HomeMy WebLinkAboutRMDL2007-01134o�-��'
F
�
���rl��►l�� ��
��:�
mom..
BUILDING PERMIT
" CITY OF COLLEGE STATION
1101 TEXAS AVE
COLLEGE STATION, TX 77840
PHONE`: (979) 764-3570 FAX: (979) 764-3496
----------------------------------------------------------------------------
Application Number
. . . . . 07-00001134 Date
4/18/07
Application pin number
. . . 109078
Property Address .
. . . . . 4003 WINDSWEPT DR
Property ID:
569500-0001-0100
R #:
R40960
Tenant nbr, name .
. . . . . FOUNDATION REPAIR
Application type description
RESIDENTIAL, REMODEL & RENOVATION
Subdivision Name .
. . . . . SHENANDOAH PH 1
Property Use . . .
. . . . . RESIDENTIAL
Property Zoning . .
. . . . . SINGLE FAMILY RESIDENTIAL
Application valuation
. . . . 2450
Owner
Contractor
------------------------
EASTWOOD, ANN MARIE
------------------------
ANCHOR PIERS, LLC.
PO BOX 9262
2924 CAIN RD
COLLEGE STATION
TX 778429262 COLLEGE STATION
TX 77845
(979) 2 19 -2 774
--------------------- Structure
Information 000 000----------------------
Construction Type .
. . . . COMBUSTIBLE (UNPROTECTED)
Occupancy Type . .
. . . . RESIDENTIAL-SFR/DUPLEX
Other struct info .
. . . . IMPACT/PRORATA FEES PAID NA
HEATED AREA
1.00
INTERIOR WALL TYPE NA
TAZ
427.00
----------------------------------------------------------------------------
Permit
BUILDING PERMIT
Additional desc
NC
Permit pin number
495879
Permit Fee . . . .
25.00 Plan Check Fee
.00
Issue Date . . . .
4/18/07 Valuation . . . .
2450
Expiration Date . .
10/15/07
Qty Unit Charge Per Extension
BASE FEE 15.00
2.00 5.0000 THOU BLDG, VAL 1001-50000 10.00
----------------------------------------------------------------------------
Special Notes and Comments
7 Foundation Repair Piers
ANY CHANGES OR ALTERATIONS TO SUBMITTED PLANS MUST BE
RESUBMITTED AND APPROVED BEFORE WORK IS DONE IN ORDER TO
ASSURE CODE COMPLIANCE
POST PERMIT CARD ON JOB SITE
ALL PLUMBING, ELECTRICAL, AND HVAC (mechanical) WORK MUST
BE PERFORMED BY LICENSED CONTRACTORS. CONTACT BUILDING
DEPARTMENT FOR INSPECTIONS PRIOR TO COVERING ANY WORK
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - i- - - - - - - -
BUILDING DEPT REPRESENT IVE: 2
APPLICANT: /�1
BUILDING PERMIT
CITY OF COLLEGE STATION
1101 TEXAS AVE
COLLEGE STATION, TX 77840
PHONE: (979)764-3570 FAX: (979)764-3496
----------------------------------------------------------------------------
Page 2
Application
Number . . . . .
07-00001134
Date 4/18/07
Application
pin number . . .
109078
----------------------------------------------------------------------------
Fee summary
Charged
Paid
----------
Credited
----------
Due
----------
-----------------
Permit Fee
----------
Total 25.00
25.00
.00
.00
Plan Check
Total .00
.00
.00
.00
Grand Total
25.00
25.00
.00
.00
-------- ---- ---------------
BUILDING DEPT REPRESENTATIVE%: APPLICANT:
APR-16-2007 10:45 AM ANCHOR PIER LLC
t
P. 04
Par aea U" pny
APPLICATION FOR BUILDING PERMIT SATE: •
CITY OF COLLEGE STATION
1101 TEXAS AVENUE APPLICATION e
COLLEGE STATION, TX 77840 rEMa' POLE
Ot
('r W OF COLLEGE STATION (979) 704.3670 (979) 764-M6 FAX
P4wl��DrrdaOmnusnvinr WWW.CSTX.GOV
ADDRESS/LOCATION:DD��
LOT BLOCK , , SUBDIVISION SEC/Pk�_
BUSINESS/OWNER NAME: /4A,) f7f s�JG^c) PHOtJE:
CONTRACTOR/HOMEOWNER:
CONTRACTOR ADDRESS:
ELECTRICIAN;
PLUMBER:
HVAC:
GOOD CENTS (Reeldenual only):
CLAS$ OF WORK
ACCESSORY/STORAGE
LOCATION .
RE -ROOF
ADDITION
MOVING
SHELL ONLY
DEMOLITION (Asbestos Survey)
NEW CONSTRUCTION
SLAB ONLY
DUPLEX (Landscape Plans
REMODEURENOVATION'
SWIMMING POOL
Required)
A e' '
DESCRIPTION OF WORK;
STRUCTURE USE:
HOMEOWNER ASSOCIATION/ARCHITECTUAL OR DESIGN REVIEW COMMITTEE APPROVAL:
TEXAS ACCESSIBILITY STANDARD (TAS) PROJECT REGISTRATION# EABPRJ
G �?
VALUATION: $ So TOTAL AREA: __. HEATED AREA:
(Cost Labor and Matedals) "'—
❑ PUBLIC SEWER NUMBER OF BEDROOMS:
❑ SEPTIC/TREATMENT SYSTEM NUMBER OF BATHROOMS;
❑ SEWER TAP:
❑ WATER TAP,
❑ OTHER TAP;
❑ TEMP POLe
GARAGE TYPE:
80
SIZE
Blze
SINGLE ❑
ATTACHED ❑
INTERIOR WALL TYPE:
EXTERIOR WALL TYPE:
FOUNDATION TYPE:
ROOF TYPE;
DOUBLE ❑ TRIPLE U
�VACHED ❑ CARPORT L..J
SIGNATURE OF APPLICANT:
'If proposed work involves new commerdal constnictlon or fac mprovements/renovations to an existing
commercial property, building elevations are required.
Ofl'lclal Use Only
i q-1 7 -o Z
Plans Examiner
Zoning Official
ants:
ES r NO
APR-16-2007 10:46 AM ANCHOR PIER LLC 1 P.05
2924 Cain Road .
College Station, TX 77845 •
Office: (979) 690.2020 Date;,
Fax: (979) 690-0235 /J AGREEMENT
Anchor piers LLC, called Contractor, and F(-ST-�,J 47 c) , Owner agree that the sum
.Tb �Q _
of '_ to be paid as follows: o
-7 after piers are poured, balance on completion,
j Contractor will furnish labor, equipment and materials to perform the following described work to the hereinafter described
t . building or structure located at: /N D w e or.; C', Story I-P 3 Structure
Phone (H) 0z a 5„-It a i' ._ (W) r.
ra x 8
1. The work shall consist of the Installation of a ~ rll7
piers with nine Inch diameter shafts
„�..,� fts drilled to 8" to 12' ,water
table rocks and/or man placed objects permitting, The bottom of the shaft will have a bell footing of 20 inches in
diameter, unless rock is encountered.
2. Contractor assumes no responsibility for any under slab plumbing. It may currently be cracked, broken, deterio-
rated or may do so In the leveling process. Any repairs, if required are the sole responsibility of the owner.
S. Job site will be clean of all excess dirt and material.
4. Contractor will carry all required insurance.
5. When inside piers are called for, contractor will patch floors. Patches will be made with concrete to wooden floor
level. Carpet will NOT be stretched.
6. Where surfaces such as concrete floors or patios are broken in order to install piers, Contractor will patch such
area. The patches, however, will not match he color or texture of the original material. Special surface such as
Flagstone, Spanish Tile, Brick or other such special materials will be restored at a cost in addition to pler Installa-
tion.
_ 7. In foundation leveling, conditions might appear when work Is begun that were not visible when estimate was
submitted, such as, Insufficient reinforcing steel in concrete slab, and/or other original foundation structural
deficiency. In such cases the guarantee becomes invalid.
8. SPECIAL PROVISIONS: No Subcontractors. e--. t,k t� .? �4 ,
9. WFETIME SERVICE AGREEMENT: If any raising is necessary due to settling during the first five years from date
Of completion of the Job, Contractor will re -raise the sealed area without cost to the OWNER. For additional
years, servicing, if required, will be done at the rate Of / o - per adjusted pier, labor and materials included,
plus or minus the U.S. Consumer Price Index each year. This service agreement applies only to the J piers
Installed by Contractor.
THIS AGREEMENT TRANSFERABLE TO NEW OWNERS. NOTIFICATION MUST BE TENDERED IN WRITING
WITHIN 30 DAYS OF OWNERSHIP.
it Is understood agreed that In order to perform the above described work it is possible that sheatrock, wallpaper, or other
rigid material may crack. Therefore, the above figure does not include any redecorating, repairing, electrical work or the
replacement of any material not called for in this agreement. Contractor upon request from owner, will transplant plants
and shrubs obstructing operations, and replace same, survival -of shrjj�s and plants cannot og guaranteed.
It Is understood and agreed that Contractor will furnish all the labor, equipment and material and will perform all necessary
work In connection with this job, In a good workmanlike manner,
The Owner may order extra work to be done not contemplated by the contract. In which event, a separate Agreement for
such work shall be entered between the Owner and the Contractor. No oral representation made by anyone can change
or modify this Agreement. This Agreement In order to be binding by both parties, must be signed in the space provided
below, and the original copy returned to this office within days from the date shown above.
Omer
Anchor Piers LLC
Hager
A,
.0 11 ..1 :1 [ 6 1.
■WEN
MANN
0,
APR-16-2007 10:47 AM ANCHOR PIER LLC 1 P.07
PIER FOUNDATION DETAILS
FOR REPAIR ONLY TO DAMAGED FOUNDATIONS WHERE SPECIFICALLY DESIGNATED
1 EXISTING SLAB & BEAM ,
r` O LADE
W
a
$HIM & GROUT
t--••- B" , e^ x 1211
SOLID CONC. 1"MIN 1"YIN.
BLOCKS
.TACK
SPACE
1 • 04 ROD$ POUR CAP A
THE SAME
7 EACH WAY FOOTING AT
TOMB
ALL CONCRETE
TO BE 5 BACK
W/ 1.1/2" ROCK
not
212"
2 • 04 VERT.
O
W/ 02 TIES A 18"O.C.
<7
m
0
Q
r
O
F
4
STABLE
CLAY
20" DU►M.
SIDE VIEW
FRONT VIEW