HomeMy WebLinkAboutSP2024-000138 Utility Demand Letter
Office: 979.764.3900
Fax: 979.764.3910
911 Southwest Parkway E • College Station, Texas 77840
schultzeng.com
January 31, 2025
Carol Cotter, P.E.
City Engineer
Development Services
City of College Station
College Station, Texas
Re: Aggieland Pregnancy Outreach – Utility Demand
Dear Mrs. Cotter:
Based on the proposed architectural drawings for the building, fixture units are being decreased
from existing conditions. Therefore, no additional demand is being added to water or sanitary
sewer systems.
Fixture Unit Counts – Existing Building
Water Closet 9
Lavatories 12
Kitchen Sink 3
Utility Sink -
Shower 4
Total 28
The above proposed fixture units are preliminary, final fixture units will be equal to or less than
existing fixture units.
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
_____________________________
Deven Doyen, P.E.
Civil Engineer
Fixture Unit Counts – Proposed Building
Water Closet 9
Lavatories 9
Kitchen Sink 2
Utility Sink 1
Shower 4
Total 25
01/31/2025
D DD7