Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 25, 2003 TO: Randy French, Stylecraft Builders, Via fax 690.9069 FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD VILLAGE PH 6 (REZONING) Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, May 5, 10:00 a.m., to be scheduled for the Planning & Zoning Commission meeting on Thursday, May 15, 2003, 7:00 p.m., in the City Hall Council Chambers: Two (2) revised concept plans. If there are comments that you are not addressing with the revised concept plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Molly Hitchcock or myself at 764 -3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693 -2554 Case file #03- 00500096 Home of Texas A &M University STAFF REVIEW COMMENTS Project: WESTFIELD VILLAGE PH 6 (REZONING) - 03 -096 PLANNING 1. If approved, this PDD -H will replace the previous PDD -H. Please list the bulk or dimensional variations that are sought for Phase 6. 2. In the legend of the concept plan, it seems one of the 8 -ft. pathway symbols is actually designating phase lines. 3. Please clarify what off -site pathways the developer has agreed with Parks to construct. Please remove all other proposed 8 -ft. pathways that are off -site. 4. Will there be any treatment at the corner of Victoria and the new collector? Reviewed by: Molly Hitchcock Date: April 25, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of2 y CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 April 25, 2003 TO: Randy French, Stylecraft Builders, Via fax 690.9069 FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD VILLAGE PH 6 (REZONING) Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, May 5, 10:00 a.m., to be scheduled for the Planning & Zoning Commission meeting on Thursday, May 15, 2003, 7:00 p.m., in the City Hall Council Chambers: Two (2) revised concept plans. If there are comments that you are not addressing with the revised concept plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Molly Hitchcock or myself at 764 -3570. Attachments: Staff review comments cc: Case file #03- 00500096 Home of Texas A &M University STAFF REVIEW COMMENTS Project: WESTFIELD VILLAGE PH 6 (REZONING) - 03 -096 PLANNING 1. If approved, this PDD -H will replace the previous PDD -H. Please list the bulk or dimensional variations that are sought for Phase 6. 2. In the legend of the concept plan, it seems one of the 8 -ft. pathway symbols is actually designating phase lines. 3. Please clarify what off -site pathways the developer has agreed with Parks to construct. Please remove all other proposed 8 -ft. pathways that are off -site. 4. Will there be any treatment at the corner of Victoria and the new collector? Reviewed by: Molly Hitchcock Date: April 25, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2