HomeMy WebLinkAboutCertificate of Occupancy Certificate of Occupancy
Project: df5
P4.(
❑ Site /Landscaping inspection approved (date) 0 q
❑ Public Works
4 Engineering approved (date)
5cm, - no 5 Cn. tr 17
o Public Utilities
o Electrical (date)
❑ Water (backflow devices) Rce,C 'd : 61 /, 51, 7 (date )
❑ Parkland dedication (if applicable)
❑ $ (date)
❑ Fire (date) 54a 7,/02_ 5
o Legal (easements) (date)
o Certificate of Occupancy issued (date)
Conditions of C.O.:
Li - c-(313,e_ (9k-?
PIP •-'
INSPECTION CHECKLIST
FOR CERTIFICATE OF OCCUPANCY
Multi - Family and Commercial Projects
Planning & Development Engineering Items (Exterior)
• All pavement must be in — especially around perimeter.
• All curbing must be installed, including edges of future phases.
• All parking spaces must be striped, including handicap spaces.
• Spot check dimensions of spaces and circulation aisles. (9'x18' with 2'
overhang or 9'x 20' without overhang; 2 -way circulation aisles must be 23'
wide; 1--way can be 20'wide)
• All islands must be curbed raised, and either planted or bricked (decorative
pavers, stamped colored concrete O.K.) and located as shown on approved
plans.
• The Dumpster screening must be installed as shown on approved plans.
• The landscaping must be installed and appear to be similar to approved plan.
• The site must be clean and free of construction debris, equipment, job shacks,
sand, dirt, etc.
• The development, construction and finance signs must be removed.
• The adjacent lots disturbed during construction must be returned to original
conditions (graded, seeded or sodded, debris removed) .
• Handicap ramps must be installed.
• Handicap signs must be installed.
• Fire lanes must be painted in locations shown on approved plan.
• Detention with groundcover must be installed and located as shown on
approved plan. Look to see if water can get into and out of the pond- per the
approved plans.
• If grass is the ground cover to be used for general landscape and detention
requirements, the sod must be installed or there must be evidence that the
area has been seeded or hydromulched.
IF ANY OF THE ITEMS HAVE NOT BEEN COMPLETED, PLEASE CONTACT THE
ASST. DEVELOPMENT MANAGER IN CHARGE OF THE PROJECT AT 764.3570