HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
June 23, 2004
TO: Rabon Metcalf, via fax 979.690.0329
FROM: Jennifer Prochazka, Staff Planner
SUBJECT: KOPPE BRIDGE RESTUARANT II (SP) - Site Plan
Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review:
Six (6) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (please
submit additional copies to be stamped for your records).
Two (2) revised site plans; and
One (1) landscaping plan.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Koppe Bridge Bar & Grill, Inc. via fax 979.846.9226
Case file #04- 00500147
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: KOPPE BRIDGE RESTUARANT II (SP) — 04- 00500147
PLANNING
1. No comments.
Reviewed by: Jennifer Prochazka
LAN DSCAPING /STREETSCAPING /BUFFER
Date: June 18, 2004
1. The existing trees in the area proposed for parking were used to meet the original
landscape requirement. All points that were earned in this area need to be replaced
with this proposal. If you need a copy of the approved landscape plan from August
2001, please call me and I can get one for you.
2. Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
drainage areas, the parking lot setback, rights -of -way, and adjacent property
disturbed during construction.
Reviewed by:
Jennifer Prochazka
Date: June 18, 2004
ENGINEERING
1. No comments.
Reviewed by:
Carol Cotter
Date: June 23, 2004
ELECTRICAL
1. No Comments
Reviewed by: Tony Michalsky
Date: 6 -15 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2