Loading...
HomeMy WebLinkAboutWastewater Design September 15, 2010 Mr. Stephen Maldonado Jr. City of College Station Water Services Department 1101 Texas Avenue College Station, TX 77842 Re: Wastewater Design Report Proposed College Station ISD Transportation Center 800 George Bush Drive College Station, Texas Gessner Engineering Job No.: 10 -0407 Dear Mr. Maldonado: The peak wastewater flow was calculated in accordance with the fixture count determination method. A total fixture unit count of 88 was determined for this building. This calculation was determined based on the fixture unit load factor given in Table I of the Sanitary Sewer Chapter of the Bryan /College Station Unified Design Guidelines. The values are shown below in Table One. Load Total Fixture Number Factor Value Lavatory 12 2 24 Dishwasher 2 2 4 Water Fountain 2 2 4 Urinals 2 4 8 Water Closets, 6 8 48 Valve Operated Total 88 Table One: Fixture Units Gessner The peak wastewater flow based on the fixture units is 125 gallons per Engineering minute for Tess than 500 fixture units. Using the Manning equation with an n value of 0.013, the velocity in all sections of the proposed sewer 25Ol Ashford Drive line were calculated as shown in Table Two below. Suite 102 Pipe Size Pipe Slope College Station, Texas 77840 Pipe Section (in) (oho) Pipe Velocity (ft/s) BLDG - TIE -IN _ 6 1.00 2.86 P.O. Box 10763, 77842 Table Two: Pipe Size, Slope and Velocity 979.680.8840 All pipe slopes are within the required range of minimum /maximum fax 979.680.8841 pipe slopes for sanitary sewer from the Bryan /College Station Unified Design Guidelines. 2204 S. Chappell Hill Street Brenham, Texas 77833 116979.836.6855 4 - 16 . 10 fax 979.836.6847 !Dig Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING, F -7451 -il \ I \ ,(+ 4 f Melissa P. Thomas, P.E. * i """ "'..'...• THOMAS / % • MELISSA ............: S ■ ti 98398 ' r Kyle M. Zapalac, M.E., E.I.T. i � o 4............0.1. � •st°0• �e sloLT_ 0 Gessner Engineering