Loading...
HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION CITY ENGINEER DATE: S74 42-- CITY OF COLLEGE STATION , ��� ���5 COLLEGE STATION, TEXAS vi-N lU�fSl , c Z� RE: COMPLETION OF Dr ,,, 1.,— 14- Dear Sir: U,(im l(o/k The purpose of our letter is to request that the following listed improvements be ,2vo ZOCG2 approved and accepted as being constructed under City inspection and completed 1 according to plans and specifications as approved and required by the City of College -4 A2 Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one -year warranty is hereby affirmed and agreed to by 61 / 1 / -114 and by their subcontractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE Owner:, G c,k (C, Contractor: F Phone Number: cpq- 2-6Z Phone Number: Address: 1 Cekd er Address: P. s /2 . / t' x (4 =4?7, x 7 - 79 Y2- Signature: ACCEPTA tE ' APPROV Ler City Representative • i T 1IAED CI SITE EMS RUED y ngine r YEMM� BL * EINT 1 f0 ® OTHER ESMTS NEEOEO Revised 1/31/07 Engineer's Cost Estimate UNIVERSITY OAKS - SECTION TWO LOTS 14R1, 14R2, 15R1, 15R2, 16R1, 16R2, 20R1, 20R2, 24R1 & 24R2 SIDEWALK IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS it v *4 - � _ 4 UNIT TOTAL `,U... .k ES.1' LQ-4�-� _ QUANTITY UNIT COST. . COST PAVING IMPROVEMENTS 1 Mobilization, Construction Staking & All Required 1 LS $500.00 $500.00 Testing by Contractor 2 In -Place Earthwork Embankment Finishing (Topsoil 30 CY $4.00 $120.00 & Miscellaneous) 3 4" Thick Reinforced Concrete Sidewalk (Includes 2,386 SF $4.00 $9,544.00 H/C Ramps) SUB -TOTAL = $10,164.00 ,: cD'S • �,. Tek S 1 ESTIMATED CONSTRUCTION COST = $10,164.00 •'• ` 4 ,.- 7 10% CONTINGENCY = $210.53 ;; * : / ■ .• •'I / .. ..1 . ; GRAND TOTAL = $10,374.53 /� ::583 , • j /' 0,e'• ./CENSF 11 S S /oNA EN. 1 . ., 1 RME Consulting Engineers i POST TEXAS FIRM REGISTRATION No. F -4695 '" r OFFICE BOX 9253 COLLEGE STATION, TEXAS 77842 • �C S�C x OFF/FAX: (979) 764 -0704 f N E -mail: civil @rmengineer.com Estimates and projections prepared by RME Consulting Engineers relating to construction costs and schedules, operation and maintenance costs, equipment characteristics and performance, and operating results are based on this office's experience, qualifications and judgment as a design professional. Since RME has no control over weather, cost and availability of labor, material and equipment, labor productivity, construction contractor's procedures and methods, unavoidable delays, construction contractor's methods of determining prices, economic conditions, competitive bidding or market conditions and other factors affecting such estimates or projections, this office does not guarantee that actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by the Engineer of record. CD1- 220 - 0446 -E02 1 of 1