Loading...
HomeMy WebLinkAboutPACPREDEVELOPMENT MEETING The purpose of a predevelopment meeting is to meet the City staff that will be involved with your development and identify general issues that need further analysis. Along with the discussion of these major issues, staff will talk about the development process, distribute necessary information and discuss what permits will be required for your particular development. This meeting is in no way a complete review of your project. Staff will perform a formal thorough review once the minimum requirements are submitted for your particular development. General Information Date of Meeting: Applicant (s) Proposal City Staff Present: Planners Molly Hitchcock Jennifer Reeves Jennifer Flanery Engineers Brett McCulley ISpencer Thompson arol Cotter Phone Number: 9 - p �,( 97q) Administration Kelly Templin Jane Kee Natalile Ruiz ridgette George Deborah Grace Susan Hazlett Tammy Macik E lectrical Ronnie Bolin Tony Michalsky Fire Jon Mies Jerry Duffey Raymond Olsen eve Smith oo i +�l Q Others: 4&� 001&1 OAGrouplDeve_ SeffammylPreDevelopment MeelingAs Development Issues: Land Use /Zoning (i.e. Restaurant/C -1) Subdivision /Platting Issues T -Fare Plan /Street Issues Driveway Access Parking Special District Information: Yes No Yes No Ye No Yes No Parkland /Greenways Dedication Notes: a Azl- Notes: Parks & Recreation Board Consideration Drainage Issues Utility Issues Water Availability /Capacity Yes No Yes Notes: rlemdacz N o 0 N Yes No OAGroup\Deve_ SeffammylPreDevelopmenl Meeting.xls Sanitary Sewer Availability /Capacity Impact Fee Electrical Fire Hydrant Miscellaneous Landscaping Streetscape Dumpster Location and How Many Signs Screening /Buffering Variance Requests At� Yes Notes: (�_JUMJW1A1_ Z4 No Yes Notes: No Yes Notes: No Ad Yes Notes: No Yes No rrifif�r�l�l Yes Notes: W., j Ih (Z/ 11444le No Yes Notes: No um - P'f7 4L Yes Notes: I No Yes Notes: No 7 (__ L (kf &�, f j // 4kw / J- O: \Group \Deve_ SeffammyTreDevelopment Meeting.xls CUTRIGHT I A L L E N ARCHITECTS 16 December 2002 STATE BANK - COLLEGE STATION BRANCH Pre - Development Meeting, 1:00 p.m. 1. Phase 1 construction includes construction of new bank and east parking lot. Phase 2 consists of demolition of the existing bank and construction of north parking lot. 2. Can the back property be sold with a private access from Longmire and the dedicated utility easement? 3. Should the existing property lines be abandoned? k 1 n e A A ­_ S i ak 4. Is the relocation of the existing storm drain to the utility easement permissible? 5. Will the city be doing any utilities upgrade in area in the near future? (i.e., new power poles, etc.) 6. Are the dumpsters allowed in the shared access? 7. Verify curb radii. 8. Verify back -up space depth of 7-0" at parking lot. s: \wpwin \c &a \414 \predeve1.mtg CUT RIGHT 1 W ALLEN ARCHITECTS 6 December 2002 City of College Station Development Services Attn: Tammy 1101 Texas Ave. College Station, Texas 77840 RE: State Bank 2202A Longmire (Existing building) College Station, Texas 77845 Dear Tammy: - pDIiT p7- l Attached are some questions pertaining to the pre- development meeting for the above referenced project that is scheduled with you, myself, Joanna Prihoda and Veronica Morgan on 16 December 2002, at 1:00 p.m. Also attached are two surveys and two new proposed plans for your review. If you have any questions, please contact me. Sincerely, CUTRIGHT & ALLEN, INC. w \ 1 Brad Cutright, Architect President BC /srb attachments xc: file 111 EAST TRAVIS LA GRANGE, TEXAS 78945 FAX (979) 968.8887 (979) 968.8888 C UT R I G H T I ALLEN ARCHITECTS 16 December 2002 STATE BANK - COLLEGE STATION BRANCH Pre - Development Meeting, 1:00 p.m. 1. Phase 1 construction includes construction of new bank and east parking lot. Phase 2 consists of demolition of the existing bank and construction of north parking lot. 2. Can the back property be sold with a private access from Longmire and the dedicated utility easement? 3. Should the existing property lines be abandoned? 4. Is the relocation of the existing storm drain to the utility easement permissible? 5. Will the city be doing any utilities upgrade in area in the near future? (i.e., new power poles, etc.) 6. Are the dumpsters allowed in the shared access? 7. Verify curb radii. 8. Verify back -up space depth of 7-0" at parking lot. s: \wpwin \c &a \414 \predeve1.mtg