Loading...
HomeMy WebLinkAboutStaff Comments ENGINEERING COMMENTS NO. 1 1. Submit abandonment application with required supporting documents for processing. 2. It is unclear whether or not you are proposing the stormwater relocation with the plat or Site Plan. To remove the PUE from the Plat as shown, the relocation and Council abandonment will be required prior to platting. Otherwise, PUE delineation must remain but can be labeled "to be abandoned ". Also need to label PUE with volume and page number. Site Plan cannot be approved until PUE is abandoned. 3. It appears that additional PUE is required along University Drive to cover the existing water line. There needs to be at least a 20' clear separation between a structure and water and /or sanitary sewer lines. 4. Construction Plan comments are provided under the Site Plan review. Reviewed by: Carol Cotter Date: April 2, 2012