HomeMy WebLinkAboutDrainage ReportDRAINAGE REPORT
FOR THE
K.W. SCHICK
9.627 ACRE TRACT NINE
(VOLUME 542, PAGE 131)
CRAWFORD BURNETT LEAGUE, A -7
HYDRAULIC STUDY
FOR
aw �
BEE CREEK TRIBUTARY B
MDG JOB NO. 000776-3596
COLLEGE STATION, BRAZOS COUNTY, TEXAS
JULY 2003
2551 Texas Ave. South, Ste. A, College Station, TX 77840
Ofc: 979.693.5359 Fax: 979.693.4243 Email: mdgcstx @yahoo.com
Purpose of study:
MDG (Municipal Development Group) was engaged to conduct a floodplain analysis for
tracts Four, Five, Six, Seven, Eight, and Nine of the K.W. Schick 36.182 Acre Tract. The
objective of this study was to determine the extent of the floodway and floodplain
through tracts Four, Five, Six, Seven, Eight and Nine.
General Location and Description:
The subject site is Tract Nine and is located along Wellborn Road between the city streets
of Southwest Parkway and Christine Lane. Currently, the project site is undeveloped and
exists in a relatively natural state that is covered with native grasses, underbrush and
canopy tree cover. The combined 19.627 -acre tracts drain directly into Bee Creek
Tributary B. The monument data for Tract Nine is College Station Monument # 119,
1994 from datum NGVD 1929. This monument is located on Welsh Avenue and is
approximately in the southwest quadrant of the intersection of Welsh Avenue and F.M.
2818. Monument #119 is west 6.10 feet from the back of curb on Welsh Avenue and at
the corner end of the sidewalk as shown in Exhibit 1.
Scope of the Study:
MDG reviewed existing FEMA (Federal Emergency Management Agency) FIRM'S
(Flood Insurance Rate Maps) and determined that Bee Creek Tributary B was the subject
stream, however, no data was available for the upper reaches of Bee Creek Tributary B.
The first cross section available from FEMA data is cross section G as shown on the map
in Exhibit 2. Cross section G is located downstream of Tract Nine, but lies in the
watershed area.
Due to the lack of available data, extensive ground topographic survey was conducted
through out the upper reaches of this watershed. This survey provided the data required
to conduct the analysis. This data was then incorporated into AutoDesk Land Desktop 3,
where contours and cross - section profiles where generated.
The watershed, as depicted in Table 1, consists of three areas totaling 591.14 acres. Area
1 consists of 351.53 acres and is the northern most area. The second area consists of
170.74 acres and is the western most area. The third area consists of 68.87 acres and is
the eastern most area. The watershed flow into Tributary B, including the unnamed
Tributary of Tributary B was calculated using the Rational Method. These calculations
are shown in Table 1.
The water surface elevations are computed using an iterative application of the
Manning's Equation called the standard step. The accepted and well -used computer
program for this type of computation is HEC -RAS 3. 1.1 (Hydraulic Engineering Center —
River Analysis System), which was developed by USACE (United States Army Corp of
Engineers). The calculated flow rates were entered into HEC -RAS at the beginning and
end of each reach and are shown in Table 2. These discharges, as well as the generated
cross - sections, were analyzed in HEC -RAS yielding a floodplain and floodway.
The floodplain profile generated by HEC -RAS had elevation variances. In order to create
a floodplain with a relatively constant elevation, higher elevations were chosen in order
to create a conservative profile.
Plan Data:
A plan in HEC -RAS is the combination of geometric data and flow data. A total of forty -
five (45) water surface profiles at each ground - surveyed cross - section location were
developed using various geometric and flow data. Listed in Appendix A are the results of
the hydraulic analysis of Bee Creek Tributary B performed with the HEC -RAS modeling
program. Tributary B was analyzed from its beginning up to cross - section G, which is
documented in FIRM map number 48041 CO182 C dated July 2, 1992. A map of the
entire analyzed area is shown in Exhibit 3.
Results:
The HEC -RAS water surface elevation of 286.07 feet at cross - section 11.9 compares to
the water surface elevation of 285.70 feet at cross - section G with acceptable standards,
not exceeding ±0.50 foot. Knowing this, the floodplain was created using the water
surface elevations at each cross - section. The floodplain generated by the flood study is
considerably smaller than the floodplain produced by FEMA, resulting in more usable
land than originally considered. A floodway map was also generated using encroachment
method 1 in HEC -RAS. This method moves the encroachment stations, allowing the
watershed elevation to raise no more than one foot. Both the floodway and floodplain are
shown in Exhibit 4. The encroachment data is shown in Appendix B.
Table 2
Station
Number
2 -YR Flow Rate
(cfs)
25 -YR Flow Rate
(cfs)
100 -YR Flow Rate
(cfs)
11
733.230
1189.292
1410.733
1
781.068
1266.884
1502.773
35
232.198
380.369
452.148
28
244.529
400.568
476.160
27
1025.597
1667.452
1978.933
11.6
1154.057
1811.748
2145.023
Area 1
GENERAL INFORMATION
Description: Pre - Development Drainage Area 1
Total Drainage Area = 351.53 acres
GIVEN
Velocity of Runoff =
4.50 " /sec
Coefficient of Runoff =
0.56
Maximum Travel Distance =
6600 ft
Time of Concentration =
24.44 min
"NOTE: Minimum T allowed = 10 min.
2 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.745
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
RESULT
Rainfall Intensity (1 = 3.935 in /hr
Q2 = 781.068 cfs
Rainfall Intensity (1 = 4.891 /hr
Q5 = 970.754 cfs
Rainfall Intensity (I = 5.559 in /hr
Quo = 1103.511 cfs
Rainfall Intensity ( = 6.382 in /hr
Q25 = 1266.884 cfs
Rainfall Intensity (150) = 7.252 /hr
F57_ 1439.570 cfs
Rainfall Intensity (I,00) = 7.571 /hr
Q�oo = 1502.773 cfs
Area 2
GENERAL INFORMATION
Description: Pre - Development Drainage Area 2
Total Drainage Area = 170.74 acres
GIVEN
Velocity of Runoff =
2.50 " /sec
Coefficient of Runoff =
0.41
Maximum Travel Distance =
4500 ft
Time of Concentration =
30.00 min
*"NOTE: Minimum T allowed = 10 min.
2 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.806
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.754
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
RESULT
Rainfall Intensity (I = 3.464 in /hr
QZ = 244.529 cfs
Rainfall Intensity (1 = 4.327 in /hr
Q = 305.457 cfs
Rainfall Intensity (I = 4.936 "' /hr
Q, o = 348.423 cfs
Rainfall Intensity ( = 5.675 in /hr
Q25 = 400.568 cfs
Rainfall Intensity ( = 6.249 /hr
F7_
so = 441.074 cfs
Rainfall Intensity (Iloo) = 6.746 in /h,
Q,00 = 476.160 cfs
Area 3
GENERAL INFORMATION
Description: Pre - Development Drainage Area 3
Drainage Area = 68.87 acres
GIVEN
Velocity of Runoff = 1.50'7...
Coefficient of Runoff = 0.51
Maximum Travel Distance = 4500 ft
Time of Concentration = 50.00 min
" *NOTE: Minimum T allowed= 10 min.
2 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.81
Coefficient (b) = 65
Coefficient (d) = 8
5 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.785
Coefficient (b) = 76
Coefficient (d) = 8.5
10 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.763
Coefficient (b) = 80
Coefficient (d) = 8.5
25 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.754
Coefficient (b) = 89
Coefficient (d) = 8.5
50 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.754
Coefficient (b) = 98
Coefficient (d) = 8.5
100 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.73
Coefficient (b) = 96
Coefficient (d) = 8
RESULT
Rainfall Intensity (1 = 2.464 in1 hr
Q7=- 87.256 cfs
Rainfall Intensity (I5) = 3.116 'n /hr
Q = 110.357 cfs
Rainfall Intensity ( 1 10) = 3.587 in /hr
Q, = 127.044 cfs
Rainfall Intensity ( 1 25) = 4.140 in /hr
Q2s = 146.608 cfs
Rainfall Intensity ( 1 50) = 4.558 n th,
Fs; = 161.434 cfs
Rainfall Intensity ( 1 100) = 4.954 in /hr
Foo = 175.458 cfs
Total Area
GENERAL INFORMATION
Description: Pre - Development Drainage Total
Total Drainage Area = 591.14 acres
GIVEN
Composite Velocity of Runoff = 3.57 " / 5eC
Composite Coeffcient of Runoff = 0.51
Composite Travel Distance = 5748.80 ft
Composite Time of Concentration = 29.03 min
"NOTE: Minimum T allowed = 10 min.
2 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.800
Coefficient (b) = 68
Coefficient (d) = 7.9
5 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.771
Coefficient (b) = 73
Coefficient (d) = 7.7
10 YEAR FREQUENCY CONSTANTS
RESULT
Rainfall Intensity (I = 3.790 in /hr
Q = 1154.057 cfs
Rainfall Intensity (1 = 4.537 in /hr
Q7=- 1381.378 cfs
Coefficient (e) = 0.757
Coefficient (b) = 81
Coefficient (d) = 7.7
25 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.728
Coefficient (b) = 82
Coefficient (d) = 7.7
50 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.736
Coefficient (b) = 92
Coefficient (d) = 7.7
100 YEAR FREQUENCY CONSTANTS
Coefficient (e) = 0.712
Coefficient (b) = 92
Coefficient (d) = 7.9
Rainfall Intensity ( 1 10) = 5.294 in /hr
Q To = 1612.072 cfs
Rainfall Intensity ( 1 25) = 5.950 in /h,
Q25 = 1811.748 cfs
Rainfall Intensity ( 1 50) = 6.486 in /hr
Q57 1974.931 cfs
Rainfall Intensity ( 1 100) = 7.044 in /hr
F,oa = 2145.023 cfs
Project Manager: Greg Taggert 4/29/2005
Job # 000776 -3596 Calculations: Ben, Mark, Preston