Loading...
HomeMy WebLinkAboutCost Estimate October 20, 2010 Mr. Josh Norton City of College Station Engineering Department 1101 Texas Avenue College Station, TX 77842 Re: Engineering Cost Estimate Proposed Hillel Student Center 800 George Bush Drive College Station, Texas Gessner Engineering Job No.: 10 -0407 Dear Mr. Norton: Based on current estimations for direct material and direct labor costs, the prime cost of the public infrastructure for the above referenced project is estimated to be $13,733. Values used to determine this estimate are included in the attached table. This estimate does not include indirect costs due to overhead or indirect manufacturing expenses. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING, LLC F -7451 IYtU / Melissa P. Thomas, P.E. t � r'.�EOF tE�'�t Lessner )/ y Engineering 4 � MELISSA P. THOMAS / Kyle M. Zapalac, M.E., E.I.T. r 98398 / 2501 Ashford Drive ' ' �►�` I��Oir• J, Suite 102 Attached: Estimated Cost Table ‘ M, w W College Station, Texas 77840 P.O. Box 10763, 77842 979.680.8840 fax 979.680.8841 2204 S. Chappell Hill Street Brenham, Texas 77833 979.836.6855 fax 979.836.6847