Loading...
HomeMy WebLinkAboutCertificate of Occupancy Certificate of Occupancy Project: df5 P4.( ❑ Site /Landscaping inspection approved (date) 0 q ❑ Public Works 4 Engineering approved (date) 5cm, - no 5 Cn. tr 17 o Public Utilities o Electrical (date) ❑ Water (backflow devices) Rce,C 'd : 61 /, 51, 7 (date ) ❑ Parkland dedication (if applicable) ❑ $ (date) ❑ Fire (date) 54a 7,/02_ 5 o Legal (easements) (date) o Certificate of Occupancy issued (date) Conditions of C.O.: Li - c-(313,e_ (9k-? PIP •-' INSPECTION CHECKLIST FOR CERTIFICATE OF OCCUPANCY Multi - Family and Commercial Projects Planning & Development Engineering Items (Exterior) • All pavement must be in — especially around perimeter. • All curbing must be installed, including edges of future phases. • All parking spaces must be striped, including handicap spaces. • Spot check dimensions of spaces and circulation aisles. (9'x18' with 2' overhang or 9'x 20' without overhang; 2 -way circulation aisles must be 23' wide; 1--way can be 20'wide) • All islands must be curbed raised, and either planted or bricked (decorative pavers, stamped colored concrete O.K.) and located as shown on approved plans. • The Dumpster screening must be installed as shown on approved plans. • The landscaping must be installed and appear to be similar to approved plan. • The site must be clean and free of construction debris, equipment, job shacks, sand, dirt, etc. • The development, construction and finance signs must be removed. • The adjacent lots disturbed during construction must be returned to original conditions (graded, seeded or sodded, debris removed) . • Handicap ramps must be installed. • Handicap signs must be installed. • Fire lanes must be painted in locations shown on approved plan. • Detention with groundcover must be installed and located as shown on approved plan. Look to see if water can get into and out of the pond- per the approved plans. • If grass is the ground cover to be used for general landscape and detention requirements, the sod must be installed or there must be evidence that the area has been seeded or hydromulched. IF ANY OF THE ITEMS HAVE NOT BEEN COMPLETED, PLEASE CONTACT THE ASST. DEVELOPMENT MANAGER IN CHARGE OF THE PROJECT AT 764.3570