STAFF REVIEW COMMENTS NO. 1
Project: COMFORT SUITES (SP) — 04- 00500134
This is a Stop Review: This is an incomplete submittal. Please be aware that this
does not constitute a full site plan review. The following comments are a cursory review
to assist you with your next submittal.
PLANNING
1. Provide a general note that all roof and ground- mounted mechanical equipment
shall be screened from view or isolated so as not to be visible from any public right -
of -way or residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building architecture
and scale to maintain a unified appearance.
2. Please be aware that the subject property is located in the Corridor Overlay (OV)
District. See Section 5.8 Overlay Districts. Building colors, materials and elevations
will be required to be reviewed and approved prior to site plan approval. Please be
aware of the setbacks and signage for the Overlay District.
3. Please be aware of the Outdoor Light Standards in Section 7.10
4. Please be aware of Building Mass and Design in Section 7.9 D, 1.2.3
5. Please provide parking legend noting total number of dwelling units as well as total
square footage of any meeting rooms. The parking requirement for hotel /motel is
one parking space per dwelling and one parking space per 200 square feet for
meeting rooms.
6. Show dimension's on parking spaces.
7. Note on the site plan the zoning of the subject property as well as all abutting
parcels.
8. Show building setbacks on site plan.
9. Fire lanes are required a minimum width of 20 -ft.
10. Are fire hydrants proposed or existing? Please note.
11. Please shoe (FDC) Fire Department Connection.
12. Please show curb and pavement detail.
LAN DSCAPING /STREETSCAPING /BUHER
13. Provide a general note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands, swales and
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 4
drainage areas, the parking lot setback, rights -of -way, and adjacent property
disturbed during construction.
14. Per Section 7.6 C Landscape required in the buffer cannot count toward the
landscape point requirement. It appears that an existing tree was being counted for
barricaded pints toward the landscape calculation. This will require more plantings
out side of the buffer to meet the required point calculations.
15. The buffer area is short one canopy tree (18- required, 17- provided).
Reviewed by: Jennifer Reeves Date: 05 -27 -04
ENGINEERING
1. Construction documents required for public fire water line. Refer to BCS Unified
Design Guidelines and Specifications.
2. Public fire line to building required to be in a PUE.
3. Water design report required.
4. Provide water and sewer demands.
5. Make sure domestic and irrigation meters are located within the easement.
6. Private sewer service to meet building code.
7. Please refer to the Drainage Policy and Design Manual for all requirements for
complete Drainage Report submittal.
8. Are you planning to sheet flow all of the runoff to the detention basin?
Reviewed by: Carol Cotter Date: 05 -27 -04
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes per city specs and design.(pull boxes
provided by the city).
5. Developer provides digital AutoCAD version 2000 of plat and /or site plan.
email to tmichalsa- cstx.gov
6. Developer provides load data for project email to tmichals(a-cstx.gov
7. Developer provides temporary blanket easement for construction
purposes.
1. Developer provides easements for electric infrastructure as installed.
2. Electric design plan may vary due to which project is constructed first. Comfort
Suites or Buffalo Wild Wings. Contact Tony Michalsky at (979- 764 -3438) with
questions.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 3 of 4
3. College Station Utilities will provide Electric Distribution design plan to developer
for installation of electric infrastructure. Contact Tony Michalsky at (979- 764 -3438)
for copies.
Reviewed by: Tony Michalsky Date: 5 -26 -04
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a
Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow
Device, and installed as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 4 of 4
STAFF REVIEW COMMENTS NO. 2
Project: COMFORT SUITES (SP) - 04- 00500134
THIS IS A STOP REVIEW: Due to the following comments, this site may
require significant site changes. Please be aware that this does not
constitute a full site plan review. The following comments are a cursory
review to assist you with your next submittal.
PLANNING
1. As previously stated in the first set of comments: Provide a general note that
all roof and ground- mounted mechanical equipment shall be screened from
view or isolated so as to not be visible from any public right -of -way or
residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building
architecture and scale to maintain a unified appearance. This was not
provided on the site plan (C1.1)
2. Please provide the square footage of the meeting /overflow rooms as part of
the parking legend. Please provide number of required parking spaces as
well as provided number of parking spaces.
3. The property lines on sheet C1.1 and LS.1 do not match up. For example:
The peripheral parking spaces adjacent to Lot 3F are shown on sheet LS.1 to
be two feet from the property line and on sheet C1.1 to be five feet from the
property line. The side walks around the building are shown to be six feet
wide on the sheet LS.1 and 5 feet wide on sheet C1.1. Please be aware that
these plans must match. ADA requires 44- inches of clearance so if the side
walk is five feet with a two foot overhang from the parking spaces then ADA
is not being met. Please adjust accordingly.
4. The building setback lines are not delineated on sheet C1.1 Please show the
building setback lines.
5. Fire lanes are required to be 20 -feet in width. You are not providing the 20-
width all the way around the building. Only 15 -feet of width is being provided
for 143 -feet along the rear of the building.
6. This building is required to be sprinkled and therefore must provide a (FDC)
Fire Department Connection.
7. Access easement from University Drive must me painted and marked fire
lane. Please show these markings on the site plan.
8. Sanitation requires 20 -foot minimum drive aisle width all the way around the
building.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
2 of 4
LANDSCAPE
9. Please edit irrigation note to say: Irrigation plans must be reviewed, approved
and installed prior to C.O.
10. Please provide shrub species name that is going into the buffer. Please be
aware that 50% of the shrubs must be an evergreen species.
Reviewed by: Jennifer Reeves
Date: 06 -30 -04
ENGINEERING
1. Sheet C2.2 was not submitted.
2. The scales given on Sheets C3.1 to C3.6 are not correct. What is scale of
Sheet 2.3.
3. The water line to be extended from the 12 -inch line along University Drive is
an 8 -inch line. Please revise drawings and water design report.
4. Please show current lot configuration. Lot 3D was replatted into a larger Lot
3D -R.
5. Verify that a retaining wall is not required in those areas of grade change
between adjacent properties.
6. Add to the Erosion Control Plan a construction exit or another method to
keep dirt off driveway and University Drive.
7. Off -site easement is required for extension of water line from existing 6 -inch
line.
8. Show proposed grades on profiles. You may not have required 4 -foot cover.
9. Sheet C3.1 calls out an 8" Sanitary Sewer; however, Sheet C3.2 shows a 6-
inch. Please rectify. (Manholes are not required on 6 -inch private service
lines. Per Building Code, minimum slopes for private 6 -inch and 8 -inch
service lines are 1 % and .5 %, respectively.)
10. Please refer to TCEQ regulations for waterline crossings over existing non -
pressure rated sewer mains.
11. Station Fire Hydrants.
12. Verify that fittings called out are the same on all Sheets. There is a 90 and
22 Y2 called out on Sheet C3.5, but a 45 and 22 Y2 is called out on Sheet
C3.6.
13. Plan and Profile are required for the fire line to the building.
14. Add note that all water and sewer construction to be in accordance with BCS
Unified Design Guidelines and Standard Specifications and Details.
15. Provide Exhibits listed in Drainage Report.
Reviewed by: Carol Cotter Date: 07 -06 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
3 of 4
cc: College Station Lodging Partners, LP (Mr. Victor Patel)
Via Fax: (972) 570 -7421
Shane Sigrist, RSS Architects, LLC
Via Fax: (817) 649 -8410
Case file #04- 00500134
STAFF REVIEW COMMENTS NO. 2
Project: COMFORT SUITES (SP) - 04- 00500134
This is a Stop Review: Due to the following comments the site may be required
significant site changes. Please be aware that this does not constitute a full site
plan review. The following comments are a cursory review to assist you with
your next submittal.
PLANNING
1. As previously stated in the first set of comments: Provide a general note that
all roof and ground- mounted mechanical equipment shall be screened from
view or isolated so as not to be visible from any public right -of -way or
residential district within 150' of the subject lot, measured from a point five
feet above grade. Such screening shall be coordinated with the building
architecture and scale to maintain a unified appearance. This was not
provided on the site plan (C1.1)
2. Please provide the square footage of the meeting /overflow rooms as part of
the parking legend. Please provide number of required parking spaces as
well as provided number of parking spaces.
3. The property lines on sheet C1.1 and LS.1 do not match up. For example:
The peripheral parking spaces adjacent to Lot 3F are shown on sheet LS.1 to
be two feet from the property line and on sheet C1.1 to be five feet from the
property line. The side walks around the building are shown to be six feet
wide on the sheet LS.1 and 5 feet wide on sheet C1.1. Please be aware that
these plans must match. ADA requires 44- inches of clearance so if the side
walk is five feet with a two foot overhang from the parking spaces then ADA
is not being met. Please adjust accordingly.
4. The building setback lines are not delineated on sheet C1.1 Please show the
building setback lines.
5. Fire lanes are required to be 20 -feet in width however 20 -width is not
available all the way around the building. Only 15 -feet of width is being
provided for 143 -feet along the rear of the building.
6. This building is required to be sprinkled and therefore must provide a (FDC)
Fire Department Connection.
7. Access easement from University Drive must me painted and marked fire
lane. Please show these markings on the site plan.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
2 of 3
8. Sanitation requires 20 -foot minimum isle width all the way around the
building.
LANDSCAPE
9. Please edit irrigation note to say: Irrigation plans must be reviewed, approved
and installed prior to C.O.
10. Please provide shrub species name that is going into the buffer. Please be
aware that 50% of the shrubs must be an evergreen species.
Reviewed by: Jennifer Reeves Date: 06 -30 -04
ENGINEERING
1.
Reviewed by: Carol Cotter Date: 06 -30 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
3 of 3
Case file #04- 00500134
STAFF REVIEW COMMENTS NO. 3
PLANNING
Project: COMFORT SUITES (SP) - 04- 00500134
1. All curbing must be monolithic.
2. The 25' front setback is incorrectly dimensioned.
3. If the retaining walls are made of "raw concrete" and will be visible from any
adjacent property, they will be required to be screened.
4. Please also show the proposed PUE for the fire line on the site plan.
5. Please make a note that all paved areas on site are surrounded by a 6" monolithic
curb.
Reviewed by
ENGINEERING
1
2
3
4
5
6
7.
8.
9.
10
11
12
13
14
15
Jennifer Prochazka
Date: July 26, 2006
Provide documentation to support that existence of the 65' public access and utility
easement.
It appears that additional retaining wall is required along a portion of the northeast
property line. Contours on the adjacent property have not been provided on the
drawings, but the City's GIS shows elevations that may not be attained with 3:1
slopes.
The retaining wall as designed will not be allowed in the PUE. As previously
discussed, either pull parking out of easement or provide a design that does not
require a footing in the PUE.
Detention pond requires a sloped bottom and trickle channel.
Orient the detention pond discharge so that it is not projecting out into the alley.
How are you ensuring that the discharge makes it to the drainage creek? Will any
downstream grading be required?
Scales provided on Sheets 3.1 through 3.5 are incorrect.
The plans and profiles submitted are small and hard to read. Please enlarge scale.
Station all fittings.
Waterline is shown to be located under retaining wall and detention basin wall. This
is not allowed.
Minimum cover for public water line is 4 feet.
Add note to water line plan and profile sheets referring to "General Notes for Water
Line Construction" or call out TCEQ requirements.
Show sewer conflict on Sheet C3.4.
Details provided do not match BCS Unified details.
Please provide detention pond routing as part of drainage report.
Reviewed by: Carol Cotter Date: July 29, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 3
Case file #04- 00500134
STAFF REVIEW COMMENTS NO. 3
Project: COMFORT SUITES (SP) - 04- 00500134
PLANNING
1. All curbing must be monolithic.
2. The 25' front setback is incorrectly dimensioned.
3. If the retaining walls are made of "raw concrete" and will be visible from any
adjacent property, they will be required to be screened.
4. Please also show the proposed PUE for the fire line on the site plan.
5. Please make a note that all paved areas on site are surrounded by a 6" monolithic
curb.
Reviewed by: Jennifer Prochazka Date: July 26, 2006
ENGINEERING
1. Provide documentation to support that existence of the 65' public access and utility
easement.
2. It appears that additional retaining wall is required along a portion of the northeast
property line. Contours on the adjacent property have not been provided on the
drawings, but the City's GIS shows elevations that may not be attained with 3:1
slopes.
3. The retaining wall as designed will not be allowed in the PUE. As previously
discussed, either pull parking out of easement or provide a design that does not
require a footing in the PUE.
4. Detention pond requires a sloped bottom and trickle channel.
5. Orient the detention pond discharge so that it is not projecting out into the alley.
6. How are you ensuring that the discharge makes it to the drainage creek? Will any
downstream grading be required?
7. Scales provided on Sheets 3.1 through 3.5 are incorrect.
8. The plans and profiles submitted are small and hard to read. Please enlarge scale.
9. Station all fittings.
10. Waterline is shown to be located under retaining wall and detention basin wall. This
is not allowed.
11. Minimum cover for public water line is 4 feet.
12. Add note to water line plan and profile sheets referring to "General Notes for Water
Line Construction" or call out TCEQ requirements.
13. Show sewer conflict on Sheet C3.4.
14. Details provided do not match BCS Unified details.
15. Please provide detention pond routing as part of drainage report.
Reviewed by: Carol Cotter Date: July 29, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 3
STAFF REVIEW COMMENTS No. 4
Project: COMFORT SUITES (SP) - 04- 00500134
PLANNING
The following comments were made on the previous review ( 0). These
comments were added to sheet C1.1 site plan, please add these comments to
Sheet A -01 architectural site plan.
1. All curbing must be monolithic.
2. The 25' front setback is incorrectly dimensioned.
3. If the retaining walls are made of "raw concrete" and will be visible from any
adjacent property, they will be required to be screened.
4. Please also show the proposed PUE for the fire line on the site plan.
5. Please make a note that all paved areas on site are surrounded by a 6"
monolithic curb.
Reviewed by: Jennifer Reeves Date: 08 -25 -04
ENGINEERING
1. Sheet C2.1 - It does not appear that the grading in the northeast corner of the
property will allow the flow to be routed to the detention pond. Please check
grades.
2. Sheet C2.1 - Minimum PUE width is 15 feet. The FS Line shows a proposed 10'
PUE.
3. Sheet C3.1 — A 15' PUE is called out near the northeast corner of the site, but
no easement is delineated. Are you planning and easement? If you are
proposing the easement, then why not avoid the sewer crossings and relocate
line in the proposed easement.
4. Sheet C3.1 — If your water report shows that an 8" water line is required off the
existing 6" line, then change tee to 6x8.
5. Sheet C3.1 - You show an 8x8 tee and 8x6 reducer on the fire hydrant located
at the front to the building. Isn't this already a 6" line?
6. Show limits of required structural backfill, or note where it is required.
7. Please specify the pipe material for water line.
8. Sheet C3.3 — Plan view shows 6 -inch Fire Supply Line; however, the profile
shows a 3 -inch line. Please verify that a 6 -inch line is not needed for the type of
building being constructed and revise drawing.
9. Sheet C3.3 — Plan view shows a 8x8 tee for the fir hdrant at the forn of the
building, but the profile shows a 90 bend. Rectify.
10. Sheet C3.3 — 3 -inch PVC is required to be SDR 21, ASTM D241.
11. Sheets C3.3— Add TCEQ requirements to water /sewer line crossings.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 3
12. Sheets C3.4 and C3.5 — Show sewer line conflicts and add TCEQ requirements
to all water /sewer line crossings. In addition, you do not have 9' separation
between the lines for a portion of the run.
13. Sheet C3.4 — Is Fire Supply line 6 -inch or 3 -inch?
14. Sheet C3.5 — A 3 -inch domestic meter requires a meter vault assembly. See
BCS Unified Detail W3 -00.
15. Sheet C3.6 — Station fire hydrant assembly. It is not shown on profile.
16. As previously commented, details provided do not match BCS Unified details.
17. As previously commented, please provide detention pond routing as part of
drainage report.
Reviewed by: Carol Cotter
Date: August 24, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
3 of 3
STAFF REVIEW COMMENTS NO. 5
Project: COMFORT SUITES - UNIVERSITY (SP) - 04- 00500134
PLANNING
1. As previously stated in Staff Review Comments #1: Please be aware that the
subject property is located in the Corridor Overlay (OV) District. See Section 5.8
Overlay Districts. Building colors, materials and elevations will be required to be
reviewed and approved prior to site plan approval. Please be aware of the setbacks
and signage for the Overlay District.
2. As previously stated in Staff Review Comments #4: The following comments were
made on the previous review ( #3). These comments were added to sheet C1.1 site
plan, please add these comments to Sheet A -01 architectural site plan.
It appears that sheet A -01 was not turned in. Please be aware that when the
building plans (Architectural Plans) are turned in they will need to reflect the
following comments.
• All curbing must be monolithic.
• The 25' front setback is incorrectly dimensioned.
• If the retaining walls are made of "raw concrete" and will be visible from
any adjacent property, they will be required to be screened.
• Please also show the proposed PUE for the fire line on the site plan.
• Please make a note that all paved areas on site are surrounded by a 6"
monolithic curb.
Reviewed by: Jennifer Reeves Date: 08 -31 -04
ENGINEERING
1. Sheet C1.1 — Will you be dedicating an off -site PUE for the construction of the 8"
waterline, or are you stating that there is an existing 65' PUE? You show both. If
you are dedicating one, the off -site easement will be required prior to Site Plan
approval.
2. Sheet C2.1 - It appears that additional retaining wall is required along a portion of
the northeast property line. Contours on the adjacent property have not been
provided on the drawings, but the City's GIS shows elevations that may not be
attained with 3:1 slopes. Please verify.
3. Sheet C2.2 — The bottom elevation of the detention pond is shown as 302.47 all
around the bottom; however, a 1/8" per foot slope is called from the 302.47
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 3
elevations to the trickle channel. If the outlet is at 302.47, how will the pond drain
dry? There should also be a trickle channel from the pond inlet to the trickle
channel already shown.
4. Sheets 3 Series — BCS Unified Design guidelines call for valves on 2 legs of every
tee. At a minimum, please add a valve to the fire line, add a valve to the 8' line in
the access drive from University, and add a valve to the 6" line north of the fire
hydrant on the west side of the building.
5. Sheet C3.3 — Waterline crossing under wastewater main shall be ductile iron pipe
per TCEQ regulations and as stated in General Notes on Sheet 4.2.
6. Sheet C3.5 — It is hard to tell, but there should not be a PUE over the domestic
service to the building. You just need to make sure that the meter is in the
easement.
7. Structural backfill is required for utilities under pavement including sidewalks. I can't
tell from what was added to Sheet C2.1 if this covers that. Contractor needs to
know that structural backfill is required for utilities under pavement.
8. The pond routing that has been previously requested is the elevation in the pond
resulting from the associated inflow and outflow.
9. A sealed Engineer's Construction Estimate is required for all public infrastructure.
Reviewed by: Carol Cotter Date: September 9, 2004
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
3 of 3
STAFF REVIEW COMMENTS NO. 7
Project: COMFORT SUITES - UNIVERSITY (SP) - 04- 00500134
PLANNING
N
3
The existing 30 -inch Post Oak that is being counted for barricaded points was not
barricaded during construction and there is a retaining wall that has been constructed within
the drip line of the tree, therefore protected points cannot be accumulated for this tree.
Please see Section 7.5.C. of the Unified Development Ordinance (UDO).
Section 7.5.2.a. Plant Material Point Value: to receive 10 points for a shrub, the shrub has to
be at least 5- gallons in size.
Section 7.5.4. "Every project must expend a minimum of 50% of its point total on canopy
trees. The total points required for this site is 2,610, this would require a minimum of 1,305
points that need to be accrued by canopy trees. Currently only 900 points are being
provided with the proposed. (6) Live Oaks.
Reviewed by: Jennifer Reeves Date: 10 -05 -05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review. 2 of 2
August 30, 2004
Mrs. Jennifer Reeves
Project Manager
City of College Station
Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Re: Staff Review Comments No. 4
Comfort Suites — 04- 00500134
College Station, Texas
Job No.: 03 -0100
Dear Mrs. Reeves:
C
Gessner
Engineering
The following is a written description of the revisions made to the contract documents of
the above mentioned project. These revisions were made to address Staff Review
Comments No. 4 from the City of College Station Development Services. Items addressed
are Engineering comments from Mrs. Carol Cotter.
1. Sheet C2.1 — Grading in the northeast corner of the property has been revised to
provide positive drainage to the detention facility.
2. Sheet C2.1 — The PUE shown as 10 feet in width was a proposed extension of an
existing 10 foot wide easement. The proposed easement has been adjusted to the
required 15 foot width.
3. Sheet C3.1 - The easement in the northeast corner is a 10 foot expansion of an
existing easement. The waterline will be placed in the expanded easement, thus
eliminating the sewer crossings.
4. Sheet C3.1 — The tee has been changed to a 6x8.
5. Sheet C3.1 — The 8x8 tee and 8x6 reducer connections have been corrected forthe
6 inch line.
6. Limits of required structural fill are noted on the site grading plan C2.1.
7. Pipe material for water lines is noted on line profiles.
8. Sheet C3.3 — A 6 inch line is required to the building for the fire supply line. Line
size has been changed to reflect a 6 inch line.
9. Sheet C3.3 — The plan and profile has been corrected to reflect the 90 degree bend
required at this location.
10. Sheet C3.3 — The fire supply line is no longer a 3 inch line. A 3 inch line is required
for the service line on the north side of the building. This line is specified as SDR
21, ASTM D241.
11. Sheet C3.3 — Sewer / water lines no longer cross. TCEQ requirements have been
added to the notes page on sheet C4.1.
12. Sheets C3.4 and C3.5 — Water line has been moved to avoid conflicts. In addition,
1712 Southwest Parkway, Suite #105, College Station, Texas 77840 • P.O. Box 10763, 77842 -0763 • 979.680.8840 • FAX 979.680.8841
1400 South Austin Street, Brenham, Texas 77833 •979.836.6855 • FAX 979.836.6847
'�qw
-1
3D
www.CessnerEngineering.com 64.1
a minimum of 9 feet of separation is being maintained along the length of the lines.
TCEQ requirements have been added to the notes page on sheet C4.1.
13. Sheet C3.4 — Fire supply line is a 6 inch line.
14. Sheet C3.5 — The 3 inch domestic meter has been specified with a meter vault
assembly as per BCS Unified Detail W3 -00.
15. Sheet C3.6 — The fire hydrant assembly has been added to the profile.
16. Sheet C4.2 — Notes have been added which reference specific details to the
corresponding BCS Unified Detail. Conflicting details have been removed from the
contract documents.
The Figure depicting the pond detention routing has been enclosed for addition to Exhibit
"D" of the drainage report as requested.
Thank you in advance for the expedited review of these drawings, and your cooperation on
this project. If you have any questions, please do not hesitate to contact me.
Sincerely, ��° ;.• ••;s �')
G. ROGERS
Alt G. Ro rs, •.: X 5083 -'0 � "o
NS. /
ss O EN
Gessner Engineering
D4 - [ �34+
September 13, 2004
Mrs. Jennifer Reeves
Project Manager
City of College Station
Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Re: Staff Review Comments No. 5
Comfort Suites — 04- 00500134
College Station, Texas
Job No.: 03 -0100
Dear Mrs. Reeves:
Gessner
Engineering
The following is a written description of the revisions made to the contract documents of
the above mentioned project. These revisions were made to address Staff Review
Comments No. 5 from the City of College Station Development Services. Items addressed
are Engineering comments from Mrs. Carol Coffer.
4/ Sheet C1.1 — An off -site PUE will required for the construction of the eight (8) inch
waterline that will extend from the southeast comer of the property into the sixty -five
(65) wide PAE. The PUE for the existing waterline actually exists within the PAE
and is located twenty -seven (27) feet east of the property line for the Comfort Suites
� site.
( 2J Sheet C2.1 —Spot ground elevations have been added to this sheet along the east
�- property line to depict the ground elevation. The retaining wall has been extended
to the north to accommodate the pavement and the existing ground elevation
differential.
Sheet C2.2 - The bottom elevation of the detention pond has been revised to depict
the 1/8 inch slope denoted upon the plan. In addition the trickle channel has been
extended to the pond inlet.
4. Sheet 3 Series —Additional gate valves were added at the six (6) inch fire line to the
building, at the access drive to the property where water service is provided and
north of the fire hydrant on the west side of the building.
5. Sheet C3.3 — The waterline crossing under the wastewater main has been denoted
as ductile iron pipe as per the TCEQ requirements.
6. Sheet 3.5 — The PUE extends towards the building at the domestic service so that
the meter vault is constructed out of the drive. The proposed meter valve shall be
constructed in the area behind the curb.
7. Sheet 3.1 - A note indicating that all utilities constructed under pavement including
sidewalks shall be constructed of structural backfill as defined by the BCS Unified
Development specifications.
1712 Southwest Parkway, Suite #105, College Station, Texas 77840 • P.O. Box 10763, 77842 -0763 • 979.680.8840 • FAX 979.680.8841
1400 South Austin Street, Brenham, Texas 77833 •979.836.6855 • FAX 979.836.6847
www.GessnerEngineering.com
8. A graph depicting the elevation in the pond resulting from the associated inflow and
outflow is attached as requested.
9. A sealed Engineer's estimate is attached for the proposed public infrastructure
added by this project.
Thank you in advance for the expedited review of these drawings, and your cooperation on
this project. If you have any questions, please do not hesitate to contact me.
�EOF Tcc - '
Sincerely, ,�°'°�;A "...•qf
� ALTON G. ROGERS
f ' 50333 • Q
Alton G- R9,9�rs, P. p °�• ° �� °. °��
EN
®® SS�ONAL 0
Gessner Engineering
June 21, 2004
City of College Station Development Services
P.O. Box 9960
College Station, TX 77842
Re: Comfort Suites Site Plan Review
Job # 03 -0100
Dear Sirs:
CP
Gessner
Engineering
This letter is in response to the staff review of the Comfort Suites site plans
submitted by Gessner Engineering. Please note that the original Sheet C1.2
(Utility Plan) submitted to the City of College Station is designated as Sheet 3.1
in this submittal. The full civil construction plans are provided for your review.
The following list addresses the staff review comments from your Memorandum
of May 27, 2004.
PLANNING
k1 . General note provided on sheet C1.1 stating all roof and ground- mounted
mechanical equipment shall be screened from view or isolated so as not
to be visible from any public right -of -way or residential district within 150'
of the subject lot, measured from a point five feet above grade.
J 2. Aware that the property is located in the Corridor Overlay District and
building colors, materials and elevations will be required to be reviewed
and approved prior to site plan approval. Also aware of the setbacks and
signage for the overlay district.
3. Aware of the Outdoor Light Standards in Section 7.10.
4 of Building Mass and Design in Section 7.9D, 1.2.3.
Parking legend noting total number of dwelling unit, meeting /overflow, and
handicap parking spaces are included on sheet C1.1.
6. Dimensions of parking spaces shown on sheet C1.1.
7. Note of zoning of subject property as well as all abutting parcels on sheet
C1.1.
Building setbacks shown on C1.1 t
Fire lane labeled at a width of 20 feet on Q
10. Fire hydrants marked proposed or existing on sheet C3.1.
Y'11. Fire Department Connection not shown since fire hydrant is on site.
12. Curb and pavement detail given on C4.2.
LAN DSCAPING /STREETSCAPING /BUFFER
J13. General note that 100% coverage of groundcover, decorative paving,
decorative rock, or a perennial grass is required in parking lot islands,
I - % --
1712 Southwest Parkway, Suite #105, College Station, Texas 77840 • P.O. Box 10763, 77842 - 0763.979.680.8840 • FAX 979.680.8841 n ,• 2O M
P
1400 South Austin Street, Brenham, Texas 77833 •979.836.6855 • FAX 979.836.6847 �/� T�
www.GessnerEnginecring.com L_o -2.1 - 1)4
Dy - I1ai-k
swales and drainage areas, the parking lot setback, rights -of -way, and
adjacent property disturbed during construction included on site C1.1 and
-/ LS -1.
1 Buffer area has the required 18 canopy trees as can be seen in LS -1.
ENGINEERING
1. The plan and profile for the domestic water and sanitary sewer lines are
provided for your review.
2. All public fire lines shall be placed in a fifteen (15) wide public utility
easement.
3. Water design report is enclosed with plans.
4. Water and sewer demands are 704 F.U. and 744 F.U., respectively.
5. Domestic and irrigation meters are located within easement.
6. Private sewer service meets building code.
7. Drainage report requirements are met as stated in the drainage policy and
design manual.
8. Sheet flow is planned to the detention pond at this time.
ELECTRICAL
1. Note provided that developer installs conduit per city specs and design on
sheet
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pads per city specs and design.
4. Developer installs pull boxes per city specs and design.
5. Developer provides digital AutoCAD version 2000 of plat and /or site plan.
6. Developer provides load data for project.
7. Developer provides easements for electric infrastructure
I trust this information will complete the submittal to your satisfaction. If you have
any questions with regards to this data, please contact me at (979) 680 -8840.
Sincerely,
All
•• • •s, '�
® ALTON G. ROGERS
Alt G. R er � 'P.•L ' • 5o833 ••• .' •
-0 .
�NA ENG?�
O
July 19, 2004
Ms. Bridgette George
Assistant Development Manager
City of College Station
P. O. Box 9960
College Station, Texas 77842 -9960
C;
Gessner
Engineering
Re: Site Plan
Comfort Suites Project
College Station Lodging Partners, LP
GE Job No.: 03 -0100
Dear Ms. George:
Enclosed for your review are two (2) sets of the revised the civil construction
plans and one (1) revised Landscape Plan associated with the Site Plan review
for this project. Specifically the items addressed are as follows:
PLANNING
1. Added general note with reference to screening of mechanical equipment on
Sheet C1.1.
2. Added square footage for meeting /overflow rooms to Sheet C1.1.
3. Adjusted parking lines at Lot 3F such that the Sheets C1.1 and LS -1 depict the
same layout and location of the parking.
4. Added building setback note and setback lines to Sheet C1.1.
5. Increased the fire lane to twenty (20) feet for the 143 feet length of lane at the
northeast portion of the site.
6. Provided a note for a Fire Department Connection along the east end of
Building on Sheet C1.1.
7. The access easement from University Drive is designated as a fire lane on
Sheet C1.1.
8. The sanitation requirement for 20 -foot minimum drive aisles is now provided
on Sheet C1.1.
1712 Southwest Parkway, Suite #105, College Station, Texas 77840 • P.O. Box 10763, 77842 -0763 •979.680.8840 • FAX 979.680.8841
1400 South Austin Street, Brenham, Texas 77833 •979.836.6855 •FAX 979.836.6847
www.GessnerEngineering.com
LANDSCAPE
/The irrigation note was edited to state: Irrigation plans must be reviewed,
approved and installed prior to C.O.
2. The name of the buffer shrub species was provided on Sheet LS -1.
ENGINEERING
1. Sheet C2.2 is enclosed.
2. The scale on sheet C2.3 has been added.
3. The water line to be extended along the access easement from University
Drive was revised to an 8 -inch line.
4. The new lot configurations are depicted for Lot 3D -R.
5. A retaining wall has been added along the grade change between the parking
and the property line as needed on Sheet C2.1.
6. A construction entrance was added to the Erosion Control Plan, Sheet C2.3.
7. The existing off -site easement was added to Sheet C1.1.
8. The proposed grades have been added to the profiles (Sheets C3.2 through
C3.6).
9. The sanitary sewer service line on Sheet C3.2 has been changed to a 6 -inch
line. In addition the manhole has been removed.
10. Notes were added to Sheet C4.1 with reference to TCEQ regulations for
waterline crossings.
11. The fire hydrants were stationed on Sheets C3.3 through C3.6.
12. All fittings have been verified.
13. The fire line to the building has been plan and profiled on Sheet C3.6.
14. A note was added to Sheet C3.1 that all water and sewer construction to be
in accordance with the BCS Unified Building Guidelines and Standard
Specifications and Details.
15. The exhibits for the drainage report were resubmitted for review.
I trust that these changes have addressed all of your concerns with regards to
the construction plans for this project. If you have further questions, please
contact me.