Loading...
HomeMy WebLinkAboutCorrespondenceGLAVAN FEHER ARCHITECTS INC. February 20, 2003 The City of College Station Bridgette George, Development Services 1 101 Texas Avenue College Station, TX 77840 2 M I R A N O V A P L A C E 797.764.3570 phone 797.764.3496 fax COLUMBUS, OHIO 43215 RE: Chipotle Mexican Grill 815 University Drive College Station, TX 77840 T E L 6 1 4 2 2 8. 3 4 0 0 F A X 6 1 4. 2 2 8. 3 3 3 7 Ms. George, This letter is in response to the City of College Station Staff Review Comments received February 17, 2003. Plannina: W W W. G L A V A N C O M U S A 1. Please remove the language regarding parking spaces "required." The number of parking spaces required will be determined by the Project Review Committee. The language regarding "required" parking spaces has been removed from the Site Development Plan. 2. Please provide curbing between the sidewalk and the parking located closest to the building. The proposed sidewalk has a built in curb with 6 -inch reveal along the parking area located closest to the building. Please refer to "Brushed Concrete Walk" detail on Site Development Plan. 3. Please curb the entire dumpster area. Curbing has been added around the entire dumpster area. Please note, a 4 foot wide sidewalk has been added to serve the access door along the east side of the dumpster enclosure. Please see Site Development Plan for location. 4. 1 am providing you with our standard paving /curb details. Any other proposal will have to be approved by the City Engineer. We are proposing an 18 -inch straight concrete curb for the site to be reviewed and approved by the City Engineer. 5. Please be aware that there must be a fire hydrant within 300 feet of the furthest point of the structure. If the existing fire hydrant meets this requirement, please provide the exact distance and location. I do not find a fire hydrant in the direction that you call out. From available information from the City of College Station Utility Department and Fire Department, the exact distance and location of an existing fire hydrant is 160' West of the centerline to the proposed western drive. The hydrant location is noted on the revised site development plan. 6. Please provide the sizes of existing utilities and whether they are public or private lines. Easements are required for all public utilities and meters that are not located within the public right - of -way. From available information, the sizes of existing utilities are provided and noted public or private on the Site Development Plan. If it is determined that any easements are required, they will be applied for prior to construction. 7. Please locate the irrigation meter. Irrigation will be required for all landscaped areas and an irrigation plan must be approved by our department prior to C.O. The location of the irrigation meter is called out on the irrigation plan. All landscaped areas are irrigated per city and state codes. 8. Specify whether the wood fence, you show as existing, will remain. A southern portion of the fence (Approximately 45') will be removed so that termination of the fence is parallel with the first parking stall of the proposed site. The area being removed is noted on the site development plan. 9. Does the proposed sidewalk that you are showing line up with the existing sidewalks on adjacent properties? Will the existing sidewalk in front of the property remain concrete or will it be turf or ground cover? The proposed sidewalk lines up with the existing sidewalk along University Drive, please see Site Development Plan. The existing sidewalk along University Drive will be removed and turf is proposed in this area. Please refer to Site Development Plan and Landscaping Plan for locations. 10. The existing Northgate Design Guidelines strongly encourage an eight -foot wide sidewalk (you could extend the proposed sidewalk toward the street). The guidelines also called for stamped dies concrete sidewalks (resembles brick pavers). The Public Works department can provide the specs for the stamped dies concrete. This may or may not be required by the Project Review Committee. Staff will recommend for it. An 8 -foot wide sidewalk has been provided along University Drive. This sidewalk has been specified, as a stamp died concrete sidewalk. Please refer to Site Development Plan for locations. 11. Please be aware that internally lit signs are discouraged in the Northgate area. Indirect lighting is preferred. The Project Review Committee has discretion over signs. Please note that all signs except the marquee sign over the main entrance has been changed to indirect lighting. 12. Please screen the parking along the southern property line from the right -of -way. This can be accomplished using shrubs or a berm along the length of the last parking space on that row. Please note that 6 shrubs have been added along the length of the last parking space adjacent to the southern property line for screening. 13. 1 am providing you with a list of plants that grow well in College Station area. You may wish to use these species on your site. The street trees must come from this list of canopy trees. Please note the changes in species of plants used to correspond with the list provided. Changes noted on Landscape Plan enclosed. 14. Street trees in planter boxes located every 30 feet along University Drive is strongly recommended to meet your streetscape requirement. This can be accomplished by moving some of your proposed trees to the front of the building on the site plan. This may or may not be required by the Project Review Committee. The proposed landscape plan includes excess landscape points to enhance the appearance of the site. Critical sight lines were considered when designing the landscaping and we would appreciate an opportunity to discuss the planter boxes with the Project Review Committee before making such revisions. 15. Please be sure that the parking spaces on either side of the dumpster do not block the 12 foot required opening for the dumpster screening gates (you may wish to pull the parking slightly forward on the site) The parking space layout next to the dumpster has been adjusted to prevent blocking when the dumpster screening gates open. Please refer to Site Development Plan. 16. The gate for the enclosure is only 10 feet wide. It needs to be 12 feet wide by Pete Caler, Sanitation. Please note the revised dumpster enclosure on sheet A006 with a 12' opening. 17. Please remove the reference to the West directional on University Drive. Correct address is 815 University Drive. Reference to the "West" directional on University Drive has been deleted; please refer to Site Development Plan. Engineering: 1. The proposed driveway throat length meets City ordinance requirements (55 -ft). However, if needed, the Project Engineer can adjust this requirement to accommodate a more efficient site layout. You may adjust the parking spaces along the west such that there is no longer any conflict with the dumpster pad; 5 -ft adjustment should be sufficient. Parking spaces along the west side of the site next to the dumpster pad have been shifted to the south to avoid conflict when the dumpster screening gates open. Please refer to the Site Development Plan. 2. You will need a TxDOT permit for construction in the ROW. There is no fee for this. It requires a form to be filled out, signature of the landowner, and related construction drawings. Please contact this department if you need this form faxed to you. We have received a TxDOT Right -of -Way Permit application for construction in the Right -of -Way of University Drive and it will be submitted for approval prior to the start of construction. Electrical: 1. Developer installs conduit per city specs and design. All conduit installation is to be per city specifications and design. Change noted on sheet E600. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. Per my conversation with Ronnie Bolin this note does not apply to the proposed site. If it is determined that a riser pole is needed, developer will provide 30' of #4 rigid conduit and install first 10'. 3. Developer provides digital AutoCAD 20001 version of plat and /or site plan. Email to rbolin@ci.college- station.tx.u The CAD file of the Site Development Plan has been e- mailed to Ronnie Bolin at the provided address. 4. Developer provides load data for project. The estimated electrical load analysis for the proposed project can be found on sheet E600. 5. Developer provides temporary blanket easement for construction purposes. We have received an Easement Dedication Sheet application for the temporary blanket easement and it will be submitted for approval prior to the start of construction. 6. Developer provides easements for electric infrastructure as installed for electric lines. If it is determined that the electric line is on the proposed property the developer will provide the city with a meets and bounds descriptive easement. Miscellaneous: 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. The proposed irrigation system is protected by a pressure device and is to be installed per City Ordinance 2394. Please note the revision on the irrigation plan. 2. All Backflow devices must be installed and tested upon installation as per City Ordinance 2394. All backflow devices will be installed and tested upon installation as per City Ordinance 2394. Thank you for your attention to this matter. Please contact me if you have any questions or comments. Sincerely, Cheryl L. Obert 614.573.3328 phone 614.228.3337 fax cobert@glavan.com Attachments cc: Jeff Glavan File M: \PROJECTS\Chipotle \CMG066 - College Station \Admin \PRCresp022003.doc GLAVAN FEHER ARCHITECTS INC. 2 MIRANOVA PLACE TRANSMITTAL L COLUMBUS. OHIO 43215 Date: _April 11, 2003 Attention: Bridgette George_ Company: City of College Station_______ - - - - 1 101_ Texas Avenue - T E L 6 1 4. 2 2 8. 3 4 0 0 - _._.._._...College_S.tation,- 7X77840____......... From -- Cheryl_Oberf - F A X 61 4. 2 2 8. 3 3 3 7 Project: Chipotle Mexican Grill - College Station Project No.: CMG066 ❑ By Mail ❑ For Your Use W W W. G L A V A N . C o M ❑ By Hand ❑ For Your Approval ® By Special Courier ® For Your Review ❑ Pick Up ❑ U S A - - The Materials Listed - Below: ( -6-) -- complete- sets - of civil CD's _______ ( -1 -) revised landscape plan (2) revised site plans Remarks: Enclosed... -- _Enclosed...are.. the. - required- documents in response_ to development_ services. memo_ dated _04.02.2003___Please_ feel free to call with_ any questions_._._.._ ..__._.__ __ -Thank- you, Cheryl L. Obert cc: Jeff Glavan Scott Shippey M: \PROJECTS \Chipot1e \CMG066 - College Station\ Admin \Transmitta1031803bg_co.doc GLAVAN FEHER ARCHITECTS INC. 2 M I R A N O V A P L A C E COLUMBUS. OHIO 43215 T E L 6 1 4. 2 2 8. 3 4 0 0 F A X 6 1 4. 2 2 8. 3 3 3 7 W W W. G L A V A N . C O M U S A March 18, 2003 The City of College Station Bridgette George, Development Services 1 101 Texas Avenue College Station, TX 77840 797.764.3570 phone 797.764.3496 fax RE: Chipotle Mexican Grill 815 University Drive College Station, TX 77840 Ms. George, This letter is in response to the City of College Station PRC Meeting Minutes received March 14, 2003 and Staff Review Comments No. 2 received February 28, 2003. Planning: 1. An access easement will be required for the sidewalk that is built on private property. This will be required to C.O. Scott Deskins with SCC Development Company applied for a temporary blanket construction easement on March 06, 2003. The proposed 5' access easement has been shown on the site plan. 2. The curb detail proposed does not meet minimum standards and is not acceptable. Please see curb and pavement details sent with the last set of comments. The curb detail has been changed to the curb detail provided by the City of College Station. 3. Any existing meters or utilities that will be used are required to be in the public ROW or in a Public Utility Easement. Easements need to be shown on the site plan and must be provided prior to C.O. Scott Deskins with SCC Development Company applied for a temporary blanket construction easement on March 06, 2003. The proposed 10' public utility easement has been shown on the site plan. 4. 1 apologize for the outdated information sent to you by Fire Marshall Mies regarding the water lines. Please remove the 12" water line at the front of property. This line has been abandoned. Please also remove the water line shown traversing the property; this line does not exist. Per conversations with the city, the 12" water line and the line traversing the property have been noted as abandoned on the site development plan. 5. The islands at the end of each parking row that abut the dumpster pad will need to be extended the full length of the parking space. The islands at the end of each parking row that abut the dumpster pad have been modified. 6. The typical pavement detail is still showing the 6" extruded curb. This is not acceptable. The pavement detail has been changed to the detail provided by the City of College Station. PRC Meeting Minutes: 1. First, they will be loosing one parking space in order to extend a required end island next to the dumpster. The second change is to cut off the access shown through the neighboring property and make a turn around. Both of these changes have been reflected on the revised site development plan. 2. Commissioner Williams asked about the elevations and the attached signage. The applicant wants an internally lit sign but staff is recommending indirect lighting. The applicant Scott Shippey stated they had changed all of the signage to have the indirect lighting, except for the marquee sign. Commissioners Hall and Williams told the applicant that internally lit signs are not allowed in this area and all signs must be externally lit. The marquee sign is now externally lit. 3. Staff Planner Flanery stated that the Board should consider requiring some of the trees shown on the site plan be moved toward University Drive to better meet the intent of the streetscape requirement. She stated that this is within the Board's discretion. Commissioner Williams stated the trees look fine where they are and Commissioner Hall agreed. The landscape does not need to be changed. The landscape plan has been changed to address comments made regarding streetscape requirements from the Project Review Committee Staff Report dated February 24, 2003. Thank you for your attention to this matter. Please contact me if you have any questions or comments. Sincerely, (' Cheryl L. Obert 614.573.3328 phone 614.228.3337 fax cobert@glavan.com Attachments cc: Jeff Glavan File M: \PROJECTS \Chipotle \CMG066 - College Station \Admin \PRCresp03l8O3.doc March 4, 2003 Project Review Committee City of College Station P.O. Box 9960 College Station, TX 77840 Re: Site Plan Application (the "Application ") made by Cheryl Obert for a Chipotle Mexican Grill (the "Project ") to be located at 815 West University Drive, College Station, TX. Dear Ladies and Gentlemen: I have reviewed the plans (the "Site Plans ") accompanying the Application, prepared by Civil & Environmental Consultants, Inc, and dated January 31, 2003. Culpepper Family, L.P. owns the 3,386 (called 3,400) square feet tract of land (the "3,386 square feet tract ") shown by being shaded in yellow on the enclosed Land Title Survey. The Site Plans indicate an access way to and from the Project over and across the 3,386- square feet tract. I am not presently actually aware of any agreement or circumstance that allows for ingress and egress over the 3,386- square foot tract for the benefit of the Project land. Culpepper Family, L.P. does not generally object to the Project. However, Culpepper Family, L.P. does object to any use of the 3,386 - square foot tract by the owners, occupants or visitors of or to the Project. Yours truly, Culpepper Family, L.P. By: Culpepper Holding, L.L.C., General Partner By: ohn C. u peep I, anager 1 00 eoCIE 'BwSk Yiue . 'uite Z4-0 • ('O((e e s 'tati00, 1exAS ff 't0 • � .(���. I t �t f; ; 7��.��C. �=,(;_ , I � CMt S Tammy Macik - PRC Meeting Minutes in regards to Chipotle Restaurant From: Tammy Macik To: _§shipp _py_&hipotle.cor� Date: 03/14/2003 3:09:06 PM Subject: PRC Meeting Minutes in regards to Chipotle Restaurant Howdy! Attached you will find the PRC Meeting Minutes in regards to Chipotle Restaurant to be located 815 University Drive. If you have any questions or concerns, please let us know. Thanks, Tammy Macik < >< Secretary City of College Station -979- 764 -6254 Page 1 "This e -mail message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e -mail and destroy all copies of the original message. Thank you." CC: Carolyn Williams; Craig & Jean Hall; Flanery; Kelly Templin; Molly Hitchcock; Natalie Ruiz