Loading...
HomeMy WebLinkAboutStaff CommentsMEMORANDUM June 22, 2004 TO: Planning and Zoning Commission FROM: Carol Cotter Email: ccotter @cstx.gov SUBJECT: FINAL PLAT for CASTLEGATE SECTION 5, PHASE 2 Item: Consideration, discussion, and possible action on a Final Plat for Castlegate Subdivision Section 5, Phase 2 consisting of 45 lots on 13.507 acres located off Green's Prairie Road and Castlegate Drive. (04- 00500141) Applicant: Wallace Phillips for Greens Prairie Investors, Ltd. Staff Recommendations: Staff recommends approval of the Final Plat as submitted. Item Summary: This item is for the consideration of a Final Plat for a residential subdivision that will allow for the development of 45 single family homes. Included in the development are common areas and a greenway area that encompasses the 100 - year flood plain located along the northwest property boundary. This Final Plat is in conformance with the zoning and subdivision regulations and with the Master Preliminary Plat that was approved by the Commission on December 11, 2003. Comprehensive Plan Considerations: The Final Plat is in compliance with the Land Use Plan, which designates the area as Single Family Residential Medium Density (3 -6 DU /acre). The Final Plat is also in compliance with the modified standards approved with the rezoning, including modifications to standard street widths, sidewalks, lot dimensions, and setbacks. Sections 5 will take access from Castlegate Drive, which is designated as a minor collector on the City's Thoroughfare Plan, and Green's Prairie Road, designated as a minor arterial. This subdivision is located in the Spring Creek Sanitary Sewer Impact Fee Area 97 -01. Impact Fees will be due at the time the Final Plat is filed for record. The Current fee for this area is $349.55 per Living Unit Equivalent (LUE). Attachments: 1. Area map 2. Application 3. Copy of Plat on wall of Council Chambers STAFF REVIEW COMMENTS NO. 1 Project: CASTLEGATE SEC 5 PH 2 (FP) - 04- 00500141 ENGINEERING 1. An off -site easement will be required for sewer line S -5. 2. End water line W -7 within plat boundaries or provide off -site easement. 3. Provide detail of 16' wide valley gutter in Newark Circle, and show how it ties in to the street pavement. 4. A typical street section for Newark Circle is shown on Sheets 2 and 3. Should one of these be for Hearst Court? 5. Revise detail of 7' drainage channel and detail for 6' drainage flume to include tie to ground. 6. Add structural backfill to all utilities within 5 feet of pavement. 7. Add erosion control to detention pond outlet pipe. 8. Please consider that fences will not be allowed within the public drainage easement and how the placement between fences will affect maintenance of the drainage channel. (As discussed, you may want to relocate channel to Common Area between Lots 18 and 19.) 9. Drainage Report: Show how you got information in Table 5 by providing sample calculations. 10. Drainage Report: Provide hydrographs and HEC -1 printouts. 11. Provide water design report as required by BCS Unified Design Gudielines. Reviewed by: Carol Cotter Date: June 15, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Need easements as listed: 5 ft PUE between lost 8& 9 on 8 5 ft PUE between lots 13 & 14 on 14 5 ft PUE between lots 50 & 51 on 51 3. Developer installs street lights per city specs and design. Reviewed by: Tony Michalsky Date: 6 -10 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 MEMORANDUM June 22, 2004 TO: Planning and Zoning Commission FROM: Carol Cotter Email: ccotter @cstx.gov SUBJECT: FINAL PLAT for CASTLEGATE SECTION 5, PHASE 2 Item: Consideration, discussion, and possible action on a Final Plat for Castlegate Subdivision Section 5, Phase 2 consisting of 45 lots on 13.507 acres located off Green's Prairie Road and Castlegate Drive. (04- 00500141) Applicant: Wallace Phillips for Greens Prairie Investors, Ltd. Staff Recommendations: Staff recommends approval of the Final Plat as submitted. Item Summary: This item is for the consideration of a Final Plat for a residential subdivision that will allow for the development of 45 single family homes. Included in the development are common areas and a greenway area that encompasses the 100 - year flood plain located along the northwest property boundary. This Final Plat is in conformance with the zoning and subdivision regulations and with the Master Preliminary Plat that was approved by the Commission on December 11, 2003. Comprehensive Plan Considerations: The Final Plat is in compliance with the Land Use Plan, which designates the area as Single Family Residential Medium Density (3 -6 DU /acre). The Final Plat is also in compliance with the modified standards approved with the rezoning, including modifications to standard street widths, sidewalks, lot dimensions, and setbacks. Sections 5 will take access from Castlegate Drive, which is designated as a minor collector on the City's Thoroughfare Plan, and from Green's Prairie Road, which is designated a minor arterial. This subdivision is located in the Spring Creek Sanitary Sewer Impact Fee Area 97 -01. Impact Fees will be due at time the Final Plat is filed. Current fees for this area are $349.55 per Living Unit Equivalent (LUE). Attachments: 1. Area map 2. Application 3. Copy of Plat on wall of Council Chambers TEXCON TRANSMITTAL Date: August 11, 2004 To: Bridgette George Assistant Development Manager City of College Station From: Joe Schultz, P.E. \�- Texcon General ontractors Phone: (979) 764 -7743 Subject: Revised Construction Plans, etc. Castlegate, Section 5, Phase 2 College Station, Texas Remarks: Attached are 8 sets of the revised construction plans marked "Issued for Construction," 2 copies of the revised Drainage Report, 2 copies of the Engineer's Cost Estimate, 2 copies of the Sewer Report, and 2 copies of the Fire Flow Analysis. Also included is our response to Staff Comments No. 1. Please return extra sets of stamped plans to our office. Let me know if you need anything else or have any questions. 1 Response to Staff Review Comments No. 1 Castlegate, Section 5, Phase 2 Engineering: 1. The sewer line construction can be completed Linder the blanket utility easement. 2. The waterline construction can be completed under the blanket utility easement. 3. The detail of the valley gutter is on Sheet 2. 4. A typical street section of Hearst Court is shown on Sheet 3. 5. These details have been revised. 6. All utilities within 5 feet of pavement are shown to be structural backfill. 7. Rock riprap has been added to the detention pond outlet pipe. 8. The channel has been relocated. 9. Table 5 information. Item A — Pre - development peak discharge values from HEC -1 model — Appendix E. Item B — HEC -1 model values for post - development conditions without a detention pond. The HEC -1 output data for this model is not included in the drainage report. Item C — Post - development peak discharge into detention pond. See runoff summary — Appendix F Item D — Peak discharge out of detention pond. See runoff summary — Appendix F Item E — Peak discharge from Combined Hydrographs at Discharge Point No. 2. See runoff summary — Appendix F TABLE 5 — Pre- & Post - Development Peak Discharge Comparison — Detention Pond Design Item Location Q5 Q10 Q25 Q50 Q100 (cfs) (cfs) (cfs) (cfs) (cfs) Pre - Development A Total @ Discharge Pt. No. 2 13 16 21 25 28 Post - Development without Pond B Total @ Discharge Pt. No. 2 23 24 34 39 44 Post - Development with Pond C Into Pond 20 24 30 34 38 D Out of Pond 13 15 18 20 23 E Total @ Discharge Pt. No. 2 13 15 19 21 24 10. The HEC -1 printouts and the tabulated hydrographs are included in the revised drainage report. 11. Fireflow analysis of water system provided. Copies of the Sewer Design Report and Engineer's Cost Estimate are also included. CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 15, 2004 TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 690.1041 FROM: Bridgette George, Assistant Development Manager SUBJECT: CASTLEGATE SEC 5 PH 2 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, June 21, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, July 1, 2004, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised Final Plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter at 764.3570. Attachments: Staff review comments cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759 ✓ Case file #04- 00500141 Home of Texas A&M University