HomeMy WebLinkAboutSP2025-000013 Sanitary Sewer Design Letter
Office: 979.764.3900
Fax: 979.764.3910
911 Southwest Parkway E • College Station, Texas 77840
schultzeng.com
January 28, 2024
Carol Cotter, P.E.
Interim City Engineer
Development Services
City of College Station
College Station, Texas
RE: SANITARY SEWER DESIGN
BRAZOS VALLEY ENDODONTIC ASSOCIATES
(CENTURY HILL DEVELOPMENT, LOT 11R), COLLEGE STATION, TX
Mrs. Cotter:
Accompanying this letter are the construction plans for Brazos Valley Endodontic Associates (Century Hill
Development, Lot 11R). The proposed dental office development connects to a proposed 6” sewer service
which will discharge into an existing manhole along Corsair Drive in College Station, Texas. The existing
manhole connection is located on the southwest side of the subject property.
This project will connect to the existing 8” sewer line constructed along Corsair Drive. The existing sewer
line was designed for full buildout and development along Corsair Drive. Based on the Century Hill
Subdivision Sewer Report the estimated peak hourly flow is 173 gpm. This development is a dental office
and anticipates a sewer discharge of 26 gpm peak flow into the existing system. The proposed flow is less
than the assumed flow. As a result, a separate sanitary sewer report is not being submitted with this project.
If you have questions regarding the sanitary sewer system, please feel free to contact me at your
convenience.
Sincerely,
__________________________________
Deven Doyen, P.E.
Civil Engineer
1/28/2025