Loading...
HomeMy WebLinkAboutCost Estimate� )Jp ra- - l SOUTHERN TRACE SUBDIVISION S.H. 40 UTILITY CROSSING ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST DATE 2/3/04 ITEM DESCRIPTION UNITS QUANTITY UNIT PRICE EXTENSION 1 MOBILIZATON, BONDS L.S. 1 $5,000.00 $5,000 2 CLEARING ROW AND EASEMENTS AC. 0.5 $1,000.00 $500 3 12" PVC C900 WATERLINE - AVERAGE DEPTH 8.5' L.F. 152 $35.00 $5,320 4 12" DUCTILE IRON LOK -FAST CL350 WATERLINE L.F. 418 $40.00 $16,720 5 WATERLINE - STRUCT BACKFILL - AVERAGE DEPTH 8.0' L.F. 160 $25.00 $4,000 6 20" STEEL CASING (10 -12' DEEP) IN TXDOT ROW 3/8" MIN. THK. CASCADE SPACERS, COMPLETE IN PLACE L.F. 105 $50.00 $5,250 7 20" STEEL CASING (12 -14' DEEP) IN TXDOT ROW 3/8" MIN. THK. CASCADE SPACERS, COMPLETE IN PLACE L.F. 305 $60.00 $18,300 8 12" X 8" REDUCER EA. 1 $300.00 $300 9 12" X 45 DEG BEND EA. 2 $400.00 $800 10 12" PLUG EA. 1 $300.00 $300 11 8" TEE EA. 1 $350.00 $350 12 8" VALVE & BOX EA. 2 $500.00 $1,000 13 8 "X45 DEG BEND EA. 2 $350.00 $700 14 8" PLUG EA. 1 $300.00 $300 15 CONNECT TO X- WATERLINE g OLDENBURG L.S. 1 $500.00 $500 16 REPAIR OF EXISTING DITCH TO PRECONSTRUCTION CONDITION CURLEX BLANKET AND VEGETATION S.Y. 140 $20.00 $2,800 17 8" PVC SANITARY SEWER (10 -12' FEET DEEP) L.F. 74 $35.00 $2,590 18 8" PVC SANITARY SEWER (12 -14' FEET DEEP) L.F. 34 $35.00 $1,190 19 10" PVC SANITARY SEWER (12 -14 FEET DEEP) L.F. 20 $35.00 $700 HESTER ENGINEERING COMPANY SOUTHERN TRACE SUBDIVISION S.H. 40 UTILITY CROSSING CONSTRUCTION COST ESTIMATE 2/3/04 PAGE I OF 2 PAGES 03.322 2.3.Oy 4 ft 20 10" PVC SANITARY SEWER PLUG EA. 1 $100.00 $100 21 10 "D.I. LOK -FAST CL 350 SANITARY SEWER (10 -12' FEET DEEP) L.F. 110 $44.00 $4,840 22 10 "D.I. LOK -FAST CL 350 SANITARY SEWER (12 -14' FEET DEEP) L.F. 334 $44.00 $14,696 23 SAN SEW - STRUCT BACKFILL - AVGERAGE DEPTH 8.0' L.F. 160 $25.00 $4,000 24 18" STEEL CASING (12 -14' DEEP) IN TXDOT ROW 3/8" MIN. THK. CASCADE SPACERS, COMPLETE IN PLACE L.F. 434 $60.00 $26,040 25 STD. MANHOLE (0 -6' DEEP) EA. 2 $1,800.00 $3,600 26 X -DEPTH MANHOLE V.F. 12 $150.00 $1,800 27 CONNECT TO X- SAN.SWR. L.S. 1 $500.00 $500 28 MANDRELL TESTING L.F. 572 $2.00 $1,144 29 TVNHS RECORDING OF LINE L.F. 572 $2.00 $1,144 30 RE- ESTABLISH HEALTHY GROUND COVER L.S. 1 $2,000.00 $2,000 31 EROSION & SEDIM. CONTROL SYSTEM INSTALLATION, MAINTENANCE, INSPECTION REPORTS & REMOVAL OF SEDIMENTATION SYSTEM LS. 1 $2,000.00 $2,000 32 ITRENCH SAFETY L.F. 1142 $3.00 $3,426 am,'a'arA�L. � � .g ° "G Q. T % .�,% pst, HESTER ENGINEERING COMPANY MOBILIZATION = $5 WATERLINE = $56 SANITARY SEWER = $62,344 MISCELLANEOUS = $7 TOTAL ESTIMATED CONSTRUCTION COST = $131,910 SOUTHERN TRACE SUBDIVISION S.H. 40 UTILITY CROSSING CONSTRUCTION COST ESTIMATE PAGE 2 OF 2 PAGES 2/3/04