HomeMy WebLinkAboutStaff Review Comments 1
STAFF REVIEW COMMENTS NO. 1
Project: WILLIAMSGATE (PP) - 04 -135
STOP REVIEW: The review of this plat has been stopped due to nonconformance
with platting requirements. A few comments have been provided below. This
review does not constitute a full review. Additional comments may follow.
ENGINEERING
1. Plat does not conform to existing zoning. Plat to be reviewed when rezoned.
2. Provide contours as required.
3. Please note, this project is required to provide a water report at Final Plat to
demonstrate fire flow capability per BCS Unified Guidelines and City Fire Code.
4. Please note, this project is required to provide a sewer report at Final Plat to
demonstrate the downstream sewer system has capacity per BCS Unified
Guidelines and TCEQ.
5. The proposed sewer lift station, if public, is to be designed per City requirements.
6. The proposed sewer lift station, if private, will require off-site easements. Any
needed off -site easements must be submitted with construction documents.
7. Water system must be designed per BCS Unified Guidelines. Please see
requirements for 6 -in water lines, 3 -in lines down cul -de -sacs, number of hydrants
on 6 -in line, etc.
8. Please show water service to Lots 7 and 8, Block 1.
9. Two Block 2s in Phase 2.
10. Please remove South and North from street name.
Reviewed by: Spencer Thompson Date: 5/1/04
PLANNING
1. Please identify the detention area as "Commons E ".
2. For common areas to exist, there must be a Homeowners Association. Please note
that Commons A -E will be maintained by the HOA.
3. In Phase 2, there are two "Block 2 "s.
4. Please show the updated City Limits line on the vicinity map.
5. Please identify the zoning of the property on the plat. Since this will be processed
after the current rezoning request has been considered, you may call it R -1 Single
Family Residential.
Reviewed by: Molly Hitchcock and Crissy Perez Date: May 27, 2004
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 2
Project: WILLIAMSGATE (PP) - 04 -135
ENGINEERING
1Sewer report is insufficien
- : for approval. Refer to BCS Unified Design Manual.
Demonstrate downstream impact. The sewer line shown as the discharge point
was designed as a Sewer Impact Fee line. Demonstrate how the proposed
system affects the impact fee line?
2. Water report is not in compliance with City design standards. Refer to BCS
��- Unified Design Manual. Water line sizes shown on plat must be in compliance
n, acs-
with City standards.
; (i 3. If proposed wastewater lift station is public, the design must be reviewed and
approved by staff.
4. If proposed wastewater lift station is private, easement dedication documents are
___requiredwith construction_documenta __
. A waterline extends south along Shelbea. he water line should also extend
north, as well.
6. his .:- - : -' -- - - - e - . - ._. --
7. turnaround on Shelbea Dr. Pleas dis- cusa-_
,options Vistaff„,
Reviewed by: Spencer Thompson Date: June 9, 2004