Loading...
HomeMy WebLinkAboutSP2024-000138 Utility Demand Letter Office: 979.764.3900 Fax: 979.764.3910 911 Southwest Parkway E • College Station, Texas 77840 schultzeng.com January 31, 2025 Carol Cotter, P.E. City Engineer Development Services City of College Station College Station, Texas Re: Aggieland Pregnancy Outreach – Utility Demand Dear Mrs. Cotter: Based on the proposed architectural drawings for the building, fixture units are being decreased from existing conditions. Therefore, no additional demand is being added to water or sanitary sewer systems. Fixture Unit Counts – Existing Building Water Closet 9 Lavatories 12 Kitchen Sink 3 Utility Sink - Shower 4 Total 28 The above proposed fixture units are preliminary, final fixture units will be equal to or less than existing fixture units. If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. _____________________________ Deven Doyen, P.E. Civil Engineer Fixture Unit Counts – Proposed Building Water Closet 9 Lavatories 9 Kitchen Sink 2 Utility Sink 1 Shower 4 Total 25 01/31/2025 D DD7