Loading...
HomeMy WebLinkAboutCost Estimate • Falcon Point Water Line — Engineer's Opinion of Probable Construction Cost 5/4/2012 MBESI NO. 1000 -0208 Item Estimated Estimated Total No. Description Estimated Quantity Unit Cost Cost 1.00 WATER LINE IMPROVEMENTS 1.01 8" AWWA C900, DR 14 (includes installation, testing, and clean- 756 LF $30.00 $22,680.00 up) 1.02 8 "x45 deg Bend 6 EA $250.00 $1,500.00 1.03 2" Blow -off 1 EA $1,000.00 $1,000.00 1.04 Connect to Existing Line 1 EA $500.00 $500.00 1.05 Remove Existing Blow -Off 1 EA $250.00 $250.00 Subtotal Item 1.00: $25,930.00 TOTAL CONSTRUCTION COST: $25,930.00 The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project co between now and the bid date. During design and construction, additional features may become apparent as the ork progress h will result in an increase or decrease in cost. 4 Prepared by: IIK/r 1- Je `rY L ' ertson, P.E. ■rir lur- rowne Engineering/Surveying, Inc. I t � • -F • _BY i_. RTSOt' e 94740 '