HomeMy WebLinkAboutDevelopment Permit DEVELOPMENT PERMIT
I PERMIT NO. 03 -33
Project: WESTFIELD PH 2B V
COLLEGE STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
WESTFIELD 2B GRAHAM AT MEADOW VIEW DR
DRAINAGE BASIN:
Lick Creek
DATE OF ISSUE: 5/21/03 VALID FOR 6 MONTHS
OWNER: CONTRACTOR:
MAIN STREET HOMES
,
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
TCEQ PHASE II REGULATIONS IN EFFECT. PLEASE ENSURE COMPLIANCE.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State
and Federal requirements. The Owner and /or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and /or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and /or Contractor shall be responsible for any damage to
adjacent properties, city streets or infrastructure due to heavy machinery and /or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
1
All■ - .5 ) a t I CI)
Ai inistrato esentative Date
Owner /Agent/ • ntractor Date