Loading...
HomeMy WebLinkAboutCorrespondenceSusan Hazlett PDMT: State Bank @ Longmire: the land next to Teachers' Cre Union: V: 260 -6963 Page 1 1 From: Tammy Macik To: Pre D Group Date: 12/16/02 Time: 2:OOPM - 3:OOPM Subject: PDMT: State Bank @ Longmire: the land next to Teachers' Credit Union: V: 260 -6963 Place: Administrative Conference Room #3 Thanks, Tammy Macik < >< Secretary City of College Station —979- 764 -6254 � fla ale �uy���c Cam) 161r IV c�,f �ne irr�ia�.c�l �n�fRU�x�n� Page 1 of 1 Joanna, I recieved a voice mail from Jennifer Reeves with College Station re: the temporary parking situation. Jennifer stated that they would be willing to allow some measure of temporary parking for approx. 2 weeks. They will need in writing from you a request to that effect stating why you will need to have this relief and what your sequence of construction will be that will require this. They will also need a statement as to how long you will need the temporary parking in place. I would see all of this paperwork being submitted with your site plan for approval. If you have any qeustions please let me know. I have cc:d Jennifer so she has this information that she can put in the STate Bank file. Veronica file: //C:\ Documents% 20and% 20Settings \jreeves\Local %20Settings \Temp \GW 100005.1-1... 12/20/2002 c � 2 o a :Ln O = a. Z �Y3nU) O x Cid Ch L 8j C� c Cd �o C ca �c W � W 0 9 'S ui a: u,i a CM t O a .0 W E C - ! ^ a ri C n O a J N Z U n H 0 . W c c J N pp W �atN U j d a- n C ch 17, 2003 .gette George Development Services P.O. Box 9960 College Station, TX 77840 Re: State Bank, 2202 Longmire College Station, TX 77845 Dear Bridgette, Attached are ten sets of the State Bank located at 2202 Longmire in College Station. These sets include a site plan, and civil and landscape plans for your review. Also, attached is an application form, site plan checklist, development permit application, $400.00 in fees and, one copy of a drainage report. This amount is for the application fee and development permit fee. The $600.00 public infrastructure inspection fee has not been included as we are not constructing any public infrastructure on site. If you have any questions please give us a call. Veronica J.$. Mor §W P.E. Managing Partner Cc: Brad Cutright, Cutright & Allen Architects File I0_115 KE 3131 979/968 -8888 SENDER'S DMECT LINE 979/968 -8887 FAX SENDER'S E -MAIL: cutright @fais.net Response to Staff Review Project Name: Location: Staff Case file #: Response Date: Architect's Project No.: CUTRIGHT & ALLEN, INC. Architects & Planners 111 East Travis, Suite 222 LaGrange, Texas 78945 State Bank, College Station Branch College Station, Texas 03- 00500074 25 March 2003 02.414 03/25/03 Below are the corresponding responses to Staff comments on the above referenced project. Attached are Staff's original comments. Also attached are the re- submittals: One (1) revised site plan Easement dedication sheet and required documents One (1) revised landscape plan Planning / 1. No action. `�/2. All easements noted as existing or new. See keynotes 15 -17 and 49 on A -1.0. J 100 -year floodplain noted on site plan. ✓4. Building square footage noted on site plan. 'l -- -5. Fire lane designation and requirements noted on 2/A -1.0. \J 6. All paving shown as curbed. ✓7. The top 4" minimum of the existing gravel lot will be removed and seeded per revised landscape drawing. J 8. Bollards at dumpster revised to 12' apart. Landscape /Streetscape J 1. See revised landscape plan Engineering 1. Existing water meter will be used as per note on grading plan. A new 4" sewer tap to existing sewer line along Longmire will be provided. 2.a. The utilities are all shown on the civil plan sheet (grading). Existing water, sewer, and storm lines are shown along with the proposed lines. 2.b. All service lines are shown to the building on the civil plan sheet (grading). 3. Estimated water demand is 20 g.p.m. as per MEP -2. Estimated sewer demand is 90% of water demand. State Bank - College Station Branch Response to Staff Review 25 March 2003 Page 2 Electrical 1. See note 5 on Electrical Service Provisions on MEP -2. 2. See note 8 on Electrical Service Provisions on MEP -2. 3. See keynote 34 on A -1.0 and note 7 on Electrical Service Provisions on MEP -2. 4. See keynote 50 on A -1.0 and note that points to pull box on MEP -2. 5. Electrical Load Analysis is shown on E -2 which is part of the Construction Documents. E -2 was not submitted to city for site review. 6. A blanket easement form is attached. 7. An electrical easement is being written and will be dedicated as a separate metes/bounds description. Miscellaneous 1. See revised landscape plan. End of Response Distribution: Bridgette George, Assistant Development Manager, mail (without attachments) Steve Stapp, State Bank, fax 979/968 -9781 Veronica Morgan, Mitchell & Morgan Engineering, L.L.P., fax 979/260 -3564 Barry Foat, MEC Engineers, fax 713/622 -7825 Bob Ruth Landscaping, fax 979/774 -0923 Dean A. Allen, Cutright & Allen, Inc., hand deliver file