HomeMy WebLinkAboutApplication (12-253) 1 FO OFF SE O , Y
CASE NO.: /1 1 //
DATE SUBMITTED: IThift
CITY OF COLLEGE STATION TIME: _4'
Home of Texas A&M Univeniv' SITE PLAN APPLICATION
GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
1)EI $932 Site Plan Application Fee.
$350 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
c❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
/ due prior to the issuance of any plans or development permit).
MI Application completed in full. This application form provided by the City of College Station must be used
r a adjusted or altered.
V' x Fourteen nd may (1 4) be folded copies of site plan.
IM One (1) folded copy of the landscape plan.
N7 One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate
Building Review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
( ❑ Electronic copy of Site Plan e- mailed to csuelectdesign@cstx.gov.
v(J Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
® Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
ILIA Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
IIMA The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Strategic Behavioral Health, College Station
ADDRESS 3550 Normand Drive, College Station, TX 77845
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 3, Block 1, College Station Medical & Senior Living Subdivision
APPLICANT /PROJECT MANAGERS INFORMATION (Primary contact for the project):
Name Mitchell & Morgan, LLP Veronica Morgan E - mail v @mitchellandmorgan.com
Street Address 511 University Drive East, Suite 204
City College Station State . Texas _ Zip Code 77840 _
Phone Number 979 - 260 -6963 Fax Number 979 - 260 -3564
PROPERTY OWNER'S INFORMATION:
Name Jim Shaheen E -mail lshaheen@strategicbh.com
Street Address 8295 Tournament Drive, Suite 201
City Memphis State Tennessee Zip Code 38125
Phone Number 901 - 969 -3100 Fax Number 901 - 969 -3120
1/11 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name Joshua Aisenberg, LS3P E -mail joshaisenberg@ls3p.com
Street Address 434 Fayettville Street, Suite 1700
City Raleigh State North Carolina Zip Code 27601
Phone Number 704- 333 -6686 _ Fax Number 704- 333 -2926
OTHER CONTACTS (Please specify type of contact):
Name Christopher Reid E- mail creid @thomasconstructiongroup.com
Street Address 1111 Military C»tc-ff Road, Sui to 191
City Wilmington State NC Zip Code 28405
Phone Number (910) 799 -2295 Fax Number (910) 799 -2072
Current zoning PDD
Present use of property Vacant
Proposed use of property Behavioral Health Facility
Number of parking spaces required xxx Number of parking spaces proposed 114, 5 HC =119
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I Yes V No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
I Yes
V No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
1/11 Page 21111
MULTI - FAMILY RESIDENTIAL PARKLAND DEDICATION
(Fees due prior to the Issuance of a Building Permit)
Total Acreage N(A __ _ # of Multi- Family Dwelling Units
Floodplain Acreage N/A N/A X $1646 = $
Housing Units N/A
N/A # of acres in floodplain
_ N/A # of 1 Bedroom Units
N/A # of acres in detention
N/A # of 2 Bedroom Units
N/A # of acres in greenways
N/A # of 3 Bedroom Units
Date dedication approved by Parks &
N/A # of 4 Bedroom Units N/A Recreation Advisory Board
COMMERCIAL
FOR 2 BEDROOM UNITS ONLY 6.03 acres
Total Acreage
N/A # Bedrooms = 132 sq. ft.
Building Square Feet 52, 514 s/f
N/A # Bedrooms < 132 sq. ft.
Floodplain Acreage N/A
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Govemment
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts slated herein and exhibits attached hereto are true
and correct.
41,0: -
•and title Date
1/11 Page 3 of 11
31
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- Issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. in accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be In accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The Information and conclusions contained In the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to Y . (name or firm) Is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURAT —
/0 _
P • :,• Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compllancewith all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., protects over 10 acres may
require a sedimentation basin.
3, The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, ' ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND ENTS
F.+R HE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KN tl ,T� �1ND
A C RATE. # :- " "' S lt r
x 5 i1 4
i � iii * * .� i
I►.1 t l l 1— 3 a r 1 2 A a ll.!
Engineer
Date F t j . ' 77889 .
1/11 t. S'QNA Page 4 of 11
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill ! Grading Permits, and Clearing Only
Permits:*
A I, VVN45I4414) \ r7 certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and Tess than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) -crease Base Flood velocities. �•OF r ► ►t�
q t
bey. those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Codf�i 4}_. %. . ' !!
■ i 7" n6�
En sneer ■ i * Date !! p ` .
e ritf. 4 t1 �t 1 O s c.s�E \4a?=
Initial % i ONA`.�--
I 1* If a platting- status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I, V r ekt MLA 4 V c., , certify to the following:
(i) the any nonresidential or multi-4141y structure on or proposed to be on this site as pa ation is
d • ned to prevent damage to the structure or its contents as a result of flooding fro r e .
y� X11_ * ,1 s!
f SP" * "7,6 *...
I , /iii .:!�� , �. l i 30 1� y .:::.. . O RGAN
Engineer 1 Date r c ..' ' 77689 ,ip
3 � + �O &Gist .
Additional certific ion for Floodway Encroachments: tt SS/pNA►-�
C. I, certify that the construction, improvement, or fill c�v red • by this
permit shall not in ase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
1/11 Page 5 of 11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, N , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor Date
Commercial Structures:, In/�
E. 1, VY/r(ri/d �.1 1 r • certify that all new construction or any substantial improvement
of any commercial, industrial, or th r non - residential structure are designed to have the lowest floor, including all
es, ductwork and basements, elevated at least one foot above the Base Flood Elevation
+f 1 � � iiir Li& G (- 3c' (2
r■
Engineer / S Illc.yor Date
OR
I, N IA , certify that the structure with its attendant utility, ductwork,
basement and sa tary facilities is designed to be flood - proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
•
Engineer l Surveyor Date
Conditions or comments as part of approval:
Page 6 of 11