HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: SOUTHWEST CROSSING PH 3 (FP- REPLAT) - 04- 00500123
ENGINEERING
1. The BCS Unified Design Guidelines call for ductile iron pipe for covers less than the
desired 6' cover, and, cement stabilized sand backfill for covers less than 3.5'.
Reviewed by: Carol Cotter for Spencer Thompson Date: May 24, 2004
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000 version of plat and /or site plan.
email to rbolin( cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 5 -12 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2