Loading...
HomeMy WebLinkAboutCost Estimate TEXCON GENERAL CONTRACTORS 06- May -04 ENGINEER'S COST ESTIMATE LIBERTY SUBDIVISION COLLEGE STATION, TEXAS SANITARY SEWER IMPROVEMENTS Item Estimated Unit Estimated No. Description Quantity Price Cost Sitework 1 Mobilization /Layout 1.0 LS $600.00 $600 2 Site Preparation 1.0 LS $800.00 $800 3 Construction Exit 1.0 LS $800.00 $800 4 Silt Fence 245 LF $2.50 $613 Subtotal $2,813 Sanitary Sewer Lines 5 8" SDR 26 Pipe - non -str; avg depth <8' 168 LF $20.00 $3,360 6 Manholes - average depth <8' 1 EA $2,000.00 $2,000 7 Connect to existing manhole 1 EA $500.00 $500 Subtotal $5,860 Total Sitework $2,813 Total Sanitary Sewer $5,860 TOTAL CONSTRUCTION' $8,6731 O k 1 = �cE r F �� i re" • • �B JOSEPH P. .4 U 4 . -0 • , 5 9 . I' 4, ' O'R 1 , ). • •;c! S E Ft • . ' v • A'�v �• I , S., -o' Page 1 of 1 TEXCON GENERAL CONTRACTORS 06 May - 04 ENGINEER'S COST ESTIMATE LIBERTY SUBDIVISION COLLEGE STATION, TEXAS SANITARY SEWER IMPROVEMENTS Item Estimated Unit Estimated No. Description Quantity Price Cost Sitework 1 Mobilization /Layout 1.0 LS $600.00 $600 2 Site Preparation 1.0 LS $800.00 $800 3 Construction Exit 1.0 LS $800.00 $800 4 Silt Fence 245 LF $2.50 $613 Subtotal $2,813 Sanitary Sewer Lines 5 8" SDR 26 Pipe - non -str; avg depth <8' 168 LF $20.00 $3,360 6 Manholes - average depth <8' 1 EA $2,000.00 $2,000 7 Connect to existing manhole 1 EA $500.00 $500, Subtotal $5,860 Total Sitework $2,813 Total Sanitary Sewer $5,860 TOTAL CONSTRUCTIONS $8,6731 OF i MC P ......... F -1 I *• •* I JOSEPH P. '4 U P -o • 5 9 ►.►: S V ff Page 1of1