Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application
VieRS0111114 F OFFICEASE LY CASE NO.: Q' .,-,- 1 r� DATE SUBMITTED: 1 0( la t DJ' TIME: `- • ps CITY OP COLLEGE STATION Home of TexasA&M University' STAFF: FINAL PLAT APPLICATION (Check one) ❑ Minor ❑ Amending ❑ Final ❑ Vacating © Replat ($700) ($700) ($932) ($932) ($932) Is this plat in the ETJ? ❑ Yes © No Is this plat Commercial © or Residential MINIMUM SUBMITTAL REQUIREMENTS: H $700 -$932 Final Plat Application Fee (see above). ❑ $233 Waiver Request to Subdivision Regulations Fee (if applicable). ❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). x Application completed in full. This application form provided by the City of College Station must be used and v 6 may not be adjusted or altered. Please attach pages if additional information is provided. Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) ❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. ❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Copy of original deed restrictions /covenants for replats (if applicable). X Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. X The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference 12- 12 -12 _ NAME OF PROJECT Aggieland Outfitters ADDRESS 303A & 3038 University Drive, 410 Nimitz Street and 411 & 413 Eisenhower Street SPECIFIED LOCATION OF PROPOSED PLAT: University Drive at Nimitz Street & Eisenhower Street APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Natalie Ruiz, IPS Group E -mail natalie @ipsgroup.us Street Address 511 University Drive East, Suite 204 City College Station State Texas Zip Code 77840 Phone Number 979.846.9259 Fax Number 979.260.3564 1/11 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name Fadi KalouzKalgroup Properties, LP and 303A Properties, LLC E -mail fadi @kalcorp.com Street Address 360 Graham Road City College Station _ State Texas Zip Code 77845 Phone Number 979 - 775 -8151 Fax Number 979- 412 -1212 ARCHITECT OR ENGINEER'S INFORMATION: Name Joe Schultz, P.E. - Schultz Engineering, LLC E -mail loeschultz84 @verizon.net Street Address 2730 Longmire Drive, Suite A City College Station State Texas Zip Code 77845 Phone Number 979 - 764 -3900 Fax Number 979- 764 -3910 Do any deed restrictions or covenants exist for this property? ❑ Yes ❑ No Is there a temporary blanket easement on this property? If so, please provide the Volume _ and Page No. Total Acreage 1.12 Total No. of Lots 4 _ R -O -W Acreage 0 Existing Use Commercial & Residential Proposed Use Commercial Number of Lots By Zoning District 4 / C -1 1 / Average Acreage Of Each Residential Lot By Zoning District: Floodplain Acreage 0 Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r - Yes IX No Thrs information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes X No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary). Project Name: City Project Number (if known) Date / Timeframe when submitted: 1 /11 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): N7A — Requested waiver to subdivision regulations and reason for same (if applicable): NIA • Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. NIA 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. NIA 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. NIA 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. NIA Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. r An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way; 2. 1 -- The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3. ` A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4. r_- Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate / rural context; 5. When a sidewalk is required along a street where a multi -use path is shown on the Bicycle, Pedestrian, and Greenways Master Plan; 1 /11 Page 3 of 9 6. I The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Requested Oversize ParticipationN'A Total Linear Footage of Parkland Dedication due prior to filing the Final Plat: Proposed Public: N/A ACREAGE: Streets N/A No. of acres to be dedicated + $ N/A development fee Sidewalks N/A No. of acres in floodplain Sanitary Sewer Lines N/A No. of acres in detention NIA Water Lines N/A No. of acres in greenways NIA Channels OR NIA Storm Sewers FEE IN LIEU OF LAND: NIA Bike Lanes / Paths N/A No. of SF Dwelling Units X $ N/A = $ N/A N/A (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attorney. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. Z //Z // Signature and title Date 1/11 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. 2 //2—// Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AlsLD CERTIFY, THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PF rTWF,.l.IC.A�`ivi, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND AC . URATE. t �: °° r e °r Z - -I2- _ Engine 0 a Cr Date - � 65889 19 0 1 0 4 4 .76.- e ., n � • ij 6 , s a.....1,• ` �` . T ONAL 1/11 Page 5 of 9