Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Approved Plans
'ex 9010" • ARCHITECTURAL M.E.P. STRUCTURAL STRUCTURAL A1.00 COVER SHEET A4.00 EXTERIOR ELEVATIONS M-1.1 Mechanical Site Plan SO-0 COVER SHEET S4-1 ROOF FRAMING PLAN - BUILDING #8 & #9 A1.01 SITE PLAN A4.01 EXTERIOR ELEVATIONS M-1.2 Mechanical Specifications & Details SO-1 GENERAL NOTES S4-2 PARTIAL ROOF FRAMING PLAN - BUILDING #1 A1.02 UNIT ADDRESS PLAN A4.02 EXTERIOR ELEVATIONS / BUILDING SECTIONS M-2 Mechanical Plans - Units A1,A1A,B,C,D,E,F,A2,A2A SO-2 FOUNDATION SECTIONS AND DETAILS S4-2A PARTIAL ROOF FRAMING PLAN - BUILDING #1 A1.03 CORRIDOR FINISH & TRUSS DEPTH LOCATION PLAN M-3 Mechanical Plans - Units B1,BtA,B,C,D,E F,B2,B2A,B3,B3A,B,C,B3-HC, A4.03 EXTERIOR ELEVATIONS BUILDING SECTIONS SO-2A FOUNDATION SECTIONS AND DETAILS S4-3 ROOF FRAMING PLAN -BUILDING #2 A1.04 BUILDING CODE DATA & UNIT MIX M-4 Mechanical Plans - Units B5,B5A,B7,B4 A4.04 EXTERIOR ELEVATIONS BUILDING SECTIONS SO-2B FOUNDATION SECTIONS AND DETAILS S4-4 PARTIAL ROOF FRAMING PLAN -BUILDING #3 A1.05 EXIT ANALYSIS LEVEL 1 M-5 Mechanical Plans - Units B6,B6A,B,C,D,C1-HC SO-3 SCHEDULES S4-4A PARTIAL ROOF FRAMING PLAN - BUILDING 3 A4.05 EXTERIOR ELEVATIONS BUILDING SECTIONS M-6 Mechanical Plans -Units D1,D1-HC,D2-1,D2-A1,D2-2,D2-A2 # A1.06 EXIT ANALYSIS @ TYPICAL UPPER LEVEL A4.06 ENLARGED ELEVATIONS SO-4 FLOOR FRAMING SECTIONS AND DETAILS S4-5 ROOF FRAMING PLAN - BUILDING #5 A1.07 EXIT ANALYSIS @ LEVEL 5 A4.07 ENLARGED ELEVATIONS M-7 Mechanical Plans - Roof SO-5 SHEARWALL SECTIONS AND DETAILS S4-6 ROOF FRAMING PLAN - BUILDING #7 A1.08 BUILDING AREA INCREASE AND 2 HR. WALL LOCATION M-8 Mechanical Plans - Roof SO-6 ROOF FRAMING SECTIONS AND DETAILS S4-7 ROOF FRAMING PLAN - BUILDING 6 A4.08 ENLARGED ELEVATIONS # A1.09 2HR. WALL DETAILS A4.09 ENLARGED ELEVATIONS SO-6A ROOF FRAMING SECTIONS AND DETAILS S4-8 ROOF FRAMING PLAN - BUILDING #4 A4.10 EXTERIOR ELEVATIONS BUILDING #8 & #9 CM-1.2 Mechanical Plans -Clubhouse First Level A1.10 UL ASSEMBLY CM-1.1 Mechanical Plans - Clubhouse First Level SO-6B FLAT ROOF FRAMING SECTIONS AND DETAILS A1.11 UL ASSEMBLY A4.11 BUILDING SECTIONS CM-2.1 Mechanical Plans - Clubhouse Second Level SO-7 GENERAL STEEL DETAILS A1.12 UL ASSEMBLY / TIME ASSIGNED & NER DESIGNS A4.12 BUILDING SECTIONS CM-2.2 Mechanical Plans - Clubhouse Second Level SO-7A MISCELLANEOUS SECTIONS AND DETAILS A1.13 UL ASSEMBLY / GYPSUM ASSOCIATION DESIGNS A4.13 BUILDING SECTIONS SO-7B MISCELLANEOUS SECTIONS AND DETAILS A1.14 FAIR HOUSING / ANSI TYPE 'B' GUIDELINES AT APTS & COMMON USE AREAS A4.14 BUILDING SECTIONS Al. 14A ANSI TYPE 'A' GUIDELINES AT APARTMENTS A4.15 BUILDING SECTIONS BUILDING #8 & #9 E-1.1 Electrical Site Plan S1-1 FOUNDATION PLAN - BUILDING #8 & #9 LANDSCAPE A1.15 ANSI STANDARD GUIDELINES FOR PUBLIC & COMMON SPACES E-1.2 Electrical Specifications & Details Si -is SLAB FORMING PLAN - BUILDING #8 & #9 A1.16 DOOR SCHEDULE A5.00 STAIR PLANS E-2 Electrical Plans - Units A1,AtA,B,C,D,E,F,A2,A2A S1-2 PARTIAL FOUNDATION PLAN - BUILDING #1 LO.00 COVER SHEET A1.17 WINDOW & STOREFRONT SCHEDULE A5.01 STAIR PLANS E-3 Electrical Plans - Units B1,B1A,B,C,D,E,F,B2,B2A,B3,B3A,B,C,B3-HC S1-2S PARTIAL SLAB FORMING PLAN - BUILDING #1 L1.00 LANDSCAPE KEY SHEET A1.18 STOREFRONT ELEVATIONS A5.02 STAIR PLANS E-4 Electrical Plans - Units B5,B5A,B7,B4 S1-3 PARTIAL FOUNDATION PLAN - BUILDING #1 L1.01 SITE LAYOUT PLAN A1.19 STOREFRONT ELEVATIONS A5.03 STAIR PLANS & STAIR SECTION E-5 Electrical Plans - Units B6,B6A,B,C,D,C1,C1-HC S1-3S PARTIAL SLAB FORMING PLAN - BUILDING #1 L1.02 SITE LAYOUT PLAN A1.20 STOREFRONT ELEVATIONS A5.04 STAIR SECTIONS E-6 Electrical Plans - Units D1, D1-HC,D2-1,D2-A1,D2-2,D2-A2 St-4 PARTIAL FOUNDATION PLAN - BUILDING #2 L1.03 SITE LAYOUT PLAN A1.21 STOREFRONT ELEVATIONS E-7 Electrical Plans - Building #1 1st Level # L1.04 COURTYARD "A" LAYOUT / MATERIALS PLAN A5.05 STAIR SECTIONS S1-4S PARTIAL SLAB FORMING PLAN -BUILDING 2 A1.22 ENLARGED WINDOW ELEVATIONS E-8 Electrical Plans - Building #1 2nd, 3rd, & 4th Levels A5.06 ELEVATOR SECTIONS /MAIL KIOSK S1-5 PARTIAL FOUNDATION PLAN -BUILDING #3 L1.05 COURTYARD "A" GRADING PLAN A1.23 ENLARGED WINDOW ELEVATIONS A5.07 SECTIONS THRU A/C CONDENSER PADS E-9 Electrical Plans - Building #2 1st, 2nd, & 4th Levels St-5S PARTIAL SLAB FORMING PLAN -BUILDING #3 A1.24 DOOR DETAILS E-10 Electrical Plans - Building #3 Section 1-1st & 2nd Levels L1.06 COURTYARD "B" LAYOUT / MATERIALS PLAN E-11 Electrical Plans - Building3 Section 1-3rd, 4th, & 5th Levels S1-6 PARTIAL FOUNDATION PLAN - BUILDING #3 A1.25 DOOR DETAILS A6.00 INTERIOR WALL SECTIONS WALL SCHEDULE # St-6S PARTIAL SLAB FORMING PLAN -BUILDING 3 L1.07 COURTYARD "B" GRADING PLAN A1.26 WINDOW DETAILS / E-12 Electrical Plans - Building #3 Section 2-1st & 2nd Levels # L1.08 COURTYARD "C" ENLARGED PLANS A1.27 WINDOW DETAILS A6.01 INTERIOR WALL SECTIONS E-13 Electrical Plans - Building #3 Section 2-3rd, 4th, & 5th Levels S1-7 PARTIAL FOUNDATION PLAN - BUILDING #5 A6.02 INTERIOR WALL SECTIONS E-14 Electrical Plans - Building #4 1st, 2nd & 4th Levels S1-7S PARTIAL SLAB FORMING PLAN - BUILDING #5 L2.01 DETAILS A1.28 WINDOW DETAILS A6.03 EXTERIOR WALL SECTIONS E-15 Electrical Plans - Building #5 1st, 2nd & 4th Levels S1-8 PARTIAL FOUNDATION PLAN - BUILDING #7 L2.02 DETAILS A1.29 NOT USED A6.04 EXTERIOR WALL SECTIONS E-16 Electrical Plans - Building 6 1st Level A1.30 WINDOW &MISC. FLASHING DETAILS g # S1-8S PARTIAL SLAB FORMING PLAN -BUILDING #7 L2.03 DETAILS /NOTES A6.05 EXTERIOR WALL SECTIONS E-17 Electrical Plans - Building #6 2nd & 4th Level S1-9 PARTIAL FOUNDATION PLAN - BUILDING #6 L3.00 LANDSCAPE KEY SHEET A6.06 EXTERIOR WALL SECTIONS E-18 Electrical Plans - Building #7 1st, 2nd, & 4th Levels Si-9S PARTIAL SLAB FORMING PLAN - BUILDING 6 L3.01 LANDSCAPE PLAN A2.00 UNITS Al, A1A, Al B, Al C, Al D, Al E, Al F, PLANS, INTERIOR ELEVATIONS E-19 Electrical Plans -Buildin Levels # A6.07 EXTERIOR WALL SECTIONS g #8 1st & 2nd LeS1-10 PARTIAL FOUNDATION PLAN - BUILDING #4 L3.02 LANDSCAPE PLAN A2.01 UNITS Al-H.C., PLAN, INTERIOR ELEVATIONS A6.08 EXTERIOR WALL SECTIONS E-20 Electrical Plans - Building #9 1st & 2nd Levels St-10S PARTIAL SLAB FORMING PLAN -BUILDING 4 L3.03 LANDSCAPE PLAN A2.02 UNIT A2 & A2A PLANS, INTERIOR ELEVATIONS E-21 Electrical Plans - Roof # A2.03 UNITS B1, B1A, BIB, B1C, BID, B1E, B1F, PLANS, INTERIOR ELEVATIONS A6.09 EXTERIOR WALL SECTIONS A6.10 EXTERIOR WALL SECTIONS E-22 Electrical Plans - Roof L3.04 COURTYARD "A" LANDSCAPE PLAN A2.04 UNIT B2 & 82A PLANS, INTERIOR ELEVATIONS A6.11 INTERIOR &EXTERIOR WALL SECTIONS E-23 Electrical Plans - Load Calculations & One Line Diagrams S2-1 PARTIAL 2ND FLOOR FRAMING PLAN - BUILDING #3 L3.05 COURTYARD "B" LANDSCAPE PLAN A2.05 UNITS B3, B3A, B3B, B3C & B3E PLANS, INTERIOR ELEVATIONS A6.12 INTERIOR & EXTERIOR WALL SECTIONS E-24 Electrical Plans - Load Calculations & One Line Diagrams S2-1A PARTIAL 2ND FLOOR FRAMING PLAN - BUILDING #3 L3.06 COURTYARD "C" LANDSCAPE PLAN A2.06 UNITS 133-H.C., PLAN, INTERIOR ELEVATIONS A6.13 SECTIONS AT BRIDGE E-25 Electrical Plans - Load Calculations & One Line Diagrams S2-2 PARTIAL 3RD FLOOR FRAMING PLAN - BUILDING #3 L3.07 LANDSCAPE SPECIFICATIONS A2.07 UNIT B4 PLAN, INTERIOR ELEVATIONS A6.14 EXTERIOR WALL SECTIONS (BLDG #8 & #9) E-26 Electrical Plans - Load Calculations & One Line Diagrams S2-2A PARTIAL 3RD FLOOR FRAMING PLAN - BUILDING #3 L4.00 IRRIGATION KEY SHEET S2-3 PARTIAL 4TH FLOOR FRAMING PLAN -BUILDING 3 A2.08 UNIT B5, B5A PLANS, INTERIOR ELEVATIONS # A6.15 STAIR &FLOOR DETAILS CE-1.1 Electrical Plans -Clubhouse First Level L4.01 IRRIGATION PLAN A2.09 UNITS B6, B6A, PLANS, INTERIOR ELEVATIONS A6.16 STAIR & FLOOR DETAILS S2-3A PARTIAL 4TH FLOOR FRAMING PLAN - BUILDING #3 CE-1.2 Electrical Plans -Clubhouse First Level L4.02 IRRIGATION PLAN A2.10 UNITS B6B, B6C & B6D PLANS, INTERIOR ELEVATIONS A6.17 FLOOR & BALCONY DETAILS CE-2.1 Electrical Plans - Clubhouse Second Level S2-4 PARTIAL 5TH FLOOR FRAMING PLAN - BUILDING #3 L4.03 IRRIGATION PLAN A2.11 UNIT B7 PLAN, INTERIOR ELEVATIONS A6.18 BALCONY FLASHING DETAILS CE-2.2 Electrical Plans - Clubhouse Second Level S2-4A PARTIAL 5TH FLOOR FRAMING PLAN - BUILDING #3 L4.04 IRRIGATION SPECIFICATIONS A2.12 UNIT C1 PLAN, INTERIOR ELEVATIONS A6.19 BALCONY FLASHING DETAILS CE-3 Electrical Colcs - Clubhouse S2-5 UNIT FRAMING A2.13 UNIT Cl-H.C. PLAN, INTERIOR ELEVATIONS A6.20 TYP. STEEL PROTECTION DETAILS S2-6 UNIT FRAMING A2.14 UNIT D1 PLAN, INTERIOR ELEVATIONS A6.21 BOX COLUMN & CAST STONE CAP PLANS S2-7 UNIT FRAMING A2.15 UNIT D1-H.C. PLAN, INTERIOR ELEVATIONS A6.22 BOX COLUMN PLANS P-1.1 Plumbing Site Plan S2-8 UNIT FRAMING A2.16 UNIT D2 PLAN, INTERIOR ELEVATIONS A6.23 ENLARGED PLANS & DETAILS P-1.2 Plumbing Specifications & Details S2-9 UNIT FRAMING A2.17 UNIT D2A & D2B PLANS, INTERIOR ELEVATIONS A6.24 WALL CORNER & MATERIAL TRANSITION DETAILS P-2 Plumbing Plans - Units A1,A1A,B,C,D,E,F,A2,A2A S2-10 UNIT FRAMING A6.25 MISC. EXTERIOR DETAILS P-3 Plumbing Plans - Units B1,B1A,B,C,D,E,F,B2,B2A,B3,B3A,B,C,B3-HC S2-11 UNIT FRAMING A6.26 MISC. EXTERIOR DETAILS P-4 Plumbing Plans - Units 65,85A,67,64 S2-12 UNIT FRAMING A3.00 SITE PLAN / BUILDING PLAN - LEVEL 1 A6.27 MISC. EXTERIOR DETAILS P-5 Plumbing Plans - Units B6,B6A,B,C,D,C1,C1-HC, A3.01 SITE PLAN / BUILDING PLAN - LEVEL 2 A6.28 MISC. EXTERIOR DETAILS P-6 Plumbing Plans - Units D1, D1-HC,D2-1,D2-A1,D2-2,D2-A2 S3-1 1ST FLOOR SHEARWALL PLAN -BUILDING #8 & #9 A3.02 BUILDING PLAN - LEVEL 3 A6.29 CANOPY DETAILS P-7 Plumbing Plans - Building #1 1st Level - Sanitary Sewer S3-2 2ND FLOOR SHEARWALL PLAN - BUILDING #8 & #9 A3.03 BUILDING PLAN - LEVEL 4 A6.30 ROOF DETAILS P-8 Plumbing Plans - Building #1 2nd, 3rd, & 4th Levels - Domestic S3-3 PARTIAL 1ST FLOOR SHEARWALL PLAN & 2ND FLOOR CORRIDOR FRAMING PLAN- BUILDING #1 A3.04 BUILDING PLAN - LEVEL 5 A6.31 ROOF DETAILS P-9 Plumbing Plans - Building #2 1st, 2nd, & 4th Levels - Sewer/Wat S3-3A PARTIAL 1ST FLOOR SHEARWALL PLAN & 2ND FLOOR CORRIDOR FRAMING PLAN- BUILDING #1 A3.05 BUILDING PLAN - ROOF LEVEL A6.32 ROOF DETAILS P-10 Plumbing Plans - Building #3 Section 1-1st & 2nd Levels - Sewer/Water S3-4 PARTIAL 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN - BUILDING #1 A3.06 NOT USED A6.33 ROOF DETAILS P-11 Plumbing Plans - Building #3 Section 1-3rd, 4th, & 5th Levels - Sewer/Water S3-4A PARTIAL 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN - BUILDING #1 A6.34 ROOF DETAILS P-12.1 Plumbing Plans - Building #3 Section 2-1st & 2nd Levels - Sanitary sewer S3-5 PARTIAL 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING #1 A3.07 BUILDING #1 - 1ST LEVEL PLAN P-12.2 Plumbing Plans - Building #3 Section 2-1st & 2nd Levels - Domestic Water S3-5A PARTIAL 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING 1 A3.08 BUILDING 1 - 2ND LEVEL PLAN A6.35 ROOF &ELEVATOR DETAILS # # P-13.1 Plumbing Plans - Building #3 Section 2-3rd, 4th, & 5th Levels - Sanitary Sewer S3-6 PARTIAL 4TH FLOOR SHEARWALL PLAN - BUILDING 1 MIS A3.09 BUILDING #1 - 3RD LEVEL PLAN A6.36 CONDENSER PAD SECTION &DETAILS P-13.2 Plumbing Plans - Building #3 Section 2-3rd, 4th, & 5th Levels - Domestic Water # A6.37 MISC. ROOF DETAILS S3-6A PARTIAL 4TH FLOOR SHEARWALL PLAN -BUILDING #1 A3.10 BUILDING #1 - 4TH LEVEL PLAN A6.38 MISC. INTERIOR DETAILS P-14 Plumbing Plans - Building #4 1st, 2nd & 4th Levels - Sanitary Sewer/Domestic Water S3-7 1ST FLOOR SHEARWALL PLAN & 2ND FLOOR CORRIDOR FRAMING PLAN - BUILDING #2 A3.11 BUILDING #1 - ROOF PLAN P-15 Plumbing Plans - Building #5 1st, 2nd & 4th Levels - Sanitary Sewer A3.12 BUILDING #2 - 1ST LEVEL PLAN A6.39 MISC. INTERIOR DETAILS P-16 Plumbing Plans - Building #6 1st Level - Sanitary Sewer S3-8 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN -BUILDING #2 A3.13 BUILDING #2 - 2ND LEVEL PLAN P-17.1 Plumbing Plans - Building #6 2nd & 4th Level - Sanitary Sewer S3-9 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING #2 CH.01 CLUBHOUSE LEVEL 1 P-17.2 Plumbing Plans - Building #6 2nd & 4th Level - Domestic Water S3-10 4TH FLOOR SHEARWALL PLAN - BUILDING #2 A3.14 BUILDING #2 - 3RD LEVEL PLAN CH.02 CLUBHOUSE MEZZANINE LEVEL P-18 Plumbing Plans - Building #7 1st, 2nd, & 4th Levels - Sanitary Sewer/Dom. Water S3-11 PARTIAL 1ST FLOOR SHEARWALL PLAN - BUILDING #3 A3.1BUILDING #2 - 4TH LEVEL PLAN CH.03 ENLARGED PLANS & INT. ELEVS P-19 Plumbing Plans - Building #8 1st & 2nd Levels - Sewer/Water S3-11A PARTIAL 1ST FLOOR SHEARWALL PLAN - BUILDING #3 A3.16 BUILDING #2 -ROOF PLAN CH.04 ENLARGED PLANS & MEZZANINE ALLOWABLE AREA PLAN P-20 Plumbing Plans - Building #9 1st & 2nd Levels - Sanitary Sewer S3-12 PARTIAL 2ND FLOOR SHEARWALL PLAN - BUILDING #3 A3.17 BUILDING #3 - 1ST LEVEL (PARTIAL PLAN) P-21 Plumbing Plans - Roof S3-12A PARTIAL 2ND FLOOR SHEARWALL PLAN - BUILDING #3 A3.18 BUILDING #3 - 2ND LEVEL (PARTIAL PLAN) P-22 Plumbing Plans - Roof S3-13 PARTIAL 3RD FLOOR SHEARWALL PLAN - BUILDING #3 A3.19 BUILDING #3 - 3RD LEVEL (PARTIAL PLAN) P-23 Plumbing Plans - Riser diagrams S3-13A PARTIAL 3RD FLOOR SHEARWALL PLAN - BUILDING #3 A3.20 BUILDING #3 - 4TH LEVEL (PARTIAL PLAN) INTERIOR P-24 Plumbing Plans - Riser diagrams S3-14 PARTIAL 4TH FLOOR SHEARWALL PLAN - BUILDING #3 A3.21 BUILDING 3 - 5TH LEVEL (PARTIAL PLAN P-25 Plumbing Plans - Riser diagrams S3-14A PARTIAL 4TH FLOOR SHEARWALL PLAN - BUILDING #3 A3.22 BUILDING #3 - PARTIAL ROOF PLAN P-26 Plumbing Plans - Riser diagrams ID0.00 COVER SHEET S3-15 PARTIAL 5TH FLOOR SHEARWALL PLAN -BUILDING #3 A3.23 BUILDING #3 - 1ST LEVEL (PARTIAL PLAN) P-27 Plumbing Plans - Riser diagrams A3.24 BUILDING #3 - 2ND LEVEL (PARTIAL PLAN) ID1.00 LEVEL ONE KEY PLAN & GENERAL NOTES P-28 Plumbing Plans - Riser diagrams S3-15A PARTIAL 5TH FLOOR SHEARWALL PLAN - BUILDING #3 A3.25 BUILDING #3 - 3RD LEVEL (PARTIAL PLAN) ID1.01 LEVEL TWO KEY PLAN & GENERAL NOTES P-29 Plumbing Plans - Riser diagrams S3-16 1ST FLOOR SHEARWALL & 2ND FLOOR CORRIDOR FRAMING PLAN - BUILDING #5 A3.26 BUILDING #3 - 4TH LEVEL (PARTIAL PLAN) ID1.02 LEVEL ONE FURNITURE PLAN P-30 Plumbing Plans - Riser diagrams S3-17 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN - BUILDING #5 A3.27 BUILDING 3 - 5TH LEVEL PARTIAL PLAN ID1.03 LEVEL TWO FURNITURE PLAN S3-18 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING #5 # ( ) ID1.04 LEVEL ONE FINISH PLAN CP-1.1 Plumbing Plans - Clubhouse First Level S3-19 4TH FLOOR SHEARWALL PLAN - BUILDING #5 A3.28 BUILDING #3 - PARTIAL ROOF PLAN ID1.05 LEVEL TWO FINISH PLAN CP-1.2 Plumbing Plans - Clubhouse First Level S3-20 1ST FLOOR SHEARWALL & 2ND FLOOR CORRIDOR FRAMING PLAN - BUILDING #7 ' A3.29 BUILDING #4 - 1ST & 2ND LEVEL PLANS CP-2.1 Plumbing Plans - Clubhouse Second Level A3.30 BUILDING #4 - 3RD & 4TH LEVEL PLANS ID2.01 LEVEL ONE DECORATIVE POWER PLAN CP-2.2 Plumbing Plans -Clubhouse Second Level S3-21 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN -BUILDING #7 A3.31 BUILDING #4 - ROOF PLAN ID2.02 LEVEL TWO DECORATIVE POWER PLAN S3-22 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING #7 A3.32 BUILDING #5 - 1ST LEVEL, 2ND LEVEL ID3.01 LEVEL ONE REFLECTED CEILING AND LIGHTING PLAN GE-1 Electrical Plans - Garage - First Level S3-23 4TH FLOOR SHEARWALL PLAN - BUILDING #7 A3.33 BUILDING #5 - 3RD LEVEL, 4TH LEVEL ID3.02 LEVEL TWO REFLECTED CEILING AND LIGHTING PLAN GE-2 Electrical Plans - Garage - Second Thru Fifth Levels, Sixth Level S3-24 1ST FLOOR SHEARWALL & 2ND FLOOR CORRIDOR FRAMING PLAN - BUILDING #6 A3.34 BUILDING #5 - ROOF PLAN I04.01 INTERIOR ELEVATIONS GE-3 Electrical Plans - Garage - Seventh Level S3-25 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN - BUILDING #6 - 1ST LEVEL PLAN ID4.02 INTERIOR ELEVATIONS GE-4 Electrical Plans - Garage - Calculations S3-26 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING #6 A3.35 BUILDING 5 # ID4.03 INTERIOR ELEVATIONS S3-27 4TH FLOOR SHEARWALL PLAN - BUILDING #6 A3.36 BUILDING #6 - 2ND LEVEL PLAN ID5.01 FINISH SCHEDULE GP-1 Plumbing Plans - Garage - First Level S3-28 1ST FLOOR SHEARWALL & 2ND FLOOR CORRIDOR FRAMING PLAN - BUILDING #4 A3.37 BUILDING #6 - 3RD LEVEL PLAN GP-2 Plumbing Plans - Garage - Second Thru Fifth Levels, Sixth Level S3-29 2ND FLOOR SHEARWALL & 3RD FLOOR CORRIDOR FRAMING PLAN - BUILDING 4 ID5.02 LIGHTING SCHEDULE # A3.38 BUILDING 6 - 4TH LEVEL PLAN GP-3 Plumbing Plans - Garage - Seventh Level S3-30 3RD FLOOR SHEARWALL & 4TH FLOOR CORRIDOR FRAMING PLAN - BUILDING 4 ID6 01 MILLWORK DETAILS # A3.39 BUILDING 6 - ROOF PLAN ID6.02 DETAILS A3.40 BUILDING #7 - 1ST LEVEL PLAN ID6.03 DETAILS A3.41 BUILDING #7 - 2ND LEVEL PLAN ID6.04 DETAILS &SECTIONS A3.42 BUILDING #7 - 3RD LEVEL PLAN ID6.05 ENLARGED PLANS A3.43 BUILDING #7 - 4TH LEVEL PLAN A3.44 BUILDING 7 - ROOF PLAN A3.45 BUILDING #8 - 1ST LEVEL, 2ND LEVEL & ROOF PLAN A3.46 BUILDING #9 - 1ST LEVEL, 2ND LEVEL & ROOF PLAN S3-31 4TH FLOOR SHEARWALL PLAN - BUILDING #4 1- illOnO&WWA oZ�and t& (iG Kathy Andrews Interiors smr Landscape Architects, Inc. Raymond Engineering, Inc. Sterling Engineering and Design Group Mitchell and Morgan, LLP Meeks + Partners, Architects Meeks + Partners, Architects Asset Plus Companies 9464 Kirby Drive 1708 North Griffin Street 32938 Tamina Rd, 7171 Highway 6 North 511 University Drive East, 16000 Memorial Drive 16000 Memorial Drive 5151 San Felipe Houston, TX 77054 Dallas, TX 75202 Suite 101 Suite 201 Suite 204 Suite 100 Suite 100 Suite 2050 Voice- (713) 952-6400 Voice. (214) 871-0083 Magnolia, TX 77354 Houston, TX 77095 College Station, TX 77840 Houston, TX 77079 Houston, TX 77079 Houston, TX 77056 Fax- (713) 952-6440 Fax- (214) 871-0545 Voice, (281) 440-7211 Voice. (281) 583-7088 Voice. (979) 260-6963 Voice. (281) 558-8787 Voice. (281) 558-8787 Voice. (713) 268-5135 Fax- (281) 766-1997 Fax- (281) 583-5495 Fax- (979) 260-3564 Fax- (281) 558-3337 Fax- (281) 558-3337 Fax- (713) 268-5111 e-mail: houston@meeksportners.com TDLR #: EABPRJA8802818 NOT FOR CONSTRUCTION ISSUED FOR PRICING ISSUED FOR PERMIT X I ISSUED FOR CONSTRUCTION DATE REVISION 7.11.07 FIRE MARSHALL REVIEW 7.16.07 SCHEMATIC DESIGN ISSUE 7.17.07 FIRE MARSHALL REVISIONS 8.15.07 DESIGN DEVELOPMENT ISSUE 11.20.07 APARTMENT PERMIT ISSUE 05.28.08 APARTMENT PERMIT RE -SUBMITTAL D 06.18.08 APARTMENT PERMIT RE -SUBMITTAL 07.23.08 APARTMENT CONSTRUCTION ISSUE 1 08.05.08 GENERAL COORDINATION REVISIONS 2 08.19.08 GENERAL REVISIONS 3 09.03.08 WINDOW & DOOR COORDINATION 4 09.19.08 INTERIOR STAIR REVISIONS 5 10.27.08 COLUMN GRID & CLUB CLGS. 6 11.10.08 GENERAL REVISIONS 7 01.26.09 BLDG. #3 ATTIC ACCESS REVISION a* ... LU ~u� W zaU�- o -�--a z W g co a W d Lo W - S W W zW� U a�umi, DRAWING NO. A1.00 IRE Ali � .. . ....... ............ .. . .. .. ... .... . . .. .. . .. .. .. .... .. ... ... .. .. .. .. .. .. .. .. ............. .. . ...... tK -.4 .......... rt, 00 LINE OF MECH. tK SHAFT ABOVE 7 ---- -- ------ S37 _4 ------- --- --- 13' o -1 f2 1' 10, 10"8 —0 3-4 1/2 Lo --- -- -- ---- -- ------ ...... 04 X R ETAI L -- --- --- -- -ji.-I 3FEx ----------- --- ------- i j� 4't.- . ........ ...... N ... .. ... .. .. ........ ...... (5 00 5 ...... ...... ....... ........ . .. ...... ... ... ... .. METER S: F01 I X". ........ ... . .. . . .. ........... j. SEf�VE bi _DG. # I�F DIGS 'If _0 4ri 4 _0 ............ ...... .... ..... .. .. . .. ...... 767 ---------------------------- / _ ii_ _�_ �4— - ---------- 17=7 ..... .. . .. . .. . .. ..... r. -1 . ........... . .................. .. .. .. .. .. ... 1V ...... .... . .. ... .............. .. .. .. .. F G -------- - ----- --------------- -------------- ------------- -------- — ---- - - JJI 33"2.9 ---------- ------------- lo'-8 1/2" 4" A.S. 15' —2* - - ------------- --------____ - ... - ------- 15'��21 I I l�--6-0-i lh5l 1/2' ELECTRICAL METERS TO SERVE BLDG. # 3 (RE: MEP DWGS) > SELF —CLOSING KINGES PRO ID Y --..MANLTVERING CLEARANCES AT PUSH SI E TYP. (RE: 9/A'l I) E 0 CANOPY 2� COURTYARD K; �-, ---------- F4 (RE: LAND. DWGS.) ----------------- 1 /41) 1) 0 c c' IN X, KEYMAP d JOB NO.: 06043 FILE NAME: 6043A323 0 NOT FOR CONSTRUCTION ISSUED FOR PRICING 0 ISSUED FOR PERMIT Lx I ISSUED FOR CONSTRUCTIONJ� DRAWING NO. 10 0 A3.231 ` LEGEND: cl, 5, [If mo I . D V) V) ':'Dm ------ Ll -- ---------- '7 ------- ------ -- --------------- ------- ---- ------------- --- — ------- 17f -------- It I : .. .......... . .. ..... . .. ... --.1 1 . ............ . --1 STAIR #4 --o KEYMAP d 2 HR. FIRE WALL A.S. AIRSPACE Al B BOLLARD 8342 c� OE. B. D. BALCONY DRAIN COL. STEEL COLUMN, SEE STRUCT. FOR SIZE, (PROVIDE 2x6 WALL U.N.O.) D. D. DECK DRAIN E.J. EXPANSION JOINT F. D. FLOOR DRAIN F.O.C. FACE OF CONCRETE F.O. M. FACE OF MASONRY F.O.S. FACE OF STUD T. S. TENANT STORAGE Ld FIRE EXTINGUISHER FEx (SEMI RECESSED) FIRE EXTINGUISHER FEx (WALL MOUNTED) WALL TYPE — SEE SHT A6.00 FOR LIST _j < D 0 cn cn uj cn 8" NOM., CMU BLOCK m Z 5; Lj ui > WALL D D Ln 0 Of _j V) FURR—DOWN TO 9'-0" cn V) uj C) 0 F-- < cn Z) u) C) —J FURR—DOWN TO 8'-0" of Li m [if bi z 0 0 (if 0 C) 0 0 < 0 SPRINKLER SYSTEM 0 z LLJ 2 z Ld 2 z Ld 2 1— _j < u Z ro �4k S.P. STAND PIPE Fn Ly cr- ct� O� Li jj . CD > W < 0- < 0- < a- z Li 0 BLDG. NO. < < <u I u 00 \\\ 00 CD 00 co CD cn 0 BLDG. #x < c=) oo C'4 to cq L0 CD r- - co 0 Lo r- Go 4v Ln Ln in co + co 00 E Go Ln Lm c JE T C) 4 00 O 0 m ti w f JOB NO.: 06043 FILE NAME:6043A324 NOT FOR CONSTRUCTION ISSUED FOR PRICING ISSUED FOR PERMIT ISSUED FOR CONSTRUCTION 0 DRAWING NO. A3.24 Lofts @ Wolf Pen Creek - 1119 Drawing Contents Scale Rev. Delta/Date ti /REVISIONS 9\8,01,08 ADDED RETAIL GAS u u M-1.1 Mechanical Site Plan M-1.2 Mechanical Specifications & Details M-2 Mechanical Plans - Units Al, AlA,B,C,D,E,F, A2, A2A M-3 Mechanical Plans - Units Bl, B1A,B,C,D,E,F, B2, B2A, B3, B3A,B,C, B3-HC M-4 Mechanical Plans - Units B5, B5A, B7, B4 ' M-5 Mechanical Plans - Units B6, B6A,B,C,D, Cl, Cl-HC M-6 Mechanical Plans - Units D1, Dl-HC, D2-1, D2-Al, D2-2, D2-A2 M-7 Mechanical Plans — Building Roof Layout M-8 Mechanical Plans - Building Roof Layout CM-1.1 Mechanical Plans - Clubhouse First Level CM-1.2 Mechanical Plans - Clubhouse First Level CM-2.1 Mechanical Plans - Clubhouse Second Level CM-2.2 Mechanical Plans - Clubhouse Second Level E-1.1 Electrical Site Plan E-1.2 Electrical Specifications & Details E-2 Electrical Plans - Units Al, AlA,B,C,D,E,F, A2, A2A E-3 Electrical Plans - Units B1, B1A,B,C,D,E,F, B2, B2A, B3, B3A,B,C, B3-HC E-4 Electrical Plans - Units B5, B5A, B7, B4 E-5 Electrical Plans - Units B6, B6A,B,C,D, Cl, Cl-HC E-6 Electrical Plans - Units D1, D1-HC, D2-1, D2-Al, D2-2, D2-A2 E-7 Electrical Plans - Building #1 1st Level E-8 Electrical Plans - Building #1 2nd, 3rd, & 4th Levels E-9 Electrical Plans - Building #2 1st, 2nd, & 4th Levels E-10 Electrical Plans - Building #3 Section 1-1st & 2nd Levels E-11 Electrical Plans - Building #3 Section 1-3rd, 4th, & 5th Levels E-12 Electrical Plans - Building #3 Section 2-1st & 2nd Levels E-13 Electrical Plans - Building #3 Section 2-3rd, 4th, & 5th Levels E-14 Electrical Plans - Building #4 1st, 2nd & 4th Levels E-15 Electrical Plans - Building #5 1st, 2nd & 4th Levels E-16 Electrical Plans - Building #6 1st Level E-17 Electrical Plans - Building #6 2nd & 4th Level E-18 Electrical Plans - Building #7 1st, 2nd, & 4th Levels E-19 Electrical Plans - Building #8 1st & 2nd Levels E-20 Electrical Plans - Building #9 1st & 2nd Levels E-21 Electrical Plans - Building Roof Layout E-22 Electrical Plans - Building Roof Layout E-23 Electrical Plans - Load Calculations & One Line Diagrams E-24 Electrical Plans - Load Calculations & One Line Diagrams E-25 Electrical Plans - Load Calculations & One Line Diagrams E-26 Electrical Plans - Load Calculations & One Line Diagrams CE-1.1 Electrical Plans - Clubhouse First Level CE-1.2 Electrical Plans - Clubhouse First Level CE-2.1 Electrical Plans - Clubhouse Second Level CE-2.2 Electrical Plans - Clubhouse Second Level CE-3 Electrical Calcs - Clubhouse P-1.1 Plumbing Site Plan P-1.2 Plumbing Specifications & Details P-2 Plumbing Plans - Units Al, AlA,B,C,D,E,F, A2, A2A P-3 Plumbing Plans - Units B1, BlA,B,C,D,E,F, B2, B2A, B3, B3A,B,C, B3-HC P-4 Plumbing Plans - Units B5, B5A, B7, B4 P-5 Plumbing Plans - Units B6, B6A,B,C,D, Cl, Cl-HC P-6 Plumbing Plans - Units D1, Dl-HC, D2-1, D2-Al, D2-2, D2-A2 P-7 Plumbing Plans - Building #1 1st Level - Sanitary Sewer P-8 Plumbing Plans - Building #1 2nd, 3rd, & 4th Levels - Domestic Water P-9 Plumbing Plans - Building #2 1st, 2nd, & 4th Levels - Sewer/Water P-10.1 Plumbing Plans - Building #3 Section 1-1st & 2nd Levels - Sanitary Sewer P-10.2 Plumbing Plans - Building #3 Section 1-1st & 2nd Levels - Domestic Water P-11.1 Plumbing Plans - Building #3 Section 1-3rd, 4th, & 5th Levels - Sanitary Sewer P-11.2 Plumbing Plans - Building #3 Section 1-3rd, 4th, & 5th Levels - Domestic Water P-12.1 Plumbing Plans - Building #3 Section 2-1st & 2nd Levels - Sanitary Sewer P-12.2 Plumbing Plans - Building #3 Section 2-1st & 2nd Levels - Domestic Water P-13.1 Plumbing Plans - Building #3 Section 2-3rd, 4th, & 5th Levels - Sanitary Sewer P-13.2 Plumbing Plans - Building #3 Section 2-3rd, 4th, & 5th Levels - Domestic Water P-14 Plumbing Plans - Building #4 1st, 2nd & 4th Levels - Sanitary Sewer P-15 Plumbing Plans - Building #5 1st, 2nd & 4th Levels - Sanitary S P-16 Plumbing Plans - Building #6 1st Level - Sanitary Sewer P-17.1 Plumbing Plans - Building #6 2nd & 4th Level - Sanitary Sewer P-17.2 Plumbing Plans - Building #6 2nd & 4th Level - Domestic Water P-18 Plumbing Plans - Building #7 1st, 2nd, & 4th Levels - Sanitary P-19.1 Plumbing Plans - Building #8 1st & 2nd Levels - Sanitary Sewer P-19.2 Plumbing Plans - Building #8 1st & 2nd Levels - Domestic Water P-20.1 Plumbing Plans - Building #9 1st & 2nd Levels - Sanitary Sewer P-20.2 Plumbing Plans - Building #9 lst & 2nd Levels - Domestic Water P-21 Plumbing Plans - Building Roof Layout P-22 Plumbing Plans - Building Roof Layout P-23 Plumbing Plans - Riser diagrams P-24 Plumbing Plans - Riser diagrams P-25 Plumbing Plans - Riser diagrams P-26 Plumbing Plans - Riser diagrams P-27 Plumbing Plans - Riser diagrams P-28 Plumbing Plans - Riser diagrams P-29 Plumbing Plans - Riser diagrams P-30 Plumbing Plans - Riser diagrams CP-1.1 Plumbing Plans - Clubhouse First Level CP-1.2 Plumbing Plans - Clubhouse First Level CP-2.1 Plumbing Plans - Clubhouse Second Level CP-2.2 Plumbing Plans - Clubhouse Second Level GE-1 Electrical Plans - Garage - First Level GE-2 Electrical Plans - Garage - Second Thru Fifth Levels, Sixth Level GE-3 Electrical Plans - Garage - Seventh Level GE-4 Electrical Plans - Garage - Calculations GP-1 Plumbing Plans - Garage - First Level GP-2 Plumbing Plans - Garage - Second Thru Fifth Levels, Sixth Level GP-3 Plumbing Plans - Garage - Seventh Level Created date: 11.20.07 CZ Updated date 08.14.08 JH Original permit date for plans: 1"=50' NTS 1/4" 1/4" 1/4" 1/4" 1/4" 1"-20' 1"-20' 3/16" 3/16" 3/16" 3/16" 1"=50' NTS 1/4" 1/4" 1/4" 1/4" 1/4" 1/8" 1/8" 1/$ 1/8" 1/8" 1/8" 1/8" 1/8" 1"=20' 1"=20' NTS NTS NTS NTS 3/16" 3/16" 3/16" 3/16" NTS 1"=50' 1/4" 1/4" 1/4" 1/4" 1/4" 1 / 4 " 1/8" 1/8" 1/8" 1/8" 1/8" 1/8" 1/8" 1/8" 1/8" 1"=20' 1"=20' NTS NTS NTS NTS NTS NTS NTS NTS 3/16" 3/16" 3/16" 3/16" 3/32" 3/32" 3/32" 3/32" 3/32" 3/32" 3/32" FOUNDATION PERMIT ONLY ALL DWV MATERIALS SHALL BE SCHEDULE 40 PVC ALL CONCEALED DOMESTIC WATER PIPE SHALL BE CPVC (FLOW GUARD GOLD) INSTALLED PER MFG'S SPECS. ALL STORM PIPING SHALL BE SCHEDULE 40 PVC UNDERGROUND WATER PIPING SHALL BE TYPE "L" COPPER ALL XFMRS 120/208V 3 PH, 4W U.N.O. TRANSFORMER LOCATIONS PENDING PWR CO. APPROVAL CITY OF COLLEGE STATION, TX ENFORCED CODES: 2006 IBC; 2006 IRC; 2006 IMC; 2006 IPC; 2006 IFC; 2006 IFGC; 2005 NEC; 2006 IECC; 2003 NFPA 101 LIFE SAFETY CODE; ALL WITH CITY AMENDMENTS. SITE PLAN 1" = 50'-0" SITE PLAN FOR REFERENCE ONLY SEE 1/8" DWGS FOR SANITARY SEWER AND DOMESTIC WATER LAYOUTS SEE CIVIL DWGS FOR SITE UTILITIES W w� w � U 0 z W co N � F- 10,06.08 REV PER RFI#056 3.5.09 REV GAS goof:. .... ,.4. 46000.04.6.:.0.0� .f.f.•»LI•.•F.+ADEOKUN•ff1 ,S 67062 11>>; 0NAtENG.r• `j (V r � rn_ —�+ I I t ^^ E o 00 0 V W w U LL. c 2. LL �. c w c 0 W V s. V) L0 M o m c= a z >g J J < Co U I W Z w a W z W F-- LL ., j z 0 0 a W F_ W W J J 0 rr^^ VJ F_ 0 ..f j W F_ U_��H U U w v DATE � z � w w a o- 9 a y 05,09,08 REV,FOUND,IFP Z. i w cc 05,30.08 IFP c CO Q� ® O o LU WO v M _J M 0Cn a a a > U > 09.23,08 CONST, ISSUE 2 CONTROL SEQUENCE JC JC JC JC JC JC - GK - 1119-LOFTS AT WOLF CREEK ASSET PLUS-MEEKS + PARTNERS