Loading...
HomeMy WebLinkAboutSP2025-000013 Sanitary Sewer Design Letter Office: 979.764.3900 Fax: 979.764.3910 911 Southwest Parkway E • College Station, Texas 77840 schultzeng.com January 28, 2024 Carol Cotter, P.E. Interim City Engineer Development Services City of College Station College Station, Texas RE: SANITARY SEWER DESIGN BRAZOS VALLEY ENDODONTIC ASSOCIATES (CENTURY HILL DEVELOPMENT, LOT 11R), COLLEGE STATION, TX Mrs. Cotter: Accompanying this letter are the construction plans for Brazos Valley Endodontic Associates (Century Hill Development, Lot 11R). The proposed dental office development connects to a proposed 6” sewer service which will discharge into an existing manhole along Corsair Drive in College Station, Texas. The existing manhole connection is located on the southwest side of the subject property. This project will connect to the existing 8” sewer line constructed along Corsair Drive. The existing sewer line was designed for full buildout and development along Corsair Drive. Based on the Century Hill Subdivision Sewer Report the estimated peak hourly flow is 173 gpm. This development is a dental office and anticipates a sewer discharge of 26 gpm peak flow into the existing system. The proposed flow is less than the assumed flow. As a result, a separate sanitary sewer report is not being submitted with this project. If you have questions regarding the sanitary sewer system, please feel free to contact me at your convenience. Sincerely, __________________________________ Deven Doyen, P.E. Civil Engineer 1/28/2025