HomeMy WebLinkAboutPACPREDEVELOPMENT MEETING
The purpose of a predevelopment meeting is to meet the City staff that will be involved with your
development and identify general issues that need further analysis. Along with the discussion of
these major issues, staff will talk about the development process, distribute necessary information
and discuss what permits will be required for your particular development.
This meeting is in no way a complete review of your project.
Staff will perform a formal thorough review once the minimum requirements are submitted for your
particular development.
General Information
Date of Meeting:
Applicant (s)
Proposal
City Staff Present:
Planners
Molly Hitchcock
Jennifer Reeves
Jennifer Flanery
Engineers
Brett McCulley
ISpencer Thompson
arol Cotter
Phone Number: 9 - p �,( 97q)
Administration
Kelly Templin
Jane Kee
Natalile Ruiz
ridgette George
Deborah Grace
Susan Hazlett
Tammy Macik
E lectrical
Ronnie Bolin
Tony Michalsky
Fire
Jon Mies
Jerry Duffey
Raymond Olsen
eve Smith
oo
i
+�l
Q
Others: 4&�
001&1
OAGrouplDeve_ SeffammylPreDevelopment MeelingAs
Development Issues:
Land Use /Zoning
(i.e. Restaurant/C -1)
Subdivision /Platting
Issues
T -Fare Plan /Street
Issues
Driveway Access
Parking
Special District Information:
Yes
No
Yes
No
Ye
No
Yes
No
Parkland /Greenways Dedication
Notes:
a
Azl-
Notes:
Parks & Recreation Board Consideration
Drainage Issues
Utility Issues
Water
Availability /Capacity
Yes
No
Yes Notes: rlemdacz
N o 0
N Yes
No
OAGroup\Deve_ SeffammylPreDevelopmenl Meeting.xls
Sanitary Sewer
Availability /Capacity
Impact Fee
Electrical
Fire Hydrant
Miscellaneous
Landscaping
Streetscape
Dumpster Location
and How Many
Signs
Screening /Buffering
Variance Requests
At�
Yes Notes: (�_JUMJW1A1_ Z4
No
Yes Notes:
No
Yes Notes:
No
Ad
Yes Notes:
No
Yes
No
rrifif�r�l�l
Yes Notes: W., j Ih (Z/ 11444le
No
Yes Notes:
No um - P'f7 4L
Yes Notes: I
No
Yes Notes:
No
7 (__ L (kf &�, f
j // 4kw / J-
O: \Group \Deve_ SeffammyTreDevelopment Meeting.xls
CUTRIGHT
I
A L L E N
ARCHITECTS
16 December 2002
STATE BANK - COLLEGE STATION BRANCH
Pre - Development Meeting, 1:00 p.m.
1. Phase 1 construction includes construction of new bank and east parking lot. Phase 2 consists of
demolition of the existing bank and construction of north parking lot.
2. Can the back property be sold with a private access from Longmire and the dedicated utility
easement?
3. Should the existing property lines be abandoned? k 1 n e A A _ S i ak
4. Is the relocation of the existing storm drain to the utility easement permissible?
5. Will the city be doing any utilities upgrade in area in the near future? (i.e., new power poles, etc.)
6. Are the dumpsters allowed in the shared access?
7. Verify curb radii.
8. Verify back -up space depth of 7-0" at parking lot.
s: \wpwin \c &a \414 \predeve1.mtg
CUT RIGHT
1 W
ALLEN
ARCHITECTS
6 December 2002
City of College Station Development Services
Attn: Tammy
1101 Texas Ave.
College Station, Texas 77840
RE: State Bank
2202A Longmire (Existing building)
College Station, Texas 77845
Dear Tammy:
- pDIiT
p7-
l
Attached are some questions pertaining to the pre- development meeting for the above referenced
project that is scheduled with you, myself, Joanna Prihoda and Veronica Morgan on 16 December
2002, at 1:00 p.m.
Also attached are two surveys and two new proposed plans for your review.
If you have any questions, please contact me.
Sincerely,
CUTRIGHT & ALLEN, INC.
w \ 1
Brad Cutright, Architect
President
BC /srb
attachments
xc: file
111 EAST TRAVIS LA GRANGE, TEXAS 78945 FAX (979) 968.8887 (979) 968.8888
C UT R I G H T
I
ALLEN
ARCHITECTS
16 December 2002
STATE BANK - COLLEGE STATION BRANCH
Pre - Development Meeting, 1:00 p.m.
1. Phase 1 construction includes construction of new bank and east parking lot. Phase 2 consists of
demolition of the existing bank and construction of north parking lot.
2. Can the back property be sold with a private access from Longmire and the dedicated utility
easement?
3. Should the existing property lines be abandoned?
4. Is the relocation of the existing storm drain to the utility easement permissible?
5. Will the city be doing any utilities upgrade in area in the near future? (i.e., new power poles, etc.)
6. Are the dumpsters allowed in the shared access?
7. Verify curb radii.
8. Verify back -up space depth of 7-0" at parking lot.
s: \wpwin \c &a \414 \predeve1.mtg