Loading...
HomeMy WebLinkAboutSP2008-500234Elevation Area: 1643 SF 100% m Metal SW 6096: 5 SF 0.30% 0 - Metal SW 6629: 7 SF 0.43% METAL CAP'' 1.4 Metal SW 6115: 4 SF 0.24% �, Qr^ �; p o Split Face CMU: 58 SF 3.53% 00 �N Q 0 Face Brick: 470 SF 28.61 % :....:........ .. .. PAINTED STUCCO (SW . . ... o [� a�•� Stucco SW 6096: 216 SF 13.15% , 6096 JUTE BROWN) � • ' . � • . ' . .� .. ... ::. .• :.. ... .. �. . ; Stucco SW 6115: 184 SF 11.20% ...: :. PAINTED STUCCO sw SMOOTH METAL (B up 'rs Door & Window Area: 699 SF 42.54% - _ ', . : ' ... :..• :.:... :: 6115 TOTALLY TAN) JUTE BROSW WN) ) t y y y y y y y y i y y y y y y 1 • . ': �.. ,.. _ . III 1i� + � � � 1 � + r SMOOTH METAL CAP (SW 6629 O U (� 00 + r •• .. JALAPENO) SMOOTH METAL O CANVAS AWNING (SW 6207 RETREAT) .: .: CANVAS AWNING (SW 6207 RETREAT) �/� .. .. CANVAS AWNING (SW 6207 RETREAT) yr �Jvv oii� TOTALLY TAN) SINGLE BAND OF C1 I,- I - A �: I y y, 4 y, y "....R C.J. C.J. / / FACE BRICK z / DOUBLE BAND � o :. OF SPLIT FACE �� / / FACE BRICK ® W m ti ti ti� / i� y. ..... it •.' r r r —IN / r N / SINGLE BAND OF / / SPLIT FACE C.M.U. ' 4 Q d• d O V O d • d C Q 'p' .. V°'• d Q V 46 FACE BRICK FRONT ELEVATION & CONCEPT PLAN ' SCALE: 1/4" =1'-0" 11 00 0 O Elevation Area: 418 SF 100% Metal SW 6096: 6 SF 1.44% Elevation Area: 418 SF 100% Metal SW 6629: 3 SF 0.72% Metal SW 6096: 6 SF 1.44% Metal SW 6115: 1 SF 0.24% Metal SW 6629: 3 SF 0.72% y y Split Face CMU: 38 SF 9.09/o o Metal SW 6115: 1 SF 0.24% ., LINE OF R BEroND Face Brick: 263 SF 62.92% Split Face CMU: 38 SF 9.09% E °R Y Face Brick: 263 SF 62.92% • Door &Window Area: 107 SF 25.60% .: . Door & Window Area: 107 SF 25.60% o CANVAS L AWNING CANVAS t y (SW 6207 Tit AWNINGyRETREAT) (SW 6207n06 � RETREAT) + �N 4 L///-j N U � O M O 00 �N Q� `- o 95'-0" c� U 7 30'-10" 30'-0" 7-1" 59'-2" 3'-0" 12'-3" 2' 8" 2'-1" 2'-8" 12'-3" 3' 0" EMER. EXIT EMER. EXIT DISCHARGE LIGHT Qp..I DISCHARGE LIGHT �.I- \ \ �,✓ t cv " 2 V-4" '-6" S-1 TYR U z THIS AREA OF FOUNDATION LEFT THIS AREA OF FOUNDATION LEFT THIS AREA OF FOUNDATION LEFT OPEN FOR FUTURE TENATE OPEN FOR FUTURE TENATE OPEN FOR FUTURE TENATE FINISH -OUT FINISH -OUT FINISH -OUT,' st� V: 1 �N �fV rn N N r V-4" a 1-4" \ AN / \ NN / \ N� / O NImo/ � co DR1/ w co �_I,/ v Y l DECORATIVE LGHTS SET TO 23'-0" TMER 30'-10" 3'-3" 26'-8" 30'-0" 3'-3" 3'-3" 26'-8" 30'-0" 11" 3'-0" 2'-1 3'-0" 3' " 3'-4" 3'-0" I 6'4" 6' 4. I I 0 M� O M.. 95'-0" M FOUNDATION PLAN SCALE: 1/4" =1'-0" 01 FOU � O GENERAL NOTES FOR CONCRETE I TIES (REF. SCHED.) 1 ) ALL CONCRETE TO BE 5 SACK MIX, HAVING A 28 DAY Q w COMPRESSIVE STRENGTH OF 3000 P.S.I. [--+ I VERTICAL STEEL 2) MAXIMUM AGGREGATE SIZE IS 1 J Z L_ 3 USE 60 KSI (MIN.) FOR #4 REBAR AND SMALLER MIN. I I (REF. SCHED.) ) 4) USE 60 KSI FOR #5 REBAR AND LARGER MIN. H 0 I I 5) USE TYPE "I" PORTLAND CEMENT _ 6) POUR ENTIRE SLAB AS A CONTINUOUS POUR, UNLESS o APPROVED BY ENGINEER r--, W 7) DO NO SCALE THIS DRAWING, USE DIMENSIONS W I SHOWN FOR ALL LOCATIONS I I 8) ALL REINFORCING STEEL AND CONCRETE PLACEMENT SHOULD BE INSPECTED BY PROJECT ENGINEER AND WILL BE SUBJECT TO HIS APPROVAL O 36 BELL BOTTOM I I -MUST BE CLEAN-CUT 9) �" x 1 O" LONG ANCHOR BOLTS SHALL BE PLACED ANAEXTERIOR WALL u I I AND FREE OF LOOSE MATERIAL ON 4 FT. CENTERS AROUND ALL SECTIONS OF TIMBER STUD CONSTRUCTION, WITHIN L J OR AT 6" FROM EACH CORNER AND NO BOLTS I I IN DOORWAYS. I 10) ALL GRADE BEAM STIRRUPS ARE TO BE 3" CLEAR T-0" BOT., 2" CLEAR SIDES AND 11" CLEAR TOP. GENERAL NOTES PIER DETAIL SCALE: 3/8" = F-0" 02 1) THE SITE SHOULD BE STRIPPED OF TOPSOIL AND MISCELLANEOUS FILL MATERIALS AND DEBRIS (IF ANY). THE SUBGRADE SHOULD SIDEWALK RE: CIVIL BE PROFROLLED TO EVIDENCE ANY SOFT SPOTS WHICH SHOULD BE CD 00 00 5 2' x 1 2" BRICK OR 1 2" x 1 2" EXCAVATED TO FIRM THE SOIL. o 6 0 0 0 c� o In � �r 1/2" EXP. JT. W/ SEALAN .-� I N CD N tV STUCCO LEDGE. SEE PLAN THE SUBGRADE SHOULD BE SCARIFIED TO A DEPTH OF 6 INCHES ILA tA N FOR LOCATIONS 12" - #4 DOWELS @ 18" O.C. 2) o 0 0 0 0 AND MOISTURE CONDITIONED TO ABOVE OPTIMUM. THE SOIL PROVIDE 12" MIN 18" MAX PROVIDE 6" MIN 12" MAX SHOULD BE COMPACTED TO A MINIMUM OF 95 PERCENT OF OVERLAP OF VB FOR THE MAXIMUM DRY DENSITY AS DETERMINED BY THE STANDARD OVERLAP OF VB FOR PROCTOR DENSITY TEST (ASTM D 698). %FUTURE FLOOR SLAB BY __ ___ °-_-- ---_ _ _ FUTURE FLOOR SLAB BY d --- � - ° -- °----%:-- - -- -w > ° � � � •; OTHERS. NEATLY TUCK IN. w > ° OTHERS a U O 3) SELECT FILL USED TO ELEVATE THE GRADE SHOULD BE COMPOSED U .:.::. ............ ° a°i ° 1 ° °°i a ° °i i OF CLEAN SANDY CLAY WITH A LIQUID LIMIT LESS THAN 40 AND Q 12"-#5 DOWELS @ 18" O.C. - ° 12 -#5 DOWELS @ 18 O.C. A PLASTICITY INDEX (PI) BETWEEN 7 AND 20. Z Q E I I i a I° i I �� Z SELECT FILL _ - �; a 9 SELECT FILL 4) THE FILL SHOULD BE PLACED IN 8 INCH LOOSE LIFTS AND W� p U COMPACTED TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM p p c) --' .i ° ° ° ' ° #4 STIRRUP 24" O.C. DRY DENSITY AS DETERMINED BY THE STANDARD PROCTOR DENSITY p #4 STIRRUP @ 24 O.C. III! I x U I TEST (ASTM D 698). THE MOISTURE CONTENT SHOULD BE WET Q ►-a 4 OF OPTIMUM. 4p 4- CONT. #6T&B 4- CONT. #6T&B �1 I I p ° r ° ; ° 1 ° I A BEDDING LAYER OF LEVELING SAND, TWO -INCHES IN THICKNESS, SHOULD BE ti ti . •; CONT. 6 MIL POLYETHELENE �_____ •% ' CONT. 6 MIL POLYETHELENE PLANNED BENEATH THE FLOOR SLAB. A VAPOR BARRIER CONSISTING OF 6 MILL ti ti o ° VAPOR BARRIER a - VAPOR BARRIER PLASTIC SHEETING SHOULD BE PLACED OVER THE SAND CUSHION TO PREVENT �.-.------------- '---------- WATER MIGRATION THROUGH THE CONCRETE SLAB. THE EXCAVATIONS FOR THE GRADE BEAMS SHOULD BE CLEAN AND FREE OF ANY LOOSE MATERIALS PRIOR TO CONCRETE PLACEMENT. aj ui w o PER PLAN PER PLAN = M 0 ¢ N cn O / BEAM DETAIL SCALE: 3 4" = F-0" 03 BEAM DETAIL SCALE: 3/4" =1'-0" 04 NOTES No Scale 05 AREA SUMMARY TOTAL SLAB 1,973 SF TOTAL LEASE SPACE AREA 1,735 SF PERIMETER 254'-1"