Loading...
HomeMy WebLinkAboutSP2025-000013 Development Permit (07.18.2025)__________________________________________________ Carol L. Cotter, P.E., City Engineer DEVELOPMENT PERMIT PERMIT NO. SP2025-000013 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: CENTURY HILL DEVELOPMENT, LOT 11R, ACRES 2.017 SITE ADDRESS: 3109 CORSAIR DR DATE ISSUED: DRAINAGE BASIN: Bee Creek Tributary A OWNER: EILERS HOLDINGS LLC 8818 QUEENS CT COLLEGE STATION, TX 778456368 EXPIRES: July 3, 2027 VALID 24 MONTHS FROM APPROVAL TYPE OF DEVELOPMENT: Full Development Permit I, KEYS & WALSH CONSTRUCTION, L.P., the Contractor, hereby agree to comply with all conditions attached herein. Phone Number: (979) 774-3600 E-mail: kenn@keysandwalsh.com Date PROJECT NAME: BRAZOS VALLEY ENDODONTIC ASSOCIATES SPECIAL CONDITIONS: Please have electrical contractor reach out to myself to coordinate a meeting ideally 2 weeks before electrical construction begins. **IMPORTANT** CSU is still in the process of determining the capacity on the existing transformer that is designated to feed this development. If this transformer will be overloaded due to this added load, the transformer will be up-sized by CSU at the developer's expense (via a CIAC fee). Reach out with any questions: Taylor Threat - tthreat@cstx.gov 979-764-5045 DATE APPROVED:July 3, 2025 __________________________________________________ Contractor Signature ________________________________ Date __________________________________________________ On-Site Contact ________________________________ On-Site Contact Phone Number ALL conditions must be met on the following page. Israel Koite (979) 777-6871 ikoite@cstx.gov Contact the City Engineering Inspector assigned to this project 24 hours prior to beginning construction for scheduling required inspections (see contact information below). 7/17/2025 Cole Kitchel 979-774-3600 CONDITIONS: 1.No work beyond limits covered in permit is authorized. 2.The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-issued. 3.The permit will expire if no significant work is progressing within 24 months of approval. 4.Other permits may have been required ot fulfill local, state and federal requirements. Construction will be in compliance with all essary State and Federal Permits. 5.Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6.In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to ensure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Preventation Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7.All disturbed areas will be re-vegetated prior to the Letter of Completion or Certificate of Occupancy. 8.All tree required to be protected as part of the landscape plan, must be completely barricaded in accordance with the Landscaping and Tree Protection section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and requried to remain, is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9.All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations requested and approved will be allowed. 10.Separate permits and inspections are needed for items such as: all private utilities on site, signs, retaining walls, etc., and are therefore not included under this Development Permit. NOTE: The Contractor shall provide the Engineering Inspector a 24"x36" full set of City-approved construction plans prior to start of construction. The Contractor shall acquire approval from the City of College Station Engineering Inspector prior to any construction deviating from the City-approved construction plans. The Contractor shall also maintain a full set of approved construction plans onsite that are periodically redlined to include any modifications that occur with the actual construction. The Contractor shall keep a 24"x36" full set of City-approved construction plans, as well as the issued Development Permit (including TxDOT permits, if applicable), onsite and available during any construction activity. Please contact the Planning & Development Services Engineer GILLIAN SITLER at (979) 764-5007 to schedule a Preconstruction meeting. ALL conditions must be met on the following page. Israel Koite (979) 777-6871 ikoite@cstx.gov Contact the City Engineering Inspector assigned to this project 24 hours prior to beginning construction for scheduling required inspections (see contact information below).