Loading...
HomeMy WebLinkAboutCost EstimateGALIND 0 ENGINEERS AND PLANNERS, INC. 3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846 -8868 Job: 5 -03 UNIVERSITY HEIGHTS CONDOS 4.00 Date: 03/11/03 ea. 5 1.4 -ACR. TRACT 1,000 13 Construction Layout & As -built Drawings % 3 7,800.00 WELCH AVE. & NEVADA ST. 14 Construction Layout & As -built Drawings % 3 7,800.00 234 COLLEGE STATION, BRAZOS COUNTY, TX ENGINEER'S CONSTRUCTION ESTIMATE PUBLIC INFRASTRUCTURE - - - - - -- - ITEM - - -- - ------- - - - - -- ---------------- - - - - -- ---------------------------------------- - - - - -- ------- - - - - -- -------------- SPEC # DESCRIPTION UNIT - - - - - -- ------ - - - - -- -------------------- - - - - -- - - - - - -- ----- - - - - -- QUANT. - - - - -- ------------- - - - - -- --------------- PRICE ----- - - - - -- ----- - - - -- TOTAL - - - - -- ---- - - - - - - -- ------ - - - - -- -------------------- - - - - -- - - - - - -- ----- WATER - - - - -- ----- - - - - -- ----- - - - - -- 1 ---------------- - - - - -- ---------------------------------------------- 4" PVC C900, CL200 (4' bury) If 690 14.00 9,660 2 4" - 45 Degree Bend ea. 1 100.00 100 3 4" - 22.5 Degree Bend ea. 2 100.00 200 4 4" - 11.25 Degree Bend ea. 2 100.00 200 5 6 "X6 "X4" Tapping Sleeve & Valve ea. 1 1000.00 1,000 6 3/4" Short Single Service ea. 2 130.00 260 7 1 1/2" Short Double Service ea. 10 160.00 1,600 8 2" Blow Off Valve ea. 1 150.00 150 9 Contingency % 3 13,170.00 395 10 Construction Layout & As -built Drawings % 3 13,170.00 395 Subtotal --------------- $$ - - - -- 13,960 SIDEWALK ALONG WELSH STREET 11 4' -Wide Sidewalk s.f. 1,700 4.00 6,800 12 Handicap Ramps ea. 5 200.00 1,000 13 Construction Layout & As -built Drawings % 3 7,800.00 234 14 Construction Layout & As -built Drawings % 3 7,800.00 234 Subtotal $ 15 16 17 ID][7_1R'I_TC4 Concrete Flume Contingency Construction Layout & As -built Drawings s.f. 110 % 3 % 3 Subtotal $ 8,034 8.00 880 880.00 26 880.00 26 933 ------ - - - - -- -------------------- - - - - -- - - - - - -- ----- - - - - -- ----- - - - - -- ----- - - - - -- ------------ -------------------- - - - - -- - - - - - -- ----- - - - - -- ----- - - - - -- ----- - - - - -- Total Estimated Construction Cost $ __, 22,927 n A. Galindo, P.E. # 53425 11- Mar -03 OF Te,ij i I ° ............,•........ °..Q.' 5'3 ,p C.