Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM August 25, 2004 TO: Louise Fischer, Kerr Surveying, via fax 691.8904 V FROM: Bridgette George, Assistant Development Manager SUBJECT: EASTMARK SUB PH 2 (FP- REPLAT) - Final Plat Staff reviewed the above - mentioned final plat as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information to be schedule for a future Planning & Zoning Commission meeting: One (1) copy of the revised final plat; If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments cc: Dennis Schachterle, via fax 641.592.0888 Case file #04- 00500204 STAFF REVIEW COMMENTS NO. 1 Project: EASTMARK SUB PH 2 (FP- REPLAT) - 04- 00500204 This is a stop review. This replat does not meet subdivision regulations which require public sanitary sewer be provided to all subdivisions. This is a cursory review and does not constitute a complete review. ENGINEERING 1. Extension of the public sewer system to Lot 2B is required. Engineering construction documents are required as part of the Plat application. 2. Show "Original Plat" as it is currently platted. Remove utility, curbing, and driveway information. 3. Provide volume and page numbers of existing easements. 4. For purposes of signage, the resulting lots will be considered one building plot. Reviewed by: Carol Cotter Date: August 24, 2004 ELECTRICAL 1. Need 20 ft easement to cover existing underground electrical lines and transformer providing service to existing building on lot 2A. 2. Contact Tony Michalsky at 979 - 764 -3438 to coordinate locating electric lines for easements. Reviewed by: Tony Michalsky Date 8- 27 -04: G 4 Orh4 -, / c i ldO 27 L -311-- NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 4-# CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM October 8, 2004 TO: Louise Fischer, Kerr Surveying, Via fax 691.8904 FROM: Bridgette George, Development Coordinator SUBJECT: EASTMARK PH 2 (FP- REPLAT) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Tuesday, October 12, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for October 28, 2004, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; One (1) copy of the sealed engineer's cost estimate for sewer line construction; and, One (1) Mylar original with the appropriate signatures. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments cc: Dennis Schachterle, via fax 641.592.0888 ✓ Case file #04- 00500204 Sfin114- • STAFF REVIEW COMMENTS NO. 2 Project: EASTMARK PH 2 (FP- REPLAT) - 04- 00500204 ENGINEERING 1. The existing carport is encroaching into the PUE. It will need to be removed as a condition of plat approval. 2. Submit sealed Engineer's cost estimate for sewer line construction. Reviewed by: Carol Cotter Date: October 8, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2