HomeMy WebLinkAboutCorrespondenceSusan Hazlett PDMT: State Bank @ Longmire: the land next to Teachers' Cre Union: V: 260 -6963 Page 1 1
From:
Tammy Macik
To:
Pre D Group
Date:
12/16/02
Time:
2:OOPM - 3:OOPM
Subject:
PDMT: State Bank @ Longmire: the land next to Teachers' Credit Union: V: 260 -6963
Place:
Administrative Conference Room #3
Thanks,
Tammy Macik < ><
Secretary
City of College Station
—979- 764 -6254
� fla ale �uy���c Cam)
161r
IV c�,f
�ne irr�ia�.c�l �n�fRU�x�n�
Page 1 of 1
Joanna,
I recieved a voice mail from Jennifer Reeves with College Station re: the
temporary parking situation. Jennifer stated that they would be willing to
allow some measure of temporary parking for approx. 2 weeks. They will need
in writing from you a request to that effect stating why you will need to
have this relief and what your sequence of construction will be that will
require this. They will also need a statement as to how long you will need
the temporary parking in place. I would see all of this paperwork being
submitted with your site plan for approval. If you have any qeustions please
let me know. I have cc:d Jennifer so she has this information that she can
put in the STate Bank file.
Veronica
file: //C:\ Documents% 20and% 20Settings \jreeves\Local %20Settings \Temp \GW 100005.1-1... 12/20/2002
c �
2 o
a :Ln
O = a. Z
�Y3nU)
O
x
Cid Ch
L 8j C�
c Cd
�o
C ca �c
W �
W 0 9 'S
ui
a: u,i
a
CM t
O a .0 W
E C
- !
^ a ri
C n
O
a
J N
Z
U n
H
0 .
W
c c
J N pp
W �atN
U j d a- n
C
ch 17, 2003
.gette George
Development Services
P.O. Box 9960
College Station, TX 77840
Re: State Bank, 2202 Longmire College Station, TX 77845
Dear Bridgette,
Attached are ten sets of the State Bank located at 2202 Longmire in College
Station. These sets include a site plan, and civil and landscape plans for your
review. Also, attached is an application form, site plan checklist, development
permit application, $400.00 in fees and, one copy of a drainage report. This
amount is for the application fee and development permit fee. The $600.00 public
infrastructure inspection fee has not been included as we are not constructing any
public infrastructure on site. If you have any questions please give us a call.
Veronica J.$. Mor §W P.E.
Managing Partner
Cc: Brad Cutright, Cutright & Allen Architects
File
I0_115 KE 3131
979/968 -8888 SENDER'S DMECT LINE
979/968 -8887 FAX
SENDER'S E -MAIL: cutright @fais.net
Response to Staff Review
Project Name:
Location:
Staff Case file #:
Response Date:
Architect's Project No.:
CUTRIGHT & ALLEN, INC.
Architects & Planners
111 East Travis, Suite 222
LaGrange, Texas 78945
State Bank, College Station Branch
College Station, Texas
03- 00500074
25 March 2003
02.414
03/25/03
Below are the corresponding responses to Staff comments on the above referenced project. Attached are
Staff's original comments. Also attached are the re- submittals:
One (1) revised site plan
Easement dedication sheet and required documents
One (1) revised landscape plan
Planning
/ 1. No action.
`�/2. All easements noted as existing or new. See keynotes 15 -17 and 49 on A -1.0.
J 100 -year floodplain noted on site plan.
✓4. Building square footage noted on site plan.
'l -- -5. Fire lane designation and requirements noted on 2/A -1.0.
\J 6. All paving shown as curbed.
✓7. The top 4" minimum of the existing gravel lot will be removed and seeded per revised landscape
drawing.
J 8. Bollards at dumpster revised to 12' apart.
Landscape /Streetscape
J 1. See revised landscape plan
Engineering
1. Existing water meter will be used as per note on grading plan. A new 4" sewer tap to existing
sewer line along Longmire will be provided.
2.a. The utilities are all shown on the civil plan sheet (grading). Existing water, sewer, and storm lines
are shown along with the proposed lines.
2.b. All service lines are shown to the building on the civil plan sheet (grading).
3. Estimated water demand is 20 g.p.m. as per MEP -2. Estimated sewer demand is 90% of water
demand.
State Bank - College Station Branch
Response to Staff Review
25 March 2003
Page 2
Electrical
1. See note 5 on Electrical Service Provisions on MEP -2.
2. See note 8 on Electrical Service Provisions on MEP -2.
3. See keynote 34 on A -1.0 and note 7 on Electrical Service Provisions on MEP -2.
4. See keynote 50 on A -1.0 and note that points to pull box on MEP -2.
5. Electrical Load Analysis is shown on E -2 which is part of the Construction Documents. E -2 was
not submitted to city for site review.
6. A blanket easement form is attached.
7. An electrical easement is being written and will be dedicated as a separate metes/bounds
description.
Miscellaneous
1. See revised landscape plan.
End of Response
Distribution: Bridgette George, Assistant Development Manager, mail
(without attachments)
Steve Stapp, State Bank, fax 979/968 -9781
Veronica Morgan, Mitchell & Morgan Engineering, L.L.P., fax 979/260 -3564
Barry Foat, MEC Engineers, fax 713/622 -7825
Bob Ruth Landscaping, fax 979/774 -0923
Dean A. Allen, Cutright & Allen, Inc., hand deliver
file