Loading...
HomeMy WebLinkAboutRMDL2008-01820Al /' ' 0 Date 8 O D 0�� Permit # ��/ Pro ject ect Name _�L_�___ Off-, L 7g l �5 F K ZtS4� Ste . ( Co O COMMERCIAL CO Planning (Lindsay Boyer, Jennifer Prochazka, Jennifer Reeves, Crissy Hard, Jason Schubert, Grant Wencel, Molly Hitchcock) Bridgette George Development Engineers (Alan Gibbs, Josh Norton, Carol Cotter) City Engineer (Bob Mosley, Jerry Jones, John Logan, Robert Bumpurs, William Ethridge) Environmental Services (Eaphrame Thomas, James Boykin, Pete Garcia) Fire Department (Eric Hurt, Eric Dotson, Jerry Duffey, Steve meth) Drainage (Donnie Willis) Public Works - Sanitation (Wally Urrutia) Electrical Services (Tony Michalsky) Water/Wastewater Services (Joe Mike Garcia, Paul Schoenfeld, Mitchel arson) Miscellaneous Notes BUILDING -PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- Application Number . . . . . Application pin number . . . Property Address . . . . . . Property ID: R #. Application type description Subdivision Name . . . . . . Property Use . . . . . . . . Property Zoning . . . . . . . Application valuation . . . . Owner HOWELL, WILLIAM R JR & CYNTHIA A 4715 STONEBRIAR CIR COLLEGE STATION TX 77845 08-00001820 Date 6/16/08 395320 4715 STONEBRIAR CIR 497900-0016-0080 R93811 RESIDENTIAL, REMODEL & RENOVATION PEBBLE CREEK RESIDENTIAL SINGLE FAMILY RESIDENTIAL 21450 Contractor ANCHOR PIERS, LLC. 2924 CAIN RD COLLEGE STATION TX 77845 (979) 219-2774 --- Structure Information 000 000 REPAIR PIERS Construction Type . . . . . **NEEDS TO BE ENTERED** ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT Additional desc . . AC Permit pin number . 581181 Permit Fee . . . . 120.00 Plan Check Fee .00 Issue Date . . . . 6/16/08 Valuation . . . . 21450 Expiration Date . . 12/13/08 Qty Unit Charge Per Extension BASE FEE 15.00 21.00 5.0000 THOU BLDG, VAL 1001-50000 105.00 ---------------------------------------------------------------------------- Special Notes and Comments -51 Foundation Repair Piers *ANY CHANGES OR ALTERATIONS TO SUBMITTED PLANS MUST BE RESUBMITTED AND APPROVED BEFORE WORK IS DONE IN ORDER TO ASSURE CODE COMPLIANCE *POST PERMIT CARD ON JOB SITE TO BE VISIBLE FROM ROAD *ALL PLUMBING, ELECTRICAL, AND HVAC (mechanical) WORK MUST BE PERFORMED BY LICENSED CONTRACTORS. CONTACT BUILDING DEPARTMENT FOR INSPECTIONS PRIOR TO COVERING ANY WORK ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total 120.00 120.00 .00 .00 Plan Check Total .00 0 00 .00 ------------------------------------------- ------ --- ---- ;------------ BUILDING DEPT REPRESENT TIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov Page 2 Application Number . . . . . 08-00001820 Date 6/16/08 Application pin number . . . 395320 Grand Total 120.00 120.00 .00 .00 - APPLICANT: For- Ur onr " APPLICATION FOR BUILDING PERMIT DATi?� CITY OF COLLEGE STATION APPLICATION , 1101 TEXAS AVENUE +(hrqCOLLEGE STATION; TX 77840 TEMP POLE # CITY OF COLLEGE STATION (979) 764-3570 (979) 764-3496 FAX Fkwmng&Drulopmew5rlvrn, WWW.CSTX.GOV ADDRESS/LOCATION: 44I I S LOT BLOCK SUBDIVISION SECIPH -� BUSINESS/OWNER NAME: 1.3 11--L- r I C _ L_ PHONE: CONTRACTOR/HOMEOWNER: 6�tiCIfc�2 yf7&? fNr�4y�pr�dG���}r,2 PHONE: 0-1 `f Z-7 -7 `j CONTACT PERSON FOR REVIEW COMMENTS: PHONE: FAx: EMAIL: ELECTRICIAN: PLUMBER: HVAC: GOOD CENTS (Resldential only): ACCESSORY/STORAGE MOVING RE -ROOF ADDITION NEW CONSTRUCTION' SHELL ONLY DEMOLITION (ASBESTOS SURVEY) PORTABLE STORAGE (RESIDENTIAL) SLAB ONLY DUPLEX (LANDSCAPE PLANS REQUIRED) PORTABLE STORAGE (NON-RESIDENTIAL) SWIMMING POOL LOCATION REMODEURENOVATION' TENTS DESCRIPTION OF WORK: S-I lee 4-/ �c PROPOSED USE: STRUCTURE USE: HOMEOWNER ASSOCIATION/ARCHITECTUAL OR DESIGN REVIEW COMMITTEE APPROVAL: TEXAS ACCESSIBILITY STANDARD (TAS) PROJECT REGISTRATION# EABPRJ VALUATION: $ 1 , G� ' TOTAL AREA: HEATED AREA: (C�Labor and Materials) PUBLIC SEWER NUMBER OF BEDROOMS: SEPTICfrREATMENT SYSTEM NUMBER OF BATHROOMS: SEWER TAP: INTERIOR WALL TYPE: SIZE WATER TAP: EXTERIOR WALL TYPE: s aE OTHER TAP: FOUNDATION TYPE: sae ❑ TEMP POLE ROOF TYPE: GARAGE TYPE: SINGLE DOUBLE a TRIPLE ATTACHED DETA ED F__j CARPORT F7 �r SIGNATURE OF APPLICANT: f `If proposed work involves new commercial con truction or facade improvements/renovations to an existing commercial property, building elevations are required. Official use Or ry Co ments: u` V r NO Plans Examiner Zoning Official 9-d 9CZ00696L6 e99:90 80 Cl, unf "= 2024°;Cain Road College Station, TX 77845 i r , ' • Offigq (979) 690-202o Date: Ldiz Fax: (979) 690-0235' AGREEMENT +• Anchor Piers LLC, called Contractor, and /Lt uyi 1 7�; L- r-f L L- , Owner agree that the sum of $ i c-I Sca = , to be paid as follows: .5 rrn " , ; ' • after piers are poured, balance on completion. Contractor will furnish labor, equipment and materials to perform the following described work to the hereinafter described , building or structure located at: y71 5 Story 4 Structure Phone (H) A 1. The work shall consist of the installation of L piers with nine inch diameter shafts drilled to 8"to 12' , water table rocks and/or man placed objects permitting. The bottom of the shaft will have a bell footing of 2D inches in diameter, unless rock is encountered. 2. Contractor assumes no responsibility for any under slab plumbing. It may currently be cracked, broken, deterio- rated or may do so in the leveling process. Any repairs, if required are the sole responsibility of the owner. S. Job site will be clean of all excess dirt and material. 4. Contractor will carry all required insurance. 5: When inside piers are called for, contractor will patch floors. Patches will be made with concrete to wooden floor level. Carpet will NOT be stretched. S. Where surfaces such as concrete floors or patios are broken in order to install piers, Contractor will patch such area. The patches, however, will not match he color or texture of the original material. Special surface such as Flagstone, Spanish Tile, Brick or other such special materials will be restored at a cost in addition to pier installa- tion. 7. In foundation leveling, conditions might appear when work is begun that were not visible when estimate was submitted, such as, insufficient reinforcing steel in concrete slab, and/or other original foundation structural deficiency. In such cases the guarantee becomes invalid. s 8. SPECIAL PROVISIONS: No $ubcontra ors. r ti ;% — n�.+� -+ a s a 3�� �-r"e ,. -- / A- , ' <'`a '�'Y4, to/JJNc77F'13C- 4C+Otc 'e 9. LIFETIME SERVICE AGREEMENT: If any raising is necessary due to settling during the first five years from date of completion of the job, Contractor will re -raise the settled area without cost to the OWNER. For additional years, servicing, if required, will be done at the rate of /o `) per adjusted pier, labor and materials included, plus or minus the U.S. Consumer Price Index each year. This service agreement applies only to the piers installed by Contractor. THIS AGREEMENT TRANSFERABLE TO NEW OWNERS: NOTIFICATION MUST BE TENDERED IN WRITING ' °'.WITHIN 30 ]DAYS OF OWNERSHft? It is understood agreed that in order to perform the above described work it is possible that sheetrock, wallpaper, or other rigid material may crack. Therefore, the above figure does not include any redecorating, repairing, electrical work or the replacement of any material not called for in this agreement. Contractor upon request from owner, will transplant plants and shrubs obstructing operations, and replace same, survival of shrubs and plants cannot be guaranteed. It is understood and agreed that Contractor will furnish all the labor, equipment and material and will perform all necessary work in connection with this job, in a good workmanlike manner. The Owner may order extra work to be done not contemplated by the contract. in which event, a separate Agreement for such work shall be entered between the Owner and the Contractor. No oral representation made by anyone can change or modify this Agreement. This Agreement in order to be binding by both parties, must be signed in the space provided below, and the original copy returned to this office within days from the date shown above. Anchor Piers LLC r--7 --- i Owner , Manager 9'd 9EZ00696L6 e99:90 g0 Cl, urf c'.yc�::xaei: Ia M■ ■■ ■■ ■■■imm ■■■ZIM ■■■I■■ M"A,■ : LL1-i ■■■■N I4:41ol ■■■■■ ■■■■N ��ER FOUNDATION DETAILS O DAMAGED FOUNDATIONS WHERE 5PECIFICALLY DESIGNATED FOR JWPAIR ONLY T EXISTING SLAB i BEAM �r / GRADE m S." RODS SkACN WAY ALL CONCRETE TO /E 5 SACK W/ 1.1/Z" ROCK SHIMAGROUT .� SOLID CONC. BLOCKS r0" STABLE CLAY 2'r' a" 1"MIN. JACK SPACE POUR CAP • FOOTING AT THE SAME t - TIME 1 ^ 3 - #4 VERT. O L C. W/ N2 TIES A 1a".. FRONT VIEW SIDE VIEW 8'd 9£Z00696L6 BL5:90 20 0unf