Loading...
HomeMy WebLinkAboutLetter of Completion DEC -01 -2004 WED 11:42 AM FAX N0. P. 02 Ta + Pi'ER OF COMPLETION CITY OF l{:N(flNEERI.NG 1)/11 1/ - 7 - 0 CITY 011 COLLEGE GE S:1!ATION COLTAI:GE STATION, TEXAS 11E: COMPLETION OF _ � , �II HO TA 7M ` r, Jnk �vVJ� < CI C� </ it � IJ V 'Co Whom. It M:ay Concern: The purpose of our letter is to request that the following listed inaprov'eanorrls be aappJoved and accepted as being constructed. raider City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval, and n,cceptance by the City is requested in order that we may finalize any subcontracts; and to affirm. their warranty on the work TIiis approval. and acceptance by the (Jity of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the :above reference project The one-year warranty is hereby affirmed and agreed to by i (QV E e n ! y r ■e.f i 4 and by their sub-contractors as indicated by signatures below. WORK CX)Ml..1411 ) I)A.',VE 5e. w — I. 3.4)„ �,M e f- S _. Owner: k) 6 4L 1- LLC,1 . Contractor. w c X co-., ^� ‘b _�l rn �.S� v ■ r a.X�(eS t"1 � Q �ae' ,e0 , . f t . , ; c l o b G li e v Pc - 1- , C).‘, - A( 777 f / Ct 'Ik t e 5 • `' ` � 7 7 4 - 17 e4f Signature: .4471 Signature:_ „,„,„ A /1 ACCE . . A .NCP A PPROV1lL i • - qtr, ..._ it, 1__%\t\t&_(.1,L4.9 (1 City Emi»nra CONSTRUCTION COST ESTIMATE 08 - Jul - SOUTH HAMPTON SUBDIVISION COLLEGE STATION, TEXAS PHASE 3 - 11 LOTS Item Estimated Unit Estimated No. Description Quantity Price Cost Sitework 1 Mobilization /Layout 1 LS $4,500.00 $4,500 2 Site Preparation - ROW & easements 1.1 AC $5,500.00 $6,050 3 Silt Fence 300 LF $2.50 $750 4 Construction Exit- Rock 20 TONS $50.00 $1,000 5 Hydromulch /Hydroseeding 2,000 SY $0.50 $1,000 6 Tie -in to existing pavement / 6' sidewalk 1 LS $500.00 $500 7 Topsoil Stripping & Replacement 250 CY $5.00 $1,250 8 Excavation /Grading 650 CY $4.00 $2,600 9 Lime Stabilized Subgrade 1,950 SY $3.10 $6,045 10 Asphalt Paving - 1 1/2" depth • 1,585 SY $5.25 $8,321 11 Base Material - 6" depth 1,585 SY $6.00 $9,510 12 Concrete Curb and Gutter 973 LF $7.75 $7,541 13 Concrete Aprons 498 SF $5.50 $2,739 14 ADA Ramp - corner 2 EA $450.00 $900 15 Concrete Sidewalk 1,400 SF $2.80 $3,920 16 End of Roadway Sign - red /black 3 EA $200.00 $600.00 Subtotal $57,226 Storm Drainage 17 Drainage Pipe - 27" RCP, T & G - structural 65 LF $50.00 $3,250 18 Drainage Pipe - 27" RCP, T & G - non - structural 289 LF $42.00 $12,138 19 Junction Box 1 EA $2,500.00 $2,500 20 Inlets 5' wide 1 EA $2,600.00 $2,600 21 Inlets 10' wide 1 EA $3,100.00 $3,100 22 Inlet Protection 3 EA $100.00 $300 23 Concrete Flume 60 SF $5.00 $300 24 Headwall - 27" RCP 1 EA $2,000.00 $2,000 25 Remove existing headwall (for 24" pipe), 24" RCP & Conc. Flume 1 LS $1,000.00 $1,000 Subtotal $27,188 Water Lines 26 6" Water PVC CL200 (C909) non - structural 201 LF $20.00 $4,020 27 6" Water PVC CL200 (C909) structural 42 LF $28.00 $1,176 28 3" Water PVC CL200 - non - structural 100 LF $15.00 $1,500 29 3" Water PVC CL200 - structural 72 LF $20.00 $1,440 30 6" Gate Valves 1 EA $550.00 $550 31 3" Gate Valves 1 EA $400.00 $400 32 6" x 3" M.J. Tees 1 EA $250.00 $250 33 6" 11.25 deg. M.J. Bend 1 EA $250.00 $250 34 6" 22.50 deg. M.J. Bend 2 EA $250.00 $500 35 1" Blowoff Assembly 1 EA $350.00 $350 36 2" Blowoff Assembly 1 EA $400.00 $400 37 Fire Hydrant Assembly 1 EA $2,250.00 $2,250 38 Fire Hydrant Vertical Extension 1 EA $200.00 $200 39 Restrained Joint - 6" 3 EA $175.00 $525 40 Tie -in to existing line 1 EA $100.00 $100 41 Water Services 6 EA $700.00 $4,200 Subtotal $18,111 Sanitary Sewer Lines 42 6" SDR 26 Pipe - 3034 - non - structural 20 LF $30.00 $600 43 6" SDR 26 Pipe - 3034 - structural 130 LF $22.00 $2,860 44 Sewer Services 4 EA $700.00 $2,800 45 Sewer Services - on Existing Manhole ..°*- " 1 EA $800.00 $800 46 Sewer Services - on Existing Line ,� .. ... TF I- Rk 2 EA $800.00 $1,600 47 Manholes - 4' diameter i t c . •• his $ � 1 EA $2,400.00 $2,400 48 Tie into Existing Manhole oi • * •• ' * ti 1 EA $1,000.00 $1,000 * • ' • * If Subtotal $12,060 t JOSEP P. SCHULTZ E Total Sitework $57,226 V 4' 0 Rs: Total Storm Drainage $27,188 f � 0 �, • 4 ' • y s / , Total Water $18,111 �,��� J ' .. � C? i Total Sanitary Sewer $12,060 I j OPAL � TOTAL CONSTRUCTION $114,585 Page 1 of 1 7 - .o'