Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Fire Flow Analysis
Scenario: Base Fire Flow Analysis Fire Flow Report Label Fire Flow Balanced? Satisfies Fire Flow Constraints? Needed Fire Flow (gpm) Demand (gpm) Calculated Residual Pressure (psi) Total Flow Needed (gpm) Minimum System Junction Calculated Minimum System Pressure (psi) TEE J -2 true true 1,500.00 16.65 70.15 1,516.65 FH J -9 59.41 J -3 BENDS true true 1,500.00 0.00 51.21 1,500.00 FH J -9 45.67 TEE J-4 true true 1,500.00 1.67 46.53 1,501.67 FH J -9 42.42 FH J -5 true true 1,500.00 9.18 44.71 1,509.18 FH J -9 41.47 TEE J -6 true true 1,500.00 0.00 41.30 1,500.00 BO J -7 39.14 BO J -7 true true 1,500.00 0.00 29.49 1,500.00 FH J -9 40.44 FH J -8 true true 1,500.00 3.34 40.29 1,503.34 BO J -7 40.04 FH J -9 true true 1,500.00 19.19 38.13 1,519.19 BO J -11 41.80 J -10 true true 1,500.00 6.68 41.56 1,506.68 FH J -9 39.61 BO J -11 true true 1,500.00 0.00 35.861 1,500.00 FH J -9 1 39.61 Title: Southern Trace Subdivision Project Engineer: Michael G. Hester, P.E. d: \haestad \wtrc'southertrace.wcd HESTER ENGINEERING COMPANY WaterCAD v4.1.1 [4.2014] 01/26/04 03 0 ':40 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1- 203 - 755 -1666 Page 1 of 1