Loading...
HomeMy WebLinkAboutCNEW2008-0171711 V�-tu � -Datef Permit # � � ` pvqruo Project Name e 1 et ��cy COMMERCIAL CO Planning (Lindsay Boyer, Jennifer Prochazka, Jennifer Reeves, Crissy Hard, Jason Schubert, Grant Wencel, Molly Hitchcock) Bridgette George Development Engineers (Alan Gibbs, Josh Norton, Carol Cotter) City Engineer (Bob Mosley, Jerry Jones, John Logan, Robert Bumpurs, William Ethridge) Environmental Services Q� (Eaphrame Thomas, James Boykin, Pete Garcia) Fire Department (Eric Hurt, Eric Dotson, Jerry Duffey, Steve Smith) Drainage (Donnie Willis) Public Works - Sanitation (Wally Urrutia) EIectrical Services (Tony MidWsky) Water/Wastewater Services (Joe Mike Garcia, Paul Schoenfeld, Mitchell Carson) Miscellaneous Notes PREPARED 11/12/08, 8:02:21 INSPECTION TICKET PAGE 2 City of College Station INSPECTOR: BUILDING INSPECTOR DATE 11/11/08 ------------------------------------------------------------------------------------------------ ADDRESS . : 1604 COPPERFIELD PKWY 200 SUBDIV: CRESCENT POINTE PHASE 1 TENANT, NBR: THE LIERE AGENCY CONTRACTOR LEGEND BUILDER, INC PHONE (979) 774-4600 OWNER WJP OFFICE LLC PHONE PARCEL 212200-0102-0020 APPL NUMBER: 08-00001717 COMMERCIAL, OFFICES/BANKS/PROFESSION ------------------------------------------------------------------------------------------------ PERMIT: BLDG 00 BUILDING PERMIT REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ B100 01 6/26/08 DS BLDG, FOUNDATION -SLAB TIME: 17:00 ' 6/26/08 AP June 25, 2008 10:32:48 AM acarter. THURSDAY MORNING PLEASE B115 01 8/20/08 DS BLDG, FRAMING TIME: 17:00 9/02/08 DP August 20, 2008 2:41:00 PM glsouth. locked B115 02 9/02/08 DS BLDG, FRAMING TIME: 17:00 9/03/08 AP September 2, 2008 3:55:29 PM glsouth. B130 01 9/02/08 DS BLDG, INSULATION TIME: 17:00 9/03/08 AP September 2, 2008 2:17:49 PM glsouth. B125 01 1 / 1/08 ` BLDG, FINAL TIME: 17:00 % U� November 11, 2008 3:38:39 PM ccourt. ---+-------------------------if--- CONTINUED ONTO NEXT PAGE ----------------------------------- G*� (11/14/2008) Gina Southerlard - Re: Calling for CO @ 1604 Copperfield Pkwy Ste 200 Page 1 From: Jerry Duffey To: Christina Court Date: 11/14/2008 11:04 AM Subject: Re: Calling for CO @ 1604 Copperfield Pkwy Ste 200 CC: Benjamin McCarty; Chris Haver; Eric Dotson; Eric Hurt; Gina Southerland NO issues from Fire.. clear for a CO now............ >>> Christina Court 11/13/2008 12:26 PM >>> The Liere Agency by#08-1717 Any issues, please contact the contractor Legend Builders @ 774-4600. Thank you! Christina Court CSR Planning & Development City Of College Station 979.764.3570 (*//4" CITY OF COLLEGE STATION Property Address: Company Name: Buginess Name: Application to Stock/Fixture/Move-in Prior to Issuance of a Certificate of Occupancy Property Owner or Manager Information: Name: Address City, St Phone: Construction Company Information: Name: S Address: 6us- City, State, Zip: l'�/ � 5��. A"I Phone: c,/ 6 0o Mobile: I am applying for permission to: 4 Move furniture and/or equipment into the building Fixture and/or stock the building Conduct training for staff members only Other (Be Specific) I hereby make application to the City of College Station to perform the action(s) indicated above without the benefit of a Certificate of Occupancy. I certify that the above statements are true and correct. I understand that occupancy of a structure prior to obtaining a Certificate of Occupancy is a code violation and may result in the issuance of citation(s). I further understand that fines associated with citations range up to $2,000.00 per day. Applicant Signature: Printed N me: v� crr► Date: D ♦♦11111111111111111111111111111111111♦ ♦1111111111111111111111111♦ Building Department Representative: ---- Comments: Date: (,11%14/2008) Gina Southerland - Call!ng for CO @-1604 Coppefield Pkwy Ste 200 y Page 1 From: Christina Court To: CO Group Date: 11/13/2008 12:27 PM Subject: Calling for CO @ 1604 Copperf!eld Pkwy Ste 200 The Liere Agency by#08-1717 Any issues, please contact the contractor Legend Builders @ 774-4600. Thank you! Christina Court CSR Planning & Development City Of College Station 979.764,3570 (11/14/2008) Gina Southerla!id Ri .xCalling for CO @ 1604 Copperfield,rPkwy Ste 200 __. Page 1 From: Rodney Harris To: Alan Gibbs; Benjamin McCarty; Brenda Godfrey; Brent Read; Bridgette ... Date: 11/14/2008 10:35 AM Subject: Re: Calling for CO @ 1604 Copperf!eld Pkwy Ste 200 No Sanitation Issues! Rodney Harris Sanitation Foreman Public Works Tel(979)764-3698 Fax(979)764-3489 email: rharris@cstx.gov >>> Christina Court 11/13/2008 12:26 PM >>> The Liere Agency by#08-1717 Any issues, please contact the contractor Legend Builders @ 774-4600. Thank you! Christina Court CSR Planning & Development City Of College Station 979.764.3570 (11/14/2008) Gina Southerland Re Calling for CO @ 1604µCopp erfield Pkwy Ste 200 Page 1 From: Pete Garcia To: COS Date: 11/13/2008 3:44 PM Subject: Re: Calling for CO @ 1604 Copperfield Pkwy Ste 200 Attachments: Pete Garcia.vcf They are OK. Do not ask the Lord to Guide your Footsteps if you are not willing to move your Feet' This e-mail and/or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments. Thank You. >>> On 11/13/2008 at 12:26 PM, in message<491C1D0Q.5352.0048.0@csb(.gov>, Christina Court wrote: The Liere Agency by#08-1717 Any issues, please contact the contractor Legend Builders @ 774-4600. Thank you! Christina Court CSR Planning & Development City Of College Station 979.764.3570 (11/14/2008) Gina Southerland - Re: Calling for CO @ 1604 Copperfield Pkwy Ste 200 Pa„1 _._.. _ a a From: Jerry Duffey To: Christina Court Date: 11/13/2008 3:02 PM Subject: Re: Calling for CO @ 1604 Copperfield Pkwy Ste 200 CC: Benjamin McCarty; Chris Haver; Eric Dotson; Eric Hurt; Gina Southerland OK for Temp CO from Fire...needs key for the Knox Box >>> Christina Court 11/13/2008 12:26 PM >>> The Liere Agency by#08-1717 Any issues, please contact the contractor Legend Builders @ 774-4600. Thank you! Christina Court CSR Planning & Development City Of College Station 979.764.3570 BUILDING PERMIT CITY OF COLLEGE STATION ' 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- Application Number . . . . . Application pin number . . . Property Address . . . . . . Property ID: R #• Tenant nbr, name . . . . . . Application type description Subdivision Name . . . . . . Property Use . . . . . . . . Property Zoning . . . . . . . Application valuation . . . . 08-00001717 Date 6/19/08 354776 1604 COPPERFIELD PKWY 200 212200-0102-0020 R302594 THE LIERE AGENCY COMMERCIAL, OFFICES/BANKS/PROFESSION CRESCENT POINTE PHASE 1 UNKNOWN 250000 Owner Contractor WJP OFFICE LLC LEGEND BUILDER, INC 1604 COPPERFIELD PKWY P.O. BOX 9356 STE 100 COLLEGE STATION TX 77842 COLLEGE STATION TX 778453994 (979) 774-4600 Structure Information 000 000 Construction Type . . . . . **NEEDS TO BE ENTERED** Occupancy Type . . . . . . **NEEDS TO BE ENTERED** Other struct info . . . . . EXTERIOR WALL TYPE NA IMPACT/PRORATA FEES PAID NA FOUNDATION TYPE NA HEATED AREA 4000.00 INTERIOR WALL TYPE NA SEWER TYPE NA TRAFFIC IMPACT ANAL (TAZ) 164.00 ---------------------------------------------------------------------------- Permit . . . . . . BUILDING PERMIT Additional desc . . AC Permit pin number . 582080 Permit Fee . . . . 910.00 Plan Check Fee .00 Issue Date . . . . 6/19/08 Valuation . . . . 250000 Expiration Date . . 12/16/08 Qty Unit Charge Per Extension BASE FEE 460.00 150.00 3.0000 THOU BLDG, VAL 100001-500000 450.00 ---------------------------------------------------------------------------- Special Notes and Comments PROVIDE ADDRESS ON COMMERCIAL BUILDINGS -FRONT: 5" ADDRESS NUMBERS, AND ON REAR DOOR(S): 2" HIGH ADDRESS NUMBERS AND NAME OF BUSINESS. FOR MULTI -FAMILY RESIDENTIAL PROVIDE UNIT NUMBER ON FRONT DOOR AND IDENTIFY EACH UNIT FROM A REAJZ FIRE ------------------------------------------------- BUILDING DEPT REPRESENTATIVE:,,,, - C --- 9-AI44 --------------- APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov Application Number . . . . . 08-00001717 Application pin number . . . 354776 Special Notes and Comments Page 2 Date 6/19/08 LANE. IDENTIFY MULTI -FAMILY BUILDINGS WITH 12" BUILDING NUMBERS, VISIBLE FROM ALL ADJACENT/NEARBY FIRE LANES. ALL NUMBERS AND LETTERS SHALL HAVE CONTRASTING BACKGROUNDS. PROVIDE EXTERIOR LANDING LEVEL WITH THE INTERIOR FLOOR FOR REQUIRED EXIT DOOR(S) SUBMIT FIRE ALARM PLANS WITH PRODUCT DATA SHEETS - DESIGN AND INSTALL AS PER NFPA 72 NO WORK SHALL START UNTIL PLANS HAVE BEEN REVIEWED AND RETURNED PROVIDE FIRE EXTINGUISHERS) - VERIFY LOCATION AND PLACEMENT WITH THE FIRE MARSHALL'S OFFICE (MIN. 2A10BC) SUBMIT FIRE SPRINKLER PLANS AND CALCULATIONS FOR REVIEW NO WORK ON SPRINKLER SYSTEM SHALL BEGIN UNTIL PLANS HAVE BEEN REVIEW AND RETURNED. SPRINKLER SYSTEM CONTROLS AND WATER FLOW SWITCHES ARE REQUIRED TO BE MONITORED BY AN APPROVED MONITORING COMPANY. A COPY OF THE MONITORING CONTRACT SHALL BE SENT TO THE COLLEGE STATION FIRE DEPARTMENT, FIRE PREVENTION DIVISION. PROVIDE MINIMUM 42" CLEARANCE FROM CENTER LINE OF WATER CLOSET TO EDGE OF LAVATORY OR WALL TO COMPLY WITH ANSI 2003, ACCESSIBLE STANDARDS. REQUIRED EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY,TOOL OR SPECIAL KNOWLEDGE/EFFORT INTERIOR LIGHTING SHALL MEET THE CONTROLS AND WATTAGE REQUIREMENTS OF SECTION 505 OF THE 2006 INTERNATIONAL ENERGY CONSERVATION CODE. All roof and ground -mounted mechanical equipment shall be sreened from view or isolated so as not to be visible from any public right-of-way or residential district within 150 feet of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Acceptable methods of screening rooftop equipment may include, but are not limited to encasement, parapet walls, or partition screens. PROVIDE PANIC HARDWARE ON EXIT DOORS *POST PERMIT CARD ON JOB SITE TO BE VISIBLE FROM ROAD Fee summary Charged Paid Credited Due - - - - - ---------------------------------------------------- ------------------------------------------------ "4 ---------------- BUILDING DEPT REPRESENTATIVE: APPLICANT: BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE, COLLEGE STATION, TX 77840 PHONE: (979)764-3570 FAX: (979)764-3496 http://bpinspect.cstx.gov ---------------------------------------------------------------------------- Application Number . . Application pin number Permit Fee Total Plan Check Total Grand Total . . . 08-00001717 . . . 354776 910.00 910.00 .00 .00 910.00 910.00 Page 3 Date 6/19/08 .00 .00 .00 .00 .00 .00 ----------------------------------------------- ---------------- BUILDING DEPT REPRESFT�'ATIVE -n APPLICANT: APPLICATION FOR BUILDING PERMIT CITY OF COLLEGE STATION 1101 TEXAS AVENUE COLLEGE STATION, TX 77840 CITY OF COLLEGr STATION (979) 764-3570 (979) 764-3496 FAX pin+ning d- Unrlopn+eat e-krr WWW.CSTX.GOV ADDRESS/LOCATION: 1 Nf�7 / / CIP-1-4;- �jForOT+ Use Only DAT IC5 4O TR CI APPLICATION # -D.Z TEMP POLE #__ LOT BLOCK Z SUBDIVISION eke-S694rr SEC/PH BUSINESS/OWNER NAME: Z'eS116 �1Pi�E PHONE: CONTRACTOR/HOMEOWNER: ` k!WW 7_111d*10 A/ : PHONE: CONTACT PERSON FOR REVIEW COMMENTS:�` 11YN6/V PHONE: FAX: EMAIL: 112 !le' tq? / ,6 vS110?/n 0IW'1/ ELECTRICIAN: Dewht_7g `- ` PLUMBER: ✓6-AAJ HVAC: hod- /!?��!%��j GOOD CENTS (Residential only): ACCESSORY/STORAGE MOVING RE -ROOF ADDITION NEW CONSTRUCTION'` SHELL ONLY DEMOLITION (ASBESTOS SURVEY) PORTABLE STORAGE (RESIDENTIAL) SLAB ONLY DUPLEX (LANDSCAPE PLANS REQUIRED) PORTABLE STORAGE (NON-RESIDENTIAL) SWIMMING POOL LOCATION REMODEL/RENOVATION' TENT RETAINING WALL Id - F1 DESCRIPTION OF WORK: PROPOSED USE: STRUCTURE USE: HOMEOWNER ASSOCIATION/ARCHITECTUAL OR DESIGN REVIEW COMMITTEE APPROVAL: NlIiQ TEXAS ACCESSIBILITY STANDARD (TAS) PROJECT REGISTRATION NO. EABPRJ VALUATION: $ Z56VO6 TOTAL AREA: HEATED AREA: (Cost of Labor and Materials) 0 PUBLIC SEWER ❑ SEPTIC/TREATMENT SYSTEM ❑ SEWER TAP: ❑ WATER TAP: ❑ OTHER TAP: P TEMP POLE GARAGE TYPE SIZE SIZE SIZE SINGLE El ATTACHED NUMBER OF BEDROOMS: NUMBER OF BATHROOMS: INTERIOR WALL TYPE: EXTERIOR WALL TYPE: FOUNDATION TYPE: ROOF TYPE: DOUBLE DETACHED F-1 TRIPLE El ;ARPORT SIGNATURE OF APPLICANT: "If proposed work involves new c rc al construction or facade improvements/renovations to an existing commercial property, building elevations are required. ............................................................ Official Use Only Plans Examinir Zoning Official ents: YES lor NO Energy Code Compliance Information % Glazing of exterior walls Insulation R value of exterior walls Insulation R value of ceiling 1 (flat areas) Insulation R value of ceiling 2 (vaulted areas/no attic) Glazing SHGC (Solar Heat Gain Coefficient) Glazing U-Factor R value of ductwork A/C SEER Rating Protection Against Subterranean Termites ❑ Chemical Termiticide Treatment (Soil Treatment) ❑ Chemical Termiticide Treatment (Field Applied Wood Treatment) ❑ Physical Barriers ❑ Other * Verification of Application shall be submitted to the City of College Station Building Division prior to issuance of the Certificate of Occupancy. ABProjRegForm Page 1 of 1 Texas Department of Licensing and Regulation Architectural Barriers Project Registration Confirmation Page Wednesday, June 18, 2008 EABPRJAB818609 PERSON FILING FORM Name: Eddie Hare Email: ehare@traditionsdub.com Phone: 979-820-0149 RAS Number: 00000008 Project Name: Finish -out for the Liere Agency Project Address: Liere Agency 1604 Copperfield Dr., Ste. 200 College Station, TX 77845 County: Brazos TENANT Name: Phone: — Tenant Address: Contact Name: Phone: — Contact Address: BUILDING/FACILITY Name: Liere Agency FACILITY Owner: The Liere Agency Phone: 979-220-3324 Owner Address: 1604 Copperfield Drive, Ste. 200, College Station, Tx 77845 Contact Name: Leslie Liere Phone: 979-220-3324 Contact Address: DESIGN FIRM Name: L.B.I. Phone: 979-774A,600 Firm Address: P.O. Box 9356, College Station, Tx 77842-9356 Designer Name: Steve Hanson Email: Type of License: Other License Number: n/a PROJECT DESCRIPTION Date Construction Documents Received By RAS: 06/18/2008 Start Date: 06/2008 Completion date: 1112008 Estimated Cost: $220,000.00 Type of Work: New Construction Does this building(s) have more than one level? Yes Are there any elevators, escalators, or platform lifts in this building? No Type of Funds: This project is privately funded, on private land for private use. State Lease No. : Scope of Work: Finishout a new unoccupied shell building @ a certified facility. Submit this AB Confirmation Page, Project Status Update Form and applicable fees to TDLR at P.O. Box 12157 Austin, Texas 78711 in accordance with the Texas Administrative Code Chapter 68. Enter Another Project Print this Page ToQof PagelTDLR Home PagelAB Home PagelAB Project RegistrelFeedback http://www.license.state.tx.us/abprojectregistration/ABProjRegFormVerification.aspx?strR... 6/ 18/2008 Generated by COMcheck-Web Software Envelope Compliance Certificate 20061ECC Report Date: 06/18/08 Section 1: Project Information Project Type: New Construction Project Title : Construction Site: Owner/Agent: Section 2: General Information Building Location (for weather data): College Station, Texas Climate Zone: 2a Heating Degree Days (base 65 degrees F): 1788 Cooling Degree Days (base 50 degrees F): 6851 Activity Tvoefs) Floor Area Office 4720 Section 3: Requirements Checklist Envelope TBD7 No'lope assem6liesspecifOd Climate -Specific Requirements: Designer/Contractor: Component Name/Description Gross Area Cavity Cont. Proposed Budget or Perimeter R-Value R-Value U-Factor U-Factor (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements: Air Leakage, Component Certification, and Vapor Retarder Requirements: 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor -permeable wrapping material installed in accordance with the manufacturer's installation instructions. LJ 2. Windows, doors, and skylights certified as meeting leakage requirements. 3. Component R-values & U-factors labeled as certified. 4. Insulation installed according to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation. 5. No roof insulation is installed on a suspended ceiling with removable ceiling panels. 6. Stair, elevator shaft vents, and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. Lj 7. Cargo doors and loading dock doors are weather sealed. Lj 8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material. Note: Vapor retarder not required in this location. Project Title: Report date: 06/18/08 Data filename: Page 1 of 8 eGenerated by COMcheck-Web Software Is Interior Lighting Compliance m(j Certificate 2006 IECC Report Date: 06/18/08 Section 1: Project Information Project Type: New Construction Project Title : Construction Site: Owner/Agent: Designer/Contractor: Section 2: General Information Building Use Description by: Activity Type Activity Type(s) Floor Area Office 4720 Section 3: Requirements Checklist Interior Lighting: 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 4720 4648 YES Controls, Switching, and Wiring: ❑ 2. Independent controls for each space (switch/occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. El 3. Master switch at entry to hotel/motel guest room. 4. Individual dwelling units separately metered. 5. Each space provided with a manual control to provide uniform light reduction by at least 50%. Exceptions: Only one luminaire in space; An occupant -sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or sleeping unit. Areas that use less than 0.6 Watts/sq.ft. 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. 7. Photocell/astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. 0 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: Electronic high -frequency ballasts; Luminaires on emergency circuits or with no available pair. Section 4: Compliance Statement Project Title: Report date: 06/18/08 Data filename: Page 2 of 8 Compliance. Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2006 IECC requirements in COMcheck-Web and to comply with the mandatory requirements in the equirements Checklist. Name gnAura Dat Project Title: Report date: 06/18/08 Data filename: Page 3 of 8 Generated by COMcheck-Web Software Interior Lighting Application Worksheet 2006 IECC Report Date: Section 1: Allowed Lighting Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Office 4720 1 4720 Total Allowed Watts = 4720 Section 2: Proposed Lighting Power Calculation A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. :Office (4720 sqA.)_ _ Linear Fluorescent 1: 2424: 24in. T8U 32W / Magnetic 2 10 64 640 Linear Fluorescent 2: 48in. T12 40W / Magnetic 1 12 40 480 Linear Fluorescent 3: up: 48 in. T8 25W (Super T8) / Magnetic 2 6 25 150 Linear Fluorescent 4: kitchen: 221n. T5 14W / Magnetic 1 5 14 70 Compact Fluorescent 1: Rec.: Quad 2-Pin 28W / Magnetic 1 53 28 1484 Compact Fluorescent 2: Track: Twin Tube 24/26/27W / Magnetic 4 18 96 1728 Compact Fluorescent 3: bath: Triple 4-Pin 32W / Magnetic 1 3 32 96 Total Proposed Watts = 4648 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies. Total Allowed Watts = 4720 Total Proposed Watts = 4648 Project Compliance = 72 L i or, . _. _. x g aaie 7 $i ¢ v Y }h S! g2Gr k Interior, fighting PASSES° Design 2io better than coded":'4,: ,° f Project Title: Report date: 06/18/08 Data filename: Page 4 of 8 Generated by COMcheck-Web Software Mechanical Compliance Certificate 2006 IECC Report Date: 06/18/08 Section 1: Project Information Project Type: New Construction Project Title : Construction Site: Owner/Agent: Section 2: General Information Building Location (for weather data): College Station, Texas Climate Zone: 2a Heating Degree Days (base 65 degrees F): 1788 Cooling Degree Days (base 50 degrees F): 6851 Section 3: Mechanical Systems List Designer/Contractor: Quantity System Type & Description 3 HVAC System 1: Split System Heat Pump, Cooling Capacity <54 kBtu/h, Air -Cooled Condenser / Single Zone 2 HVAC System 2: Split System Heat Pump, Cooling Capacity >=54 - <65 kBtu/h, Air -Cooled Condenser / Single Zone 1 Water Heater 1: Electric Storage Water Heater, Capacity: 50 gallons Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 : 1. Equipment minimum efficiency: Heat Pump: 6.8 HSPF, 10.0 SEER 2. Heat pump thermostat required when supplemental electric resistance heat is installed Requirements Specific To: HVAC System 2: Ej 1. Equipment minimum efficiency: Heat Pump: 6.8 HSPF, 10.0 SEER 2. Heat pump thermostat required when supplemental electric resistance heat is installed Requirements Specific To: Water Heater 1 : EI 1. Hot water system sized per manufacturer's sizing guide 2. Electric Water Heater efficiency >= 0.86 EF, 267 SL, Btu/h (if > 12 kW) 3. First 8 ft of outlet piping is insulated 4. Hot water storage temperature adjustable down to 120 degrees F or lower 5. Heat traps provided on inlet and outlet of storage tanks Generic Requirements: Must be met by all systems to which the requirement is applicable: LI 1. Load calculations per 2001 ASHRAE Fundamentals 2. Plant equipment and system capacity no greater than needed to meet loads Exception: Standby equipment automatically off when primary system is operating Exception: Multiple units controlled to sequence operation as a function of load i] 3. Minimum one temperature control device per system El 4. Minimum one humidity control device per installed humidification/dehumidification system Project Title: Report date: 06/18/08 Data filename: Page 5 of 8 0 5. Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7-day clock, 2-hour occupant override, 10-hour backup Exception: Continuously operating zones Exception: 2 kW demand or less, submit calculations 6. Outside -air source for ventilation; system capable of reducing OSA to required minimum Lj 7. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly - Exception: Ducts located within equipment - Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F. - Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g. pressure classification 8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment 9. Ducts sealed -longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics ❑ 10. Hot water pipe insulation: 1 in. for pipes —1.5 in. and 2 in. for pipes >1.5 in. Chilled water/refrigerant/brine pipe insulation: 1 in. for pipes —1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes —1.5 in. and 3 in. for pipes >1.5 in. - Exception: Piping within HVAC equipment - Exception: Fluid temperatures between 55 and 105 degrees F - Exception: Fluid not heated or cooled - Exception: Runouts <4 ft in length 11.Operation and maintenance manual provided to building owner 12. Piping, insulated to 112 in. if nominal diameter of pipe is <1.5 in.; Larger pipe insulated to 1 in. thickness 13. Lavatory faucet outlet temperatures in public restrooms limited to 110 degrees F (43 degrees C) 14. Balancing devices provided in accordance with IMC (2006) 603.17 15. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings - Exception: Gravity dampers acceptable in buildings <3 stories - Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan o 16.Stair and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC requirements in CO check -Web and to comply with the mandatory requirements in the Requirements Checklist. Name - Title ig ture Date Project Title: Report date: 06/18/08 Data filename: Page 6 of 8 6 Generated by COMcheck-Web Software �( Mechanical Requirements Description 20061ECC Report Date: The following list provides more detailed descriptions of the requirements in Section 4 of the Mechanical Compliance Certificate. Requirements Specific To: HVAC System 1 : 1. The specified heating and/or cooling equipment is covered by the ASHRAE 90.1 Code and must meet the following minimum efficiency: Heat Pump: 6.8 HSPF, 10.0 SEER 2. Heat pumps having supplementary electric resistance heat must have controls that, except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. Requirements Specific To: HVAC System 2: 1. The specified heating and/or cooling equipment is covered by the ASHRAE 90.1 Code and must meet the following minimum efficiency: Heat Pump: 6.8 HSPF, 10.0 SEER 2. Heat pumps having supplementary electric resistance heat must have controls that, except during defrost, prevent supplementary heat operation when the heat pump can meet the heating load. Requirements Specific To: Water Heater 1 : 1. Service water heating system design loads for the purpose of sizing systems and equipment must be determined in accordance with manufacturers' published sizing guidelines. 2. Service water heating equipment used solely for heating potable water, pool heaters, and hot water storage tanks must meet the following miniumum efficiency: Electric Water Heater efficiency >= 0.86 EF, 267 SL, Btu/h (if > 12 kW) 3. Insulation must be provided for the first 8 ft of outlet piping for a constant temperature nonrecirculating storage system and for the inlet pipe between the storage tank and a heat trap in a storage system. 4. Temperature controls must be provided that allow for storage temperature adjustment from 120 degrees F or lower to a maximum temperature compatible with the intended use except when the manufacturer's installation instructions specify a higher minimum thermostat setting to minimize condensation and resulting corrosion. Documentation of the installation instructions must be provided to be exempted from this requirement. 5. Heat traps must be provided on inlet and outlet vertical pipe risers serving storage water heaters and storage tanks not having integral heat traps and serving a nonrecirculating system. Heat traps must be installed as close as practical to the storage tank. Acceptable heat traps are either a) a device specifically designed for the purpose or b) an arrangement of tubing that forms a loop of 360 degrees F, or c) piping that from the point of connection to the water heater (inlet or outlet) includes a length of piping directed downwards before connection to the vertical piping of the supply water or hot water distribution system. Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. Design heating and cooling loads for the building must be determined using procedures in the ASHRAE Handbook of Fundamentals or an approved equivalent calculation procedure. 2. All equipment and systems must be sized to be no greater than needed to meet calculated loads. A single piece of equipment providing both heating and cooling must satisfy this provision for one function with the capacity for the other function as small as possible, within available equipment options. - Exception: The equipment and/or system capacity may be greater than calculated loads for standby purposes. Standby equipment must be automatically controlled to be off when the primary equipment and/or system is operating. - Exception: Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided with controls to sequence operation of the units as the load increases or decreases. 3. Each heating or cooling system serving a single zone must have its own temperature control device. 4. Each humidification system must have its own humidity control device. 5. The system or zone control must be a programmable thermostat or other automatic control meeting the following criteria: a) capable of setting back temperature to 55 degrees F during heating and setting up to 85 degrees F during cooling, b) capable of automatically setting back or shutting down systems during unoccupied hours using 7 different day schedules, c) have an accessible 2-hour occupant override, d) have a battery back-up capable of maintaining programmed settings for at least 10 hours without power. - Exception: A setback or shutoff control is not required on thermostats that control systems serving areas that operate continuously. - Exception: A setback or shutoff control is not required on systems with total energy demand of 2 kW (6,826 Btu/h) or less. Project Title: Report date: 06/18/08 Data filename: Page 7 of 8 .6. The system must supply outside ventilation air as required by Chapter 4 of the International Mechanical Code. If the ventilation system is designed to supply outdoor -air quantities exceeding minimum required levels, the system must be capable of reducing outdoor -air flow to the minimum required levels. 7. Air ducts must be insulated to the following levels: a) Supply and return air ducts for conditioned air located in unconditioned spaces (spaces neither heated nor cooled) must be insulated with a minimum of R-5. Unconditioned spaces include attics, crawl spaces, unheated basements, and unheated garages.b) Supply and return air ducts and plenums must be insulated to a minimum of R-8 when located outside the building.c) When ducts are located within exterior components (e.g., floors or roofs), minimum R-8 insulation is required only between the duct and the building exterior. Exception: Duct insulation is not required on ducts located within equipment. Exception: Duct insulation Is not required when the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15 degrees F. Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g, pressure classification. 8. Mechanical fasteners and seals, mastics, or gaskets must be used when connecting ducts to fans and other air distribution equipment, including multiple -zone terminal units. 9. All joints, longitudinal and transverse seams, and connections in ductwork must be securely sealed using weldments; mechanical fasteners with seals, gaskets, or mastics; mesh and mastic sealing systems; or tapes. Tapes and mastics must be listed and labeled in accordance with UL 181A and shall be marked '181A-P' for pressure sensitive tape,'181A-M' for mastic or'181A-H' for heat -sensitive tape. Tapes and mastics used to seal flexible air ductsand flexible air connectors shall comply with UL 181 B and shall be marked '181 B-FX' for pressure -sensitive tape oe181 B-M' for mastic. Unlisted duct tape is not permitted as a sealant on any metal ducts. 10. All pipes serving space -conditioning systems must be insulated as follows: Hot water piping for heating systems: 1 in. for pipes ­1 1/2-in. nominal diameter, 2 in. for pipes >1 1/2-in. nominal diameter. Chilled water, refrigerant, and brine piping systems: 1 in. insulation for pipes ­1 1/2-in. nominal diameter, 1 1/2 in. insulation for pipes >1 1/2-in. nominal diameter. Steam piping: 1 1/2 in. insulation for pipes ­1 1/2-in. nominal diameter, 3 in. insulation for pipes >1 1/2-in. nominal diameter. - Exception: Pipe insulation is not required for factory -installed piping within HVAC equipment. - Exception: Pipe insulation is not required for piping that conveys fluids having a design operating temperature range between 55 degrees F and 105 degrees F. - Exception: Pipe insulation is not required for piping that conveys fluids that have not been heated or cooled through the use of fossil fuels or electric power. - Exception: Pipe insulation is not required for runout piping not exceeding 4 ft in length and 1 in. in diameter between the control valve and HVAC coil. 11. Operation and maintenance documentation must be provided to the owner that includes at least the following information:a) equipment capacity (input and output) and required maintenance actionsb) equipment operation and maintenance manualsc) HVAC system control maintenance and calibration information, including wiring diagrams, schematics, and control sequence descriptions; desired or field -determined set points must be permanently recorded on control drawings, at control devices, or, for digital control systems, in programming commentsd) complete narrative of how each system is intended to operate. 12. Service hot water piping, where required, must be insulated to 1/2 in. if pipe less than 1.5 in. nominal diameter. Larger pipe must be insulated to 1 in.. Pipe insulation will have a conductivity of less than 0.28 Btu.in/(h-ft2-degrees F). 13. Temperature controlling means must be provided to limit the maximum temperature of water delivered from lavatory faucets in public facility restrooms to 110 degrees F. 14. Replaced with 15. Outdoor air supply and exhaust systems must have motorized dampers that automatically shut when the systems or spaces served are not in use. Dampers must be capable of automatically shutting off during preoccupancy building warm-up, cool -down, and setback, except when ventilation reduces energy costs (e.g., night purge) or when ventilation must be supplied to meet code requirements. Both outdoor air supply and exhaust air dampers must have a maximum leakage rate of 3 cfm/ft2 at 1.0 in w.g. when tested in accordance with AMCA Standard 500. - Exception: Gravity (non -motorized) dampers are acceptable in buildings less than three stories in height. - Exception: Systems with a design outside air intake or exhaust capacity of 300 cfm (140 Us) or less that are equipped with motor operated dampers that open and close when the unit is energized and de -energized, respectively. 16. Stair and elevator shaft vents must be equipped with motorized dampers capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. All gravity outdoor air supply and exhaust hoods, vents, and ventilators must be equipped with motorized dampers that will automatically shut when the spaces served are not in use - Exception: Gravity (non -motorized) dampers are acceptable in buildings less than three stories in height above grade - Exception: Ventilation systems serving unconditioned spaces. Project Title: Report date: 06/18/08 Data filename: Page 8 of 8