HomeMy WebLinkAboutStaff Review Comments STAFF REVIEW COMMENTS NO. 1
Project: PUTZ -MEYER PLACE SUBDIVISION (MP) - 04- 00500122
ENGINEERING
1. Please remove the word 'Master' from the plat. We do not have a 'Master
Preliminary Plat' any longer; please title this plat 'Preliminary Plat'. Please also fill
out an application for Preliminary Plat. The Application submitted was for a Master
Plan.
2. Please show a joint access easement for shared access between Lot 1, Block 1 of
the Putz tract and the Richard Smith Tract to the west. Private issues concerning
this access may be worked out in private agreements between property owners. In
addition, signal modification may be required according to City Ordinance; this
would be at the Developer's expense.
3. Please show floodplain as Zone A.
4. Please provide estimated BFE.
5. Please remove 'Detention Synopsis', this synopsis cannot be approved at this time.
6. The proposed water line shown on Lot 1 and Lot 3R to the east will require an off -
site easement.
7. You have provided a note stating 'Tie proposed 12" water line to existing 8" line'. In
relation to this note, where does the tie -in occur?
8. Please show utilities and platting information on Lot 17 / 18 Block C of the Lincoln
Place Subdivision area (including all easements).
9. Please note that there are sewer lines that extend to the property edge from the
Lincoln Place Subdivision that may interfere with proposed water line separation.
10. Please see 6 -C.5.7 of the Subdivision Regulations as it relates to the required
pipeline information.
11.It may be possible for Lot 2, Block 1 to take one access from Lincoln Avenue,
depending on location and separation.
12.In order to plat Lot 1, Block 2, the structure shown within the setback area and
P.U.E. may need to be removed.
Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 5/18/04
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser pole(s). Developer installs first
10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design. (pull boxes provided by
the city).
Home of Texas A &M University
5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. Email to
rbolin @cstx.gov.
6. Developer provides load data for project.
7. Developer installs street lighting per city specs and design.
8. Developer provides temporary blanket easement for construction purposes.
9. Developer provides easements for electric infrastructure as installed for electric lines
(including street lighting).
10. Please provide a 10' P.U.E. on Lot 1, Block 1 from F.M. 60 to Lot 2, Block 1.
Reviewed by: Ronnie Bolin Date: May 18, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
3 of 3
STAFF REVIEW COMMENTS NO. 2
Project: PUTZ -MEYER PLACE SUBDIVISION (PP) - 04- 00500122
ENGINEERING
1. Additional easement may be required for the water line proposed along the western
property line due to separation requirements from existing sewer lines/ manholes.
2. The design and alignment of the driveway off University Drive will be approved at
the time of site plan. Signalization may be required with development.
3. The connection to the 18" water line may or may not be required depending on
future development of the R -1 portion of the property and the required fire flows that
will be needed at that time. A connection to the 12 -in water line along University
Drive would preclude the need to bore Lincoln Avenue.
4. A study is required to determine the BFE on Lot 1.
5. The sewer line on the west side is an older VCP. The impact of development over
this line must be considered in development plans.
6. Again, utilities shown on the Preliminary Plat are only to show one, feasible scenario
for development. A Final Plat will require construction documents for water for Lot
1.
Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 8 -24 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
2 of 2
STAFF REVIEW COMMENTS NO. 1
Project: PUTZ -MEYER PLACE SUBDIVISION (MP) - 04- 00500122
ENGINEERING
C� - . Please remove the word 'Master' from the plat. We do not have a 'Master
Preliminary Plat' any longer; please title this plat 'Preliminary Plat'. Please also fill
out an application for Preliminary Plat. The Application submitted was for a Master
Plan.
Cold _ Please show a joint access easement for shared access between Lot 1, Block 1 of
the Putz tract and the Richard Smith Tract to the west. Private issues concerning
this access may be worked out in private agreements between property owners. In
addition, signal modification may be required according to City Ordinance; this
; a te „ would be at the Developer's expense.
: , \ Please show floodplain as Zone A.
-v."... Please provide estimated BFE.
. =i . - &. Please remove 'Detention Synopsis', this synopsis cannot be approved pproved at this time.
:! r•, ty.,. c,Ahe proposed water line shown on Lot 1 and Lot 3R to the east will require an off -
site easement.
2L\-- -- ". You have provided a note stating 'Tie proposed 12" water line to existin018" line'. In
-po , .I '' ° �'ielation to this note, where does the tie -in occur? At- Z" 4-1V
��M Please show utilities and platting information on Lot 17 / 18 Block C of the Lincoln
t Place Subdivision area (including all easements).
- i... ,, - ?''Pease note that there are sewer lines that extend to the property edge from the
Lincoln Place Subdivision that may interfere with proposed water line separation.
w "-N19. Please see 6 -C.5.7 of the Subdivision Regulations as it relates to the required
z_z..1 pipeline information.
�
t 1 ,fit m a y be possible for Lot 2, Block 1 to t'� ke one a ss from Lincoln Avenue,
d ending on location and separation. ' ��� 1a. .
f- 2- :_- 1 '1 order to plat Lot Block the structure shown within the setback area and
P.U.E. may need to b remov e
Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 5/18/04
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser pole(s). Developer installs first
10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design. (pull boxes provided by
the city).
fit i
Home of Texas A &M University
STAFF REPORT
Project Manager: Jennifer Prochazka Date: August 25, 2004
Email: jprochazka @cstx.gov
Item: Consideration, discussion, and possible action on a Preliminary Plat for
the Putz -Meyer Place Subdivision, consisting of 2 Tots on 14.7 acres, generally
located along the southern side of University Drive, across from the intersection
of University Drive and Tarrow Street East. (04 -122)
Applicant: David Scarmardo, agent for property owner Alice Putz
Staff Recommendations: Staff recommends approval of the Preliminary Plat
with the condition that the attached Staff Review Comments are addressed.
Item Summary: This item is for consideration of a Preliminary Plat in
preparation for commercial development of Lot 1, Block 1. The rear of Lot 1
Block 1 will need to be rezoned prior to commercial development on that portion
of the property. Proposed future residential development of Lot 2, Block 1 will
require further platting of the property. The commercial property has frontage
on University Drive and the residential property will access Lincoln Avenue or
one of the side streets in the Lincoln Addition to the west.
The applicant has shown a proposed private joint access easement with the
adjoining commercial property to the west. This shared drive will align with the
current signalized intersection of University Drive and Tarrow Street East
This plat is in compliance with the Subdivision Regulations.
Comprehensive Plan Considerations: The property is currently zoned C -1
General Commercial and R -1 Single Family Residential. The Land Use Plan
designates the northern portion of this property, and the majority of the
surrounding area, as Retail Regional. The southern portion of the property is
shown for High Density Single Family. University Drive is shown as a Major
Arterial and Lincoln Avenue is shown as a Major Collector on the Thoroughfare
Plan.
Item Background: The property was annexed in 1956 and zoned R -1 Single
Family Residential at that time. According to our historical zoning maps, this
property was rezoned from R -1 to C -1 General Commercial sometime prior to
1972. In 1992, the City initiated rezoning to C -B Commercial Business and
applied the OV Overlay District along this portion of University Drive. With the
adoption of the UDO in 2003 the C -B district was eliminated and this property
was rezoned to C -1. This property has never been platted.
Budgetary & Financial Summary: N/A
Related Advisory Board Recommendations: N/A
Commission Action Options: The Commission has final authority over the
preliminary plat. The options regarding the final plat are:
• Approve
• Deny
Supporting Materials:
1. Location Map
2. Aerial
3. Application
4. Infrastructure and Facilities
5. Staff Review Comments No. 2
6. Copy of Preliminary Plat
INFRASTRUCTURE AND FACILITIES
Water required for plat: Lot 2 has access to a 12 -in water main along
Lincoln as well as water along Wellesly and Vassar. Lot 1 must extend
water along University Drive and/ or from Lincoln. A Water Report is
required with development to demonstrate compliance with City design
criteria. Utility extensions shown on the Preliminary Plat only
demonstrates that service is possible.
Water Service: Domestic water and fire service to be provided as
needed for development for each structure.
Sewer required for plat: Each tract has access to the public sanitary
system. A Sewer Report is required to demonstrate compliance with
City design criteria and downstream capacity.
Sewer Service: As development occurs, service is required to each
structure.
Street(s) required for plat: No street is required for the lot layout as
shown.
Streets /Access: Access to Lot 1 is to University Drive at the signalized
intersection. Access to Lot 2 may be feasible from Lincoln, depending
on spacing requirements. Access may be to Wellesley or Vassar.
Off -site Easements required for plat: None know to be needed at this
time.
Drainage: Drainage of the site is predominately to the drainage structure
under University Drive.
Flood Plain: The area at the entrance to the culvert under University
Drive is FEMA floodplain, Zone A. The developer must submit a report
to establish the Base Flood Elevation (BFE). The BFE shown on the plat
is "proposed ". No report has been reviewed.
Oversize request: None at this time.
Parkland Dedication Fees: Lot 2 will be required to meet the City's
Parkland dedication requirements. The Parks Board has not reviewed
this site due to the fact that additional platting will be forth coming before