Loading...
HomeMy WebLinkAboutPAC Info.I \\ CONCEPTUAL SITE PLAN NOTES: RAw • I I ®� 1. THIS CONCEPTUAL STE PLAN IS NOT BASED OFF OF AN ACTUAL ON- THE - GROUND SURVEY, BUT COCS TOPOGRPAHICAL AND MINIMUAL MEASUREMENTS TAKEN IN THE FIELD. METCALF NOW OR MAPS (AERIAL 1994) ENGINEERING FUNIENLY SALLIE SMITH / 2. PROPOSED IMPROVEMENTS DO NOT FULLY COMPLY MITI THE UDO, BUT ARE BASED ON THE LAND PLAN, PREPARED (VOLUME PACE 320. OJD) ®� BY CARSON PLANNERS, AND ACCEPTED BY TKDOT. 4 .0 ACRE 4.0 TRACT ZONED A J. THE PARKING SCENERI05 FOR THIS DEVELOPMENT ARE AS FOLLOWS: COLLEGE TA S�710N, 9 TEXAS 77842 ETMAD.: TmwBow�vaimP.Pet I I ® 90D 4® 1PER 65 SO FT. (4,335 SOFT. / 65) - 67 SPACES (w/2 BEING H/C ACCESSIBLE) EASTING OFPJCE •(979)690.0329 FAX - (979)690-0329 S 47' 03_ 25' E 25 0.46' Il " : x R SPACES 2 N SPACE cTOJ - (979)u — — — — — — — — TOTAL - 58 SPACES II I PR 28G SPACES ' 1 30 NEW - RELOCATED SPACES TOTAL - 58 SPACES I I 4. AN IRRIGATION SYSTEM WILL BE INSTALLED FOR THE NORTHMOST PARKING AREA AND NEW LANDSCAPING PLANTED ALONG WEST PROPERTY LINE COMMON KITH THE R.O.W. LINE OF WELLBORN ROAD. 5. STREETSCAPE FOR WELLBORN ROAD OR SALVE LANE WILL BE IMPOSSIBLE TO OBTAIN. MINIMUM LANDSCAPING WILL IS' INGE NOw OR FDIENLY BE INSTALLED ALONG THE PROPERTY FRONTAGE. ACCESS EASEMENT I (VOUR3E PACE 112) I 6. PER THE CARSON PLANNERS REPORT, NO ZONING OR PLATTING IS ANTICIPATED. 1.891 ACRE TRACT ZONED A -0 I I ' I EW STORAGE R:,G` PENA CONCEPTUAL BUILDING ( VGLMNE sere. PAGE Zee) 3.12 ACRE TRACT A -G DRAWING ONLY 1� 1 NOT FOR CONSTRUCTION � .STING 3111105 I II – ,e — SEP TIC FIELD ' II I , ' rn PRELIMINARY THI POSE IS OF RE eI 1 r STOMA. T,11115110 9N0 NEW CONCRETE TO RELOCATED DUMPSTER PAD w/SCREENINC k GATES r— 7 ) 1 .16 OF I RABON A. METCALF AU P.E. NO. 88583, ON MARCH 11, OE I I 14. I FOR CONSTRUCTION, BIDDING NOW FouFRLV I m OR PERMIT PURPOSES. EDSEL G JONES r O 13 (VOLUME JOOJ. PAGE 238) 77.414 ACRE TRACT V •••••••••• -� 2CINE0 R -1 I I� a EMSTING I FENCE - 1 KOPPE BRIDGE Rd0 -- i RESTAURANT I Z �--- (1- STORY) _�! J (4,335 SOUARE -FEET) �— ManwG ROCK ASS P ARE ORIVE TO NN e w Q �[ 3t { ( ry j a NEW PAVEMENT EDGE - NO CURB k CUTTER i p Z I �- WNW NEW H.M.A.0 PAVEMENT w/ CURB dl I OO I RAMP F W CU f O r rn C4 NEW PAVEMENT EDGE NEW H,MA.C. I E)O511NC ROCK _ NO CURB 8 CUTTER I IL I I - --- --- ----- 1 - - - - -- --------- - - --.� - - -- O _ i I S 4T 03' 10' E 260.39' I J I r _ I I R.O.W. I LINE I I I ( ( I 1 REMOVE ERSTI B ASE / MATERS REPLACE KOPPE BRIDGE RESTAURANT G/0 DELPHI ROSS I I / I I P.O. BOX 8 005 SW I I I F: 9 9) 75 2933 FAX: (979) 846 -9225 FB,ENMIE.0240OPIA I SCALI* -20' 15WM DATE. MARCH ,1, ZOO \ DRAWN BT: RAM. CHECHIM !'I: RAM. M0 eORi N A I PAGES: N/A RABON METCALF ENGINEERING NEW DRIVEWAY LOCATION w /JDINT FM 2154 ^F WELLBORN ROAD CLIENT NO. PROJECT NO. ACCESS EASEMENT 156 — 0240 cpml SWEET Na 1 OF 1 \ CONCEPTUAL SITE PLAN NOTES: R ABON e \ ®// 1. THIS CONCEPTUAL SITE PLAN IS NOT BASED OFF OF AN ACTUAL ON- THE - GROUND SURVEY, BUT CoCS METCALF V�9 TOPOGRPAHICAL NAPS (AERIAL 1994) AND MINIMUAL MEASUREMENTS TAKEN IN THE FIELD. ENGINEERING Nor a rONekr �- 2. PROPOSED IMPROVEMENTS 00 NOT FULLY COMPLY WITH THE UDO, BUT ARE BASED ON THE LAND PLAN, PREPARED SALLIE SMITH (I�� 134, 100. PAGE 326, 539) -. - - -� CD� •� BY CARSON PLANNERS, AND ACCEPTED BY T>tDOT. FO LLEOE OFF ICE BOX 9253 ACRE ,RACY COLIJ?(ff STATION, TEXAS 77842 a.0 ACA A-0 3. THE PING SCENER105 FOR THIS DEVELOPMENT ARE AS FOLLOWS: EMAIL: 1ma:Loeaa�vw+mn.net i SPACE PER 65 SOFT. OFFICE- (979)698 -0329 (4,335 SOFT. / 65) - 67 SPACES (w/2 BEING H/C ACCESSIBLE) FAX- (979)690 -0329 ® I CELL - (979)219 -4174 25 E 26 0.46 - - EXISTIN SPACES S 47' 03_ ' — ' u^ - sm 2 H/C SPACE � � � - - � � � TOTAL - SB SPACES N EXISTING SPACES ( I 30 NEW - RELOCATED SPACES TOTAL - 58 SPACES I I I I 4. AN IRRIGATION SYSTEM WILL BE INSTALLED FOR THE NORT14MOST PARKING AREA AND NEW LANDSCAPING PLANTED I I 1 I ALONG WEST PROPERTY LINE COMMON PATH THE R.O.W. LINE OF WELLBORN ROAD. 5. STREETSCAPE FOR WELLBORN ROAD OR SALLIE LANE WILL BE IMPOSSIBLE TO OBTAIN. MINIMUM LANDSCAPING WILL NOW OR FOIEALY I BE INSTALLED ALONG THE PROPERTY FRONTAGE. PR DELPH ROSS S. PER THE CARSON PLANNERS REPORT, NO ZONING OR PLATTING IS ANTICIPATED. fe' woe ACCESS E PRIVATE I I (VOLWe 2399, PACE 112) 1.991 ACRE TRACT I ZONM A -0 NOW OR MUM Y I I I I I I RICHARD PENA .N EW STORAGE (YGLUME 6936. PAGE 266) CONCEPTUAL I I I BUILDING 6.12 M TRACT DRAWING ONLY za4eD A —O ` NOT FOR CONSTRUCTION _ 3111105 II is I �9_l ' � IQSTIN G SEPTIC REW i H (( � PRELIMINARY I I I -- -' • THIS DOCUMENT IS RELEASED OF INTERIM FTHE 1 I N B E REVIEW UNDER AUTHORITY J ' rSSNO STORAGE I i OF RADON A. NE MARC P.E. A I ' 61AlDMD NEW CONCRETE NO 2005 IT S NOT TO BE USED ro BE DUMPSTER PAD — — r 1 I w/SCREENINC k GATES I I Ipp FOR O PERM T CPURPOSES BIDD ING RELOCATED VI I {TI Nor eR FoMFWty O 4JR EDSEL G ,ZONES 6 (VOLUME 300.1. PACE 236) V I :•• • ••: ^ ^ 77. ACRE TRACT Z ZONED R -I C� I KOPPE BRIDGE FM GE ro K -J- RESTAURANT I mo` - I Q e RENO II (I-STORY) I i I a JJ (4,335 SW ARE -FEET) al DMK TO P MN �.. OS y NEW PAVEMENT EDGE r - NO CURB k GUTTER W ci I r o V! NEW H.M.A.0 PAVEMENT I I �� I w /CONCRETE CURB & I all RAMP O I ® I C N $ CUTTER t`__ -' ` J m N r r EW N H.MA.C. I EXISTING ROC PAVEMENT EDGE Wy I CURB d< WTTER CL ---------- - - -.�` — — - -- _ — — S 4T 03' 10 E — a.oD' / I / UK R.O.W. II / I + KAppE BRIDGE RESTAURANT C/o DELPH ROSS I I I MATMAALL a�LA I P.O. 8 8003 I I I FAX: (979) 6469 933 226 OFF: 979) 764 -2 FLENM8:0240CPIA SCAU :1 -29 \ - \ 16RRD DAL• MARCH II, 2003 01 Irf. HAM. atCK0 ft. RAM. MD RADON N METCALF ENGINEERING CLIENT NO. PROJECT NO. NEW DRIVEWAY FM 2154 N WELLBORN ROAD 156 - 0240 LOCATION w /JOINT ACCESS EASEMENT P -1 JHW N0. 1 OF 1 \\ CONCEPTUAL SITE PLAN NOTES: RABON • ® 1. THIS CONCEPTUAL SITE PLAN IS NOT BASED OFF OF AN ACTUAL ON– THE – GROUND SURVEY, BUT COCS d METCALF IN THE FIELD. TOPOGRPAWCAL MAPS (AERIAL 1994) AND MINIMUAL MEASUREMENTS TAKE ENGINEERING SALLIE SMITH / THE 2. PROPOSED IMPROVEMENTS DO NOT FULLY COMPLY PATH THE LIDO, BUT ARE BASED ON E L D PL PREPARED (VOLUME ISM, 160, PACE 320. 5N) / ®� BY CARSON PLANNERS, AND ACCEPTED BY T ■DOT. POET OFFICE BOX 9313 AO ACRE TRACT ZONED A-0 J. THE PARKING $CENERIOS FOR THIS DEVELOPMENT ARE AS FOLLOWS: REOUIREI)i C M STATI ON, � TEXA S 77842 EMAIL: I I SPACE PER 65 SOFT. (4,335 SOFT. / 65) - 67 SPACES (r /2 BEING H/C ACCESSIBLE) O PWCE - (979)690.0339 m EXISTING FAX - (979)690-0339 I J S 4 0 3_ 25 E — 26 0.46' 11" . 5Q7 Se REGULAR 'SPACES 2 SPACE CL -(979) 319.1174 — — — — — — — — TO TAL r 58 SPACES I T I 28 EXISNG SPACES I I 30 NEW-RELOCATED SPACES I 1 I TOTAL - 58 SPACES I I 4. AN IRRIGATION SYSTEM WILL BE INSTALLED FOR THE NORTHMOST PARKING AREA AND NEW LANDSCAPING PLANTED I I I ALONG WEST PROPERTY LINE COMMON WITH THE R.O.W. LINE OF WELLBORN ROAD. S. STREETSCAPE FOR WELLBORN ROAD OR SALVE LANE WILL BE IMPOSSIBLE TO OBTAIN. MINIMUM LANDSCAPING WILL xor OCR caRAFTav I BE INSTALLED ALONG THE PROPERTY FRONTAGE. Is' WOE VATE ACCESS EASEMENT I DELPH ROSS (VOLUME 356% PACE 112) I S. PER THE CARSON PLANNERS REPORT, NO ZONING OR PLATTING IS ANTICIPATED. I 1.59, ACRE TRACT ZONED A —C I II I 1 I EW STORAGE I NOr DR FDMERLY RICHARD PAGE CONCEPTUAL (VOL 3.13 ACRE MALT I ( cWX - 51 VIED ACRE PAGE 266) BUILDING I ZONED DRAWING ONLY ' NOT FOR CON � - STING 3/11/05 I SEP11C 15 1 FIELD i H II I PRELIMINARY N II �� I B S TE C PU I 1 FOR H POSE OF INTERIM REVIEW UNDER THE AUTHORITY 4 1 BUEDN4Q STORAGE NEW CONCRETE OF RADON A. METCALF, P.E. I ro BE RELOCATE DUMPSTER PAD r— 1 NO. 66563, ON MARCH 11, r GREENING d< GAT E$ I 2005. IT IS NOT TO BE USED FOR CONSTRUCTION, BIDDING NOW OR FQMFRLY EDSEL G JONES V i {TI 1 � -- — •'_ r O –� - -L — —. •.-- I 1J sp OR PERMIT PURPOSES. (VOLUME 3001 PACE 259) VI 1 ... —• 77.464 ACRE TRACT ml ZONED R -1 1 p) I I KOPPE BRIDGE ERSTN BOARD ° '"` � 1 -�- RESTAURANT I I I I j F 11 (4,J36 SIX)ARE FEET) �— Rsnpc ROUC P W N AREA 6 p61E5 TO Al" 3 AS –IS A 6.L NE NO CURB T GUTTER I I ` (D W ^ _ F NN NEW H.M.A.0 PAVEMENT I � w CURB dA p�ypr O I (yJ LLLLLL GUTTER _ I r I � --- �► m NC's - g ~ rn TING NEW H.MA C. I EXIS ROCK NEW PAVEMENT EDGE NO CURB 3 GUTTER – I W CL I / S 7" 03 I O E 260.3V I J 1 4 ao —, i — I I — — — — — — — — — — — / I / 1 1 / R.O.W. KOPPE R ESTAURANT LEW I / 1 I R I BRID P 1 I I AL & REPLACE E I I O. BOX 8005 BRYAN, TX 77805 I I OFF: (979) 764 -2933 FAX: (979) 846 -9226 FTIENAMO24"IA I SGMFd'�20' ISSUED DATE: MARCH 11, ZOOS CHMM BY: RAM. MLO BOOR: N A PAGES: N A RADON METCALF ENGINEERING NEW DRIVEWAY LOCATION r /JOINT FM 2154 ^A WELLBORN ROAD CLIENT NO. PROJECT NO. ACCESS EASEMENT 1 56 — 0240 cp wl STREET N06 I OF I PREAPPLICATION CONFERENCE The purpose of a preapplication conference is to meet the City staff that will be involved with your development and identify general issues that need further analysis. Along with the discussion of these major issues, staff will talk about the development process, distribute necessary information and discuss what permits will be required for your particular development. This meeting is in no way a complete review of your project. Staff will perform a formal thorough review once the minimum requirements are submitted for your particular ent. Date of Meeting: Time Date plans due by (noon): II �C�5 Applicant: �.�� / IC�L I t -1 T Phone Number: Q Property Owner: Phone Number: Pr iect Location / Leg description (including # acres): _ Y Proposal (type of development - retails, apts, SF, restaurant, etc.): City Staff Present: ❑ Joey Dunn ❑ Bridgette George Q�Molly Hitchcock ❑ Jennifer Reeves ❑ Jennifer Prochazka IF Alan Gibbs Carol Cotter ❑ Josh Norton ❑ Trey Fletcher ❑ Ken Fogle 09'teve Smith ❑ Jerry Duffey ❑ Eric Dotson ❑ Kjistan Clann mdsav Bover t7 o V `J11 -1It6 Issues to contact applicant back on AS6L . 1( \\-Q-, Development Issues: Land Use/ Existing Zoning Special zoning district informatio - ho C. 1'V CKd Utility Issues: . " � � y� l �l `_ u / v it i Water Availability/ Capacity: Sanitary Sewer Availability/ Capacity: Impact Fees: „ _ 0, g S� e Y� -tip. Miscellaneous: V O k � ls2n�, Variance Requests: Permits required for this development: Building Permit Development Permit Conditional Use Permit TxDOT Utility Permit for work in State ROW TxDOT Driveway Permit for work in State ROW Special Review required by: ZBA Design Review Board City Council Parks and Recreation Board Planning and Zoning Commission Information Provided: Unified Development Ordinance Subdivision Regulations Northgate Design Guidelines Development Resource Guide Guide to Building & Development Drainage Policy & Design Standards Specifications for Street Construction Water & Sewer Specifications Manual Driveway Access Location & Design Policy CS Business Center Covenants & Restrictions Fire Department Construction & Development Guide CS Building Regulations (Local Amendments to the Building Code) Subdivision / Platting Issues: �o 0 q_t . TU t," &-o, \►�Ia,tip , T -Fare Plan/ Street Issues: UL6 I�U - VA UJI Driveway Access: Vo 2uk-A bA� y6C�1 C�S Fire Flows: Site Plan Issues Non - residential architectural standards: - - Parking: ,,�_�_,,,��,5 Landscaping: Streetscaping Dumpster: _ Electrical: A Fire Lanes: Fire Hydrant: Signs: Screening/ E Easements: Others: Parkland /Greenways Dedication: Parks Board Consideration: Drainage Issues: Misc.: kowydL t i : t kkvV - fU OaIL., 0 v PREAPPLICATION CONFERENCE The purpose of a preapplication conference is to meet the City staff that will be involved with your development and identify general issues that need further analysis. Along with the discussion of these major issues, staff will talk about the development process, distribute necessary information and discuss what permits will be required for your particular development. This meeting is in no way a complete review of your project. Staff will perform a formal thorough review once the minimum requirements are submitted for your particular development. Date of Meeting: April 12, 2004 2:00 p.m. Applicant(s): C Phone Number: Phone Number: Others: City Staff Present: ❑ Natalie Ruiz 0" George • Deborah Grace • Susan Hazlett ❑ Molly Hitchcock e - ' J ' ennifer Reeves ❑ Jennifer Prochazka B Lauren Harrell V S encer Thompson rol Cotter &- Ronnie Bolin ❑ Jerry Duffey e<ymond Olsen ❑ Steve Smith ❑ Eric Hurt Issues to contact applicant back on: Development Issues: Land Use /Zoning (ie: Residential /R3) Special zoning district information: Subdivision/ Platting Issues: T -Fare Plan /Street Issues: Driveway Access: Site Plan Issues: s hm i -,4� o /sari 4,- f er.J Parkin v i3 rrr Landscaping: Streetscaping: Dumpster: Fire Hydrant: Signs: Screenipg /Bu gfe � sements: Parkland /Greenways Dedication: Parks Board Consideration: Drainage Issues: Utility Issues: Water Availability/ Capacity: Sanitary Sewer Availability/ Capacity: Electrical: Impact Fees: Miscellaneous: Variance Requests: Permits required for this development: Building Permit Conditional Use Permit Development Permit TxDOT Utility Permit for work in State ROW TxDOT Driveway Permit for work in State ROW Special Review required by: ZBA Design Review Board City Council Parks and Recreation Board Planning and Zoning Commission Information Provided: Zoning Ordinance Development Resource Guide Subdivision Regulations Guide to Building & Development Northgate Design Guidelines Drainage Policy & Design Standards Specifications for Street Construction Water & Sewer Specifications Manual Driveway Access Location & Design Policy CS Business Center Covenants & Restrictions Fire Department Construction & Development Guide CS Building Regulations (Local Amendments to the Building Code) PREAPPLICATION CONFERENCE The purpose of a preapplication conference is to meet the City staff that will be involved with your development and identify general issues that need further analysis. Along with the discussion of these major issues, staff will talk about the development process, distribute necessary information and discuss what permits will be required for your particular development. This meeting is in no way a complete review of your project. Staff will perform a formal thorough review once the minimum requirements are submitted for your particular development. Date of Meeting: Time: ,Date plans due by (noon): 5 +' Applicant: R - 0 1e"s7� Ca l T �� I�One Number: � q Property Owner: Ue- Phon Number: Project Location /Legal description (includ7 g # of acres): �• Q.C.ro 11.sr 1� , � ��,,, ". t�" L _k Y�r2 IIPro��posal (type of development - retails, apts, SF, restaurant, etc.): ll �kDIX, V� CW D City Staff Present: ❑ Joey Dunn L"Bridgette George ❑ Molly Hitchcock O I iennifer Reeves I nnifer Prochazka O �aCte W 02"'Alan Gibbs ❑ Carol Cotter R"Josh Norton ❑ Trey Fletcher ❑ Ken Fogle 11 I Alf /Y r_Jkiv (�'eAAa e P M'Steve Smith ❑ Jerry Duffey ❑ Eric Dotson ❑ Kristan Clann P Lindsay Boyer Issues to contact applicant back on: I %x Oor Development Issues: _ s / r< ���y��r��L /L!slia'i'J[����i.'�'_J! , • . �� ►aln.���7Ir� ►.I��Z�illr i � • z • NQ I • • • • Subdivision/ Platting Issues: T -Fare Plan /Street Issues: r Fire Flows: Site Plan Issues Non - residential architectural standards: Parking: Landscaping: Streetscaping: Dumpster: Electrical: Fire Lanes: Fire Hydrant: Signs: yy\\ Screening/ Buffering: 7V S n Easements: Others: Parkland / Greenways Dedication: Parks Board Consideration: L ZA Drainage Issues: Lll� ' AMMEEM .oR_. f/�� 5 R1 Utility Issues: Water Availability/ Capacity: Sanitary Sewer Availability/ Capacity: Impact Fees: Miscellaneous: Variance Requests: Permits required for this development: Building Permit Development Permit Conditional Use Permit TxDOT Utility Permit for work in State ROW TxDOT Driveway Permit for work in State ROW Special Review required by: V ZBA Design Review Board ✓ City Council Parks and Recreation Board ✓ Planning and Zoning Commission Information Provided: Unified Development Ordinance Subdivision Regulations Northgate Design Guidelines Development Resource Guide Guide to Building & Development Drainage Policy & Design Standards Specifications for Street Construction Water & Sewer Specifications Manual Driveway Access Location & Design Policy CS Business Center Covenants & Restrictions Fire Department Construction & Development Guide CS Building Regulations (Local Amendments to the Building Code)