
CIVIL ENGINEERING * HYDRAULICS
HYDROLOGY * UTILITIES * STREETS
SITE PLANS * SUBDIVISIONS
www.mitchellandmorgan.com
20Nov15
/ * :. *.
JOEL J. MITCHELL
�
o
Nam
-�
02 Q
G
0
00
�r-
w
O r`
1-
Li
L°
Z
W
�
Z t-
-�
W
N
Qo
U
�
aQ
Q
o'
w N
QLin
_
_- 0
O J
O J
N
O
U
I
co
C
O
N
li
Dp
Of 4 Sheets
PROJECT BENCHMARK: None.
0
4
r
n
Landscape Legend
Symbol
#
Size
Name
®
1
45G
Live Oak
•
4
30G
Crape Myrtle(NATCHEZ)
®
2
30G
Crape Myrtle(TONTO)
38
3G
Knockout Rose
28
3G
Hawthorne(CLARA)
0
191
1 G
Mexican Feather Grass
General Notes
General Contractor to leave landscape islands final
grade 4" below top of curb.
Landscape Contractor to add 4" to 5" of Bed Mix
soil to Landscape islands before installation of plants.
Islands to have a crown for drainage.
Typical Planter Bed
Havertys 9 Fu rn*�tu re
Landscape Island
12 Mexican Feather Grass
2 Knockout Rose
1 Tonto Crape Myrtle
Landscape Island
12 MexicanFeather Grass
2 Knockout Rose
1 Tonto Crape Myrtle Cover Landscape Islands with 3"
min. of Bagged Hardwood Mulch
0000000000
00 0 0 0
00 ' 0 0-
0 �� 0.
0 00
0 ,= . 0
00.
0
0
000
0 ( 00
0 0
0 0
0 0
0 0
0 0
0 �0
0 0
0
00 00
00 • 00
000 Landscape Island
0000.
p
00 00 86 Mexican Feather Grass
0.1 0 36 Knockout Rose
0- 0 4 Natchez Crape Myrtle
00, p y
00
00
0
Landscape . •
81 Mexican Feather
Hawthorne
I Live •.
HTC H LL
.. .. ..ND* k!o ics CQI .'
MO°GAN
T.979.260.6963
F.979.260.3564
FIRM# 1443
3204 EARL RUDDER FWY S.
COLLEGE STATION, TX 77845
PLAN & DESIGN SPECIALISTS IN
CIVIL ENGINEERING * HYDRAULICS
HYDROLOGY * UTILITIES * STREETS
SITE PLANS * SUBDIVISIONS
www.mitchellandmorqan.com
10 OF TF
................
• PETER B VANECEK •
�•. 602
GOO/ S T
CqR,• •RG /%
0
co
r,
W Or
NCO
0 ~ W X
Z
D W
L
� N N H
af X N
W
Ld ~ W
_ 0O W
O J
N J
O
U
M
0
.�2
01-1
v1
O
4,- p:Z
� � Q
W
J � J
O
v
fop
Of 4 Sheets
PROJECT
BENCHMARK: None.
1�LL
F,[1AN
T.979.260.6963
F.979.260.3564
RRIGATION
LEGEND
FIRM# 1443
FYVY S.
3204 EARL RUDDER
COLLEGE STATION, TX 77845
RAINBIRD 1" DRIP
ZONE KIT XCZF-100 PRF, 40 PSI
PLAN &DESIGN SPECIALISTS IN
CIVIL ENGINEERING * HYDRAULICS
HYDROLOGY * UTILITIES * STREETS
Ball valve
SITE PLANS * SUBDIVISIONS
www.mitchellandmor2on.com.
OF
C)PEVRB.61
CEK..T.E.E
VAN
LO �.
r
0
4,
N .D 0n
U C C
2,O
Scale: _I
o�
1 inch = 10 feet
o
r,
'
Flush valve
W o�
Q
L°- Z �i;
Z I-
H
Q X Q
fr W N
Q ~ W
0 J
J
N p
U
oaverHty's
°
urniture
Landscape Island
Install drip tubing
9" X 25" PLASTIC METER BOX
18" oc.
PRESSURE REGULATOR,30 PSI
1" ELEC.VALVE
YFILTER
General Contractor to
;
Install 2" sleeve to
,
i
landscape island.
BRICK SUPPORTS
Install 1" Drip zone kits
'
TYPICAL DRIP VALVE
SECTION
Rainbird XCF-100—PRF
Landscape
Island
Flush vale
Existing 1 2"
- Install drip
tubing
N rrigation Line
18" oc.
FI sh valve
TORO BATT.CONTROLLER DDC P-4-9V
N I" X 18" METER BOX
� Q
1/2
-------------- —-----------------
----------------------------------------
---=--`-------------------------
----------------------
- -----
.I
------------------------------------
—-
(�3 �.
General Contractor
Install 2" sleeves
to
to
Directional
Bore
Install
Landscape Island
p
drip tubing
�
� O
islands.
Install 2
sleeve
landscape
landscape
island.
18 oc.
Landscape Island
Directional
Install 2"
Bore Existing Water
sleeve Tee Into eXIS g Meter and
Q
co
Install drip
tubing 18"
oc.
landscape
island. 1 >> Doublecheck
Netafim or
equal
1 2 Backflow D vi
with built in emitters,
18" O.C.
Irrigation
gation line and
add a 1 " Ball
�L�j
Q J
Valve
J
O
v
LO
U
a�
0
D
N
N
n
,Of 4 Sheets