Loading...
HomeMy WebLinkAboutCorrespondences TXCON TRANSMITTAL Date: May 7, 2004 To: Bridgette George Development Services City of College Station From: Joe Schultz, P.E. Texcon General C ! ntractors 1707 Graham Road College Station, Texas 77845 Phone: (979) 764 -7743 Subject: Final Plat South Hampton — Phase 3 College Station, Texas Remarks: Attached are the Final Plat Application, 2 copies of each the Construction Drawings, Drainage Report, Waterline Fire Flow Analysis, and Sanitary Sewer Design Report. Let me know if you have any questions. From: "Joe Schultz" <joeschultz @texcon.net> To: "Jennifer Prochazka" <JProchazka @cstx.gov> Date: 5/14/2004 11:47:48 AM Subject: RE: South Hampton Phase 3 FP Jennifer, Phyllis Hobson says there are no deed restrictions for Nantucket Phase 2. Can the preliminary plat and final plat go to the P &Z on the same night? If so, what is the anticipated schedule. thanks, Joe Original Message From: Jennifer Prochazka [mailto:JProchazka @cstx.gov] Sent: Thursday, May 13, 2004 4:20 PM To: gingerlurso @texcon.net; joeschultz @texcon.net Cc: Bridgette George; Natalie Ruiz; Spencer Thompson Subject: South Hampton Phase 3 FP Ginger & Joe, Just to let you know, we are unable to return comments on this submittal without doing a 'stop review' because the lots do not meet the existing zoning. We will return comments on this submittal after the zoning is approved at City Council on May 13th, the Concept Plan is approved at the Design review Board on May 14th and we have reviewed your preliminary plat. Just as a heads up, we will need a copy of the existing deed restrictions for the Nantucket Phase 2 lots. Please call or email if you have any questions! Thanks! Jennifer Prochazka Staff Planner Development Services City of College Station tel.: 979.764.3570 fax: 979.764.3496 College Station. Embracing the past, Exploring the future. From: Jennifer Prochazka To: gingerlurso @texcon.net; Joe Schultz Date: 5/13/2004 4:20:22 PM Subject: South Hampton Phase 3 FP Ginger & Joe, Just to let you know, we are unable to return comments on this submittal without doing a 'stop review' because the lots do not meet the existing zoning. We will return comments on this submittal after the zoning is approved at City Council on May 13th, the Concept Plan is approved at the Design review Board on May 14th and we have reviewed your preliminary plat. Just as a heads up, we will need a copy of the existing deed restrictions for the Nantucket Phase 2 lots. Please call or email if you have any questions! Thanks! Jennifer Prochazka Staff Planner Development Services City of College Station tel.: 979.764.3570 fax: 979.764.3496 CC: Bridgette George; Natalie Ruiz; Spencer Thompson Deborah Grace - RE: south hampton subdivision - Phase 3 Page 1 From: "Joe Schultz" <joeschultz @texcon.net> To: "Deborah Grace" <DGRACE @cstx.gov> Date: 12/2/2004 12:48:53 PM Subject: RE: south hampton subdivision - Phase 3 I will get the mylar and digital file to you ASAP thanks, Joe Original Message From: Deborah Grace [mailto:DGRACE @cstx.gov] Sent: Thursday, December 02, 2004 9:40 AM To: joeschultz @texcon.net Subject: Re: south hampton subdivision - Phase 3 Joe, here is what I show outstanding: Parkland Dedication fee of $6,116.00 Impact fee of $2,677.18 Nanette is out so I have no idea if the digital file is here or not. I can not find the mylar. Have you turned it in? "No matter how little money and how few possessions you own, having a dog makes you rich." Louis Sabin Deborah Grace > <> Staff Assistant City of College Station Planning & Development Services 1101 Texas Avenue College Station, Texas 77840 979 - 764 -3570 Main 979 - 764 -3784 Desk 979 - 764 -3496 Fax dgrace @cstx.gov www.cstx.gov »> "Joe Schultz" <joeschultz @texcon.net> 12/1/2004 4:34:33 PM »> Deborah, Deborah Grace - RE: south hampton subdivision - Phase 3 Page 2 I got a letter of completion dated today for this subdivision. Is there anything else needed to file this Plat? thanks, Joe College Station. Heart of the Research Valley. Deborah Grace South Hampton Phase II Page 1 From: Spencer Thompson To: Roxanne Nemcik Date: 2/9/2005 10:53:13 AM Subject: South Hampton Phase II Roxanne, As you know City staff is writing a letter to the Developer of South Hampton Phase I in reference to the dedication of off -site easements as required by the P &Z in approving of the Final Plat of the subdivision. Therefore, the Developer is in violation of the Subdivision regulations and the City is requesting the Developer to comply by dedication the easement now. The easement in question was to cover the City's Impact Fee Sewer Line. The same Developer developed South Hampton Phase II. South Hampton Phase II utilizes the same sewer line as does South Hampton Phase I. The sewer line that both subdivisions are required to have in order to comply with the City's Subdivision Regulations is not currently covered by an easement. It has come to my attention that the Final Plat for South Hampton Phase II is not filed for record. The Developer is currently requesting the plat be filed for record. Can City staff withhold filing the plat for record in order to obtain the required easement? thx st Spencer G. Thompson, Jr. W/WW Engineering Services City of College Station PO Box 9960 College Station, TX 77842 Ph. 979.764.5011 Fx. 979.764.3452 www.cstx.gov Utility Service Center CC: Alan Gibbs; Bob Mosley; Charles McLemore; Deborah Grace; Glenn Brown; Joey Dunn; John Woody; Karl Goldapp; Trey Fletcher