HomeMy WebLinkAboutCost Estimate October 20, 2010
Mr. Josh Norton
City of College Station Engineering Department
1101 Texas Avenue
College Station, TX 77842
Re: Engineering Cost Estimate
Proposed Hillel Student Center
800 George Bush Drive
College Station, Texas
Gessner Engineering Job No.: 10 -0407
Dear Mr. Norton:
Based on current estimations for direct material and direct labor costs, the prime
cost of the public infrastructure for the above referenced project is estimated to
be $13,733. Values used to determine this estimate are included in the attached
table. This estimate does not include indirect costs due to overhead or indirect
manufacturing expenses.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLC F -7451
IYtU /
Melissa P. Thomas, P.E. t � r'.�EOF tE�'�t Lessner
)/ y Engineering
4 �
MELISSA P. THOMAS /
Kyle M. Zapalac, M.E., E.I.T. r 98398 / 2501 Ashford Drive
' ' �►�` I��Oir• J, Suite 102
Attached: Estimated Cost Table ‘ M, w
W College Station, Texas 77840
P.O. Box 10763, 77842
979.680.8840
fax 979.680.8841
2204 S. Chappell Hill Street
Brenham, Texas 77833
979.836.6855
fax 979.836.6847