HomeMy WebLinkAboutParkland DedicationPark Land Dedication Ordinance
Project Review Checklist
Date Received:
Park zone:
Current Zone Balance:
Project Location:
Name of Development:
Applicant:
Address:
City /State /Zip:
Phone Number /Fax:
E -mail:
Engineer /Planner:
Address:
City /State:
Phone Number /Fax:
E -Mail:
Section 10 -B -1: Land Dedication
Single Family Dwelling Units
Multi - Family Dwelling Units:
Total Land Requirement:
Proposed Dedication:
01/28/2003
10
$112,958
West end of Barron Road near proposed S.H. 40
Spring Creek Development
Barron Road Meadows, L.L.P.
PO Box 277
Normangee, Texas 77871
Fax Number:
Ash & Browne Engineering, Inc.
PO Box 10838
College Station, Texas 77842
979 -846 -6914 Fax Number: 979- 846 -8914
REQUIRED COMPLIANCE
340
3.37 Acres
3 acres & greenway
Section 10 -B -2: Fee in Lieu of Land
Has the Planning and Zoning Commission's approval been obtained? No
Land Fee:
Single Family Fee ($198 /dwelling unit):
Multi - Family Fee ($160 /dwelling unit):
Total Acquisition Fee:
Section 10 -B -3: Park Development Fee
Single Family Fee ($358 /dwelling unit):
Multi- family Fee ($292 /dwelling unit):
Total Fee Amounts:
Total Single Family Fee ($556 /dwelling Unit)
Multi - Family Fee ($452 /dwelling Unit):
$67,320
$121,720
$189,040
Park Land Dedication Checklist
O /Board /Park Land Dedication /checklisbOriginals /Long Version Revised.xls
Page 1
G
Section 10 -B-4: Park Development in Lieu of Fee
Required development cost:
Staff review date and comment:
Parks Board review and decision:
Section 10 -B -5: Minimum Park Size
Is the proposed park less than five (5) acres? Yes
The proposed park is 3 acres, but it is continuous
with a 13 acres Spring Creek drainage way that can
If yes, staff recommends: be dedicated as park land or as greenway.
Section 10 -13-7: Prior Park Acquisition
Is there an existing park that can serve the proposed development? Yes
Shenendoah Park can potentially serve this area,
although distances from some portions of the
If yes, staff recommends: development will exceed 1/2 mile.
Section 10 -E: Comprehensive Plan
Is the proposed park dedication in compliance with the
City's Comprehensive Plan and the Recreation, Park,
and Open Space Master Plan? Yes
The current and revised plan calls for additional
Comments: neighborhood park property within the zone.
Section 10 -F: Additional Information
1. Is land in the 100 -year floodplain? No Percentage:
a. Detention /Retention? No Size:
Meets Board Policy?
Acreage in floodplain: None Percentage:
Acreage in detention: None Percentage:
Acreage in greenways: None Percentage:
3 acres
Comments: The 3 acres of park land adjoin this greenway.
b. Does the location require users to cross an arterial road? Yes
Park Land Dedication Checklist
O /Board /Park Land Dedication /checklist/Originals/Long Version Revised.xls
Page 2
c. Topography:
d. Trees /Scenery:
2.
a. Is the land adjacent to a school? This site will be approximately 1/4 mile from the new high school site.
b. Restricted access:
c. Is there screening if the park
joins a non - residential use?
d. Park perimeter percentage that
abuts a street:
Access to the park will be good from the greenway and from Southern
Plantation Street.
N/A
Approximately 35 %, although this may increase depending on
residential street desian.
Staff Recommendations: Staff recommends acceptance of the Master Development Plan. The
number of dwelling units within this park zone (10) requires the addition of more neighborhood park.
This park will improve access to neighborhood park facilities. The Parks and Recreation Advisory Board
may wish to tour the park site.
Section 10 -G: Approval:
Accepted the park land dedication and the greenway, with the
Parks and Recreation Advisory understanding that the park will be developed in conjunction with the
Board: trails and lighting within that greenway (Feb. 11, 2003).
Planning and Zoning Commission:
City Council:
Park Land Dedication Checklist
0/Board/Park Land Dedication /checklist/Originals /Long Version Revised.xls
Page 3