HomeMy WebLinkAboutCorrespondence. C
S
C
July 16, 2004
Mr. Spencer G. Thompson
Graduate Civil Engineer
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
Re: Submittal of Erosion Control Drawing
Proposed AmeriSuites Hotel Development
1100 University Drive; College Station, Texas
Case file #04- 00500094
Dear Mr. Thompson:
-O H
A �L'! aA
As discussed in our telephone conversation of this date, transmitted via this letter are three (3) copies of
the erosion control plan drawing for the proposed AmeriSuites Hotel Project that is planned to be located
at 1100 University Drive in College Station, Texas. The transmitted drawings are labeled as Erosion
Control Plan — Sheet C -1 I and are dated July 16, 2004.
A Notice of Intent has also been prepared for the project and will be posted at the project site. Similarly,
a Storm Water Pollution Prevention Plan has been developed and will be available for review at the
project site for review. If any additional documents are required for the issuance of the clearing and
grading permit, or for issuance of the final site development permit, please do not hesitate to let us know.
To the best of our knowledge, the $600 Infrastructure Inspection Fee and the $200 Development Permit
fee have already been paid by the owner /developer, Mr. Tom Kirkland of Kyle Legends 1.
We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards,
M. Frederick Conlin, Jr. P.E.
Senior Engineer
MFC:rc
Attachments: Three (3) Copies of Drawing C -11
via: Hand Delivery
3407 Tabor Road Phone (979) 778 -2810
Bryan, Texas 77808 Fax (979) 778 -0820
� C
S
C
June 26, 2004
Ms. Molly Hitchcock, Staff Planner
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
I _� 0,4
ort -q4
4 V91 �3
Re: Final Submittal of Revised Site Plan and Landscape Drawings and Construction Drawings for
Proposed AmeriSuites Hotel Development
Incorporating Staff Review Comments No. 3 from Memorandum Dated July 21, 2004
Case file #04- 00500094:
Dear Ms. Hitchcock:
Transmitted via this letter are the site development documents requested in the above referenced
memorandum for the proposed AmeriSuites Hotel Project that is planned to be located at 1100 University
Drive in College Station, Texas. More specifically, the documents being submitted for review as
specified in your Memorandum dated April 16, 2004 can be described as follows:
• two (2) copies of the revised site plan;
• one (1) copy of the landscape plan; and
• ten sets [six (6) sets for City and four (4) sets for owner, contractor, architect and
engineer] of the construction plans with the revised site and landscape plans.
A listing of the construction drawings is presented in the accompanying Table 1.
f S D I ment Construction Dra%vin s for AmeriSuites Hotel
Table 1. Ustm
SHEET
NO.
T o rte eve o
DRAWING
TITLE
REVISON
NO.
DATE
C-1
_...�.__
C -2
C -3
Gener No tes
Site Plan
Di mension Co ntrol w. r ,_ ...._ ,.
Grading and Drainage Y _m
Utilities (WL SS. an Nat. Gas) _ ^ y
Paving an Drainage Details
Pavin an d Drainage De tails
Paving and Draina De _
P _
Water and W aste Water Details
Miscella D e t ails __-_�_
Erosion C P
12" WL Plan and Profile -
8" WL Pl an an d Profile
Sanitan_Sewer Plan and Profile
_._,u 1
1 W yq
i
1
()
1
1
�_ _ e
1
1
1
_ 1
07/02/01 -.-
07/02/04
--
07/02/0
07/02/04
07/02/0
07/02/04 _.-
06/0 4/04
07/02/04 _
C-4
C -5
-6
_C
C -7
C -8
07/02/04
0702/04
07/1 > /Od
07/02/04
07/02 04
07/C)7/04
C -9
C - 10
C -11
C -12
C -13
C -14
3407 Tabor Road Phone (979) 778 -2810
Bryan, Texas 77808 Fax (979) 778 -0820
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
Second Submittal of Site Plan and Landscape Plan and Submittal of Construction Plans Based Upon Staff
Review Comments No. 1
Proposed AmeriSuites Hotel; College Station, Texas
Page 2
The submitted construction plans plan have been revised to address the comments ( "Staff Review
Comments No. 3) of the City of College Station staff as outlined in the previously referenced
Memorandum with the exception of the sanitary sewer line at the rear of the project site. The sanitary
sewer line will be modified in accordance with the City's directive and will be submitted at a later date
per our conversations with the engineering staff
We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards,
M. Frederick Conlin, Jr. P.E., JD
Senior Engineer
MFC:rc
Attachments: (Listed in Body of Letter)
via: Hand Delivery
cc: Kyle Legends I, LP
10505 Grant Road Suite 200
Dallas, TX 75231
Attention: Mr. Tom Kirkland
Without Attachments (will be delivered as soon as stamped by City)
via: U. S. Mail
Arkitex Studio
511 University Drive, Suite 201
College Station, TX 77840
Attention: Mr. Mike Record, AIA
Without Attachments (will be delivered as soon as stamped by City)
via: Hand Delivery
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
C
S
Consultants, hic
C
1 n '
July 2, 2004 lJ�
Ms. Bridgette George, Assistant Development Manager or
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
Re: Third Submittal of Revised Site Plan and Landscape Drawings and Construction Drawings for
Proposed AmeriSuites Hotel Development
Incorporating Staff Review Comments No. 2 from Memorandum Dated June 21, 2004
Case file #04- 00500094:
Dear Ms. George:
Transmitted via this letter is a set of site development documents for the AmeriSuites Hotel Project that is
planned to be located at 1100 University Drive in College Station, Texas. The documents are being
submitted for review as specified in your Memorandum dated April 21, 2004.
More specifically, the following documents are transmitted:
• one (1) set of revised construction plans;
• one (1) copy of the revised site plan (attached to the construction plans); and
• three (3) copies of the TxDOT Driveway Permit request.
The submitted documents site plan and landscape plan have been revised to address the comments of the
City of College Station staff as outlined in the previously referenced Memorandum. The staff comments
were designated as "Staff Review Comments No. 2" and are summarized in Table 1 along with a
description of how the comments were integrated into the previously submitted plans. There were no
changes requested for the previously submitted landscape plan and therefore, no "new revised" landscape
plan is submitted.
The presently submitted construction drawings also reflect the changes discussed for the site plan and the
landscape plan.
The blanket easement for the project site that had been previously requested by the City of College
Station for the project site is being prepared directly by the developer, Mr. Tom Kirkland, and will be
submitted separately.
In addition, the previously referenced Memorandum cited a $600 Infrastructure Inspection Fee that should
be paid for the project. Mr. Kirkland is submitting that fee directly to the City. An application for a
Development Permit for the project, along with a check for the required Development Permit fee of $200,
have already been submitted.
3407 Tabor Road Phone (979) 778 -2810
Bryan, Texas 77808 Fax (979) 778 -0820
Re- submittal of Revised Site and Landscape Plans and Submittal of Construction Drawings
Submittal No. 3 Based Upon Staff Review comments No. 2
Proposed AmeriSuites Hotel; College Station, Texas
Page 2
We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards,
m.
M. Frederick Conlin, Jr. P.E., JD
Senior Engineer
MFC:am
Attachments:
One (1) Set of Construction Drawings (drawing numbers C -1 through C -14)
Site Plan (Sheet SP -1)
TxDOT Permit Driveway Permit Application (3 copies)
via: Hand Delivery
cc: Kyle Legends I, LP
10505 Grant Road Suite 200
Dallas, Texas 77
Attention: Mr. Tom Kirkland
With Attachments
via: U.S. Mail
The Architex Studio, Inc.
511 University Drive East, Suite 201
College Station, Texas 77840
Attention: Mr. Mike Record, AIA
Without Attachments
via: Hand Delivery
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
Third Submittal of Construction Plans and Site Plan Based Upon Staff Review Comments No. 2
AmeriSuites Hotel; College Station, Texas
Page 3
Table 1. Summary of COCS Staff Review Comments No. 2 and Adjustments to Drawings and Report to Incorporate Comments
COMMENT
NUMBERT
ORIGINAL
COMMENT
DESCRIPTION OF CHANGE TO DRAWING TO INCORPORATE
COMMENT
PLANNING
1 1 No Comments
ENGINEERING
I
TxDOT driveway permit required. What are your plans
for the street light in the proposed driveway?
Three (3) signed copies are included in the present submittal.
2
---- ------
1 do not show that a $600 Infrastructure Inspection Fee
to cover inspection of proposed public water and/or
sewer has been paid.
The owner/developer, Mr. Tom Kirkland, is mailing the check for the
Infrastructure Inspection Fee directly to the City of College Station.
3
Retaining wall in easement is not permitted. This
includes the retaining all in the sewer easement and the
one shown in the waterline easement.
The existing sanitary sewer line is being moved back from the center of the
easement (see Comment No. 4) and should allow enough room for a retaining
wall to be constructed within a limited portion of the easement without being
above the reconstructed sewer line. Therefore, we are requested permission for
a limited encroachment of the existing easement.
4
The existing sewer line at the rear of the property is
VCP. The plans show additional fill and parking being
placed on top of this line. This would not be allowed
due to the nature of the pipe material. You may wish to
consider replacing the sewer line.
--- ------- --- --- -----
The existing 8-inch diameter VCP SS line will be replaced with an 8-inch PVC
SS line that will include two proposed manholes to adjust the re-alignment of
the reconstructed line away from the stream. See Sheet C -14 for plan and
profile of proposed re-routed SS line.
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
Second Submittal of Site Plan and Landscape Plan and Submittal of Construction Plans Based Upon Staff Review Comments No. I
Proposed AmeriSuites Hotel; College Station, Texas
Page 4
Table I (Continued). Summary of COCS Staff Review Comments No. 2 and Adjustments to Drawings to Incorporate Comments
COMMENT
ORIGINAL
DESCRIPTION OF CHANGE TO DRAWING TO INCORPORATE
F
NUMBER I
COMMENT
COMMENT
ENGINEERING (Continued)
LL 5
One option for the sewer line/ retaining wall conflict is
Agreed. See response to Comment No. 4.
to reroute the line if it is going to be replaced anyway.
This may require a manhole or two.
6
The fire line if it is public is required to be in a utility
Agreed. A meter/backflow preventer vault has been added. See sheets C-5 and
easement. If this is problematic on this site you may
C-13.
want to consider placing vault and backflow preventer
outside the building. The line will be private after the
backflow preventer and does not require a public
utility easement.
7
The following comments are regarding the public
See response to Comment No. 6.
waterline. Some comments refer to the line up to the
property. If you choose to install a backflow preventer
outside the building the vault and meter need to be in
an easement. The remaining fire line to the building
does not need to be in an easement.
8
Please make reference in construction notes that all
Done. See sheet C -1 — General Construction Notes — Note I.B.
construction to be done per Unified BCS manual,
details, and specifications.
9
Sheet C -11. Minimum PUE for waterline is 15 -ft. El
PUE width changed to 15-ft. See Sheet C -13 (former sheet C - 11).
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
Second Submittal of Site Plan and Landscape Plan and Submittal of Construction Plans Based Upon Staff Review Comments No. 1
Proposed AmeriSuites Hotel; College Station, Texas
Page 5
Table I (Continued). Summary of COCS Staff Review Comments No. 1 and Adjustments to Drawings to Incorporate Comments
COMMENT
NUMBER
ORIGINAL
COMMENT
DESCRIPTION OF CHANGE TO DRAWING TO INCORPORATE
COMMENT
ENGINEERING (Continued)
10
Sheet C -12. Blow -off at end of line not needed. Fire
Blow -off valve has been eliminated. See sheet C -12.
hydran is sufficient.
-
11
Sheet C -12. Center joint of waterline over existing 12-
Note added to sheet C -12 about centering joint at crossing.
in sewer.
12
Sheet C -12. Blow -off at Sta 6 +65 not needed.
Blow -off valve eliminated as suggested.
Upgradient hydrant is sufficient.
13
_-- __.. -.
Sheet C -12. Casing should be 18 -in.
Casing size changed to 18 -in. as specified.
14
Please add note to plans concerning the following item
Note added to both sheet C -12 and to general notes on sheet C -1.
on page 6 of the BCSDG. All bends and fittings
producing a change in alignment greater than the
deflection allowance of this manual shall be restrained
to the pipe and blocked to undisturbed soil. In
addition, the pipe itself shall be restrained for a
minimum of 2 joints on either side of the alignment
change
15
From the water demands you have supplied from your
report, the proposed hotel will receive a 2 -in domestic
The plumbing engineers (Brazos Valley Engineering, Inc.) has stated that a 2-
in. domestic water meter will be sufficient for their planned 2 '/z inch line.
meter. Is this your intent?
R C
S
C
August 25, 2004
Mr. Spencer G. Thompson, Jr.
Graduate Civil Engineer
City of College Station
Development Services
1 101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
Re: Submittal of Revised Sewer Line Construction Drawings for
Proposed AmeriSuites Hotel Development
Case file #04- 00500094:
Dear Mr. Thompson:
bu -gy
Transmitted via this letter is the revised Sheet C -14 showing the sanitary sewer line plan and profile for
the proposed AmeriSuites Hotel Project that is planned to be located at 1100 University Drive in College
Station, Texas. The subject sanitary sewer is located in the rear of the property. The attached drawing is
being submitted for your review and approval.
The attached Sheet C -14 is entitled SS Plan & Profile and is listed as being Revision No. 2 of the original
sheet with a revision date of August 25, 2004. The drawing is being submitted to incorporate the increase
in sewer line size from 8 -inch diameter as shown on the previously submitted construction plans to 12-
inch diameter as requested by the City of College Station.
As can be seen from a review of the attached drawing, we have also changed the slopes of the proposed
sewer line as compared to both the existing line and the line shown on the previously submitted
construction plans. As discussed in earlier conversations concerning the line sizes, the initial slope of the
proposed larger 12 -inch diameter sanitary sewer has been flattened to a slope of approximately 0.34
percent. As you might recall, the slope for the existing 8 -inch diameter line was approximately 2.98
percent. The larger diameter line with the flatter slope will still have approximately the same flow
capacity as the previously existing smaller line with the steeper slope. The flatter slope for the proposed
line will permit shallower excavation depths for installation of the proposed line. However, it should be
noted that the slope of the final or end segment of the proposed line had to increased to the maximum
permissible slope of 3.1 percent for a 12 -inch diameter line in order to maintain the 6 feet minimum cover
for sanitary sewer lines as required by the B /CS Unified Design Guideline Manual — Water and Sewer,
Effective February, 2004 (page 6). Even with the steeper end slope there will be a drop of approximately
5 feet at the existing connecting downstream manhole. Therefore, an external drop structure will have to
be constructed for the existing downstream manhole as part of the connection to the existing line.
3407 Tabor Road Phone (979) 778 -2810
Bryan, Texas 77808 Fax (979) 778 -0820
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
Submittal of Revised Sanitary Sewer Line Drawing
Proposed AmeriSuites Hotel: College Station. Texas
Page 2
We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards,
M. Frederick Conlin, Jr. P.E., JD
Senior Engineer
MFC:rc
Attachment: Sheet C -14 (Revision 1)
via: Hand Delivery
cc: Kyle Legends 1, LP
10505 Grant Road Suite 200
Dallas, TX 75231
Attention: Mr. Tom Kirkland
With Attachment
via: U. S. Mail
Arkitex Studio
511 University Drive, Suite 201
College Station, TX 77840
Attention: Mr. Mike Record, AIA
With Attachment
via: Hand Delivery
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
C
S
C
September 3, 2004
Mr. Spencer G. Thompson, Jr.
Graduate Civil Engineer
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
Re: Submittal of Final Resived Sewer Line Construction Drawing for
Proposed AmeriSuites Hotel Development
Case file #04- 00500094:
Dear Mr. Thompson:
SS
Transmitted via this letter are ten (10) copies of the revised Sheet C -14 showing the sanitary sewer line
plan and profile for the proposed AmeriSuites Hotel Project that is under construction at 1100 University
Drive in College Station, Texas. The subject sanitary sewer is located in the rear of the property. The
attached drawings are submitted for your final review and approval. We understand that the City of
College Station (City) requires six (6) copies of the drawing, and we have therefore submitted ten (10)
drawings so that we may have four (4) returned to us.
The attached Sheet C -14 is entitled SS Plan & Profile and is listed as being Revision No. 2 of the original
sheet with a revision date of August 25, 2004. The drawing is being submitted to incorporate the increase
in sewer line size from the 8 -inch diameter line shown on the previously submitted construction plans to
the larger 12 -inch diameter line as requested by the City of College Station.
We sincerely appreciate your review of this submittal. Please do not hesitate to call should any questions
arise or if additional information is required.
Kindest regards,
1
M. Frederick Conlin, Jr. P.E., JD
Senior Engineer
MFC:rc
Attachments: Ten (10) Copies of Sheet C -14 (Revision 2) Dated August 25, 2004
via: Hand Delivery
cc: Kyle Legends I, LP
10505 Grant Road Suite 200
Dallas, TX 75231
Attention: Mr. Tom Kirkland
With Attachment
via: U. S. Mail
3407 Tabor Road Phone (979) 778 -2810
Bryan, Texas 77808 Fax (979) 778 -0820
The City of College Station Texaai
,
\ /
Embracing he Past Exploring the Future.
S � P S
P.O. Box 9960 • 1101 Texas Avenue 0 College Station, TX 77842 (979) 764 -3500
www.ci.college - station.tx.us p,
April 26, 2004 W ` - `�
David Scarmardo
DWS Development
111 F. M. 2818
Bryan, Texas 77805
Re: Future traffic signal and existing median opening on University Drive.
Dear David,
The purpose of this letter is to confirm the location of a possible traffic signal on
University Drive in front of the Henton - Lincoln Subdivision. As you are aware, the
Texas Department of Transportation (TxDOT) widened University Drive and installed
raised medians two years ago. At that time, staff examined existing and future traffic
signal locations. As a general rule of thumb, traffic signals should be spaced at least 1 /a
mile (1000 feet) apart. This spacing could be accommodated in this particular section of
University Drive, between Lincoln Avenue and Tarrow Street intersection. (See
attached Exhibit "A ".)
Prior to a traffic signal location being approved by the City and TxDOT, the proposed
location must satisfy a traffic signal warrant based on the Texas Manual on Uniform
Traffic Control Devices (TMUTCD). This determination would be made with a traffic
signal warrant study. In addition to determining if warrants are satisified, the study
would also address other issues that should be considered in the design.
If you have any questions or need additional information, please contact me at (979)
764 -370.
Sincerely,
Ken Fogle
Transportation Planner
cc: Natalie Ruiz, Development Manager
Troy Rother, Traffic Engineer
Home of Texas A&M University
Home of the George Bush Presidential Library and Museum
Apr 30 04 12:32p Thomas Kirkland 214 890 -1355 .1
TEKMAK Development Company Q�
7502 Greenville Avenue, Suite 500
Dallas, Texas 75231
TELEPHONE: (214) 890 -9225 FACSIMILE: (214) 890 -1355
TRANSMITTAL
TO: Natalie Ruiz and Bridgette George
FROM: Tom Kirkland
DATE: April 30, 2004
RE: AmeriSuites, College Station, Texas
FAX: 979/764.3496
------------------------------
Number ofpages including cover:
Natalie and Bridgette, I want to let you know that the TXDOT elimination of
the eastern drive is a major problem for us and the City. Right now the only left
hand protected turn along University going south is on the eastern side of the
Quality Suites and McAlisters deli. This entry drive, because it is a protected left
hand turn, is utilized currently by the McAlister's restaurant, the Quality Suites
and the condominiums behind the Quality Suites, Now with the new 91 room
AmeriSuites using this drive as its only means of egress and ingress there is a
HUGH traffic problem, not to mention the danger to the patrons of the 2 hotels
and the restaurants. Now the City wants us to allow the traffic for the Wheeler
tract, which I understand to be a future restaurant, to utilize this same driveway
and for us to allow their traffic to drive across the AmeriSuites property, through
our porte- cochere and over to their restaurant, is ludicrous to say the least. That
would be 2 hotels (172 rooms) 2 restaurants and a condominium complex All
using this single access point. We MUST have a meeting ASAP on this issue, as
I cannot believe this is the best we can do. Thanks.
Tom Kirkland
1�