Loading...
HomeMy WebLinkAboutEngineers Cost Estimate Engineer's Cost Estimate UNIVERSITY OAKS - SECTION TWO LOTS 14R1, 14R2, 15R1, 15R2, 16R1, 16R2, 20R1, 20R2, 24R1 & 24R2 SIDEWALK IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS NCt. DES ' TION 1AWITT* mist cost COST PAVING IMPROVEMENTS 1 Mobilization, Construction Staking & All Required 1 LS $500.00 $500.00 Testing by Contractor In -Place Earthwork Embankment Finishing (Topsoil 2 30 CY $4.00 $120.00 & Miscellaneous) 3 4" Thick Reinforced Concrete Sidewalk (Includes 2,386 SF $4.00 $9,544.00 H/C Ramps) SUB -TOTAL = $10,164.00 :PF; OF rE� � • � l ESTIMATED CONSTRUCTION COST = $10,164.00 * :. •• ` '� •., • 1 1 I 10% CONTINGENCY = $210.53 "�'- .: =;�" GRAND TOTAL = $10,374.53 0 0 0 , � r: ::583 • r /. O -'. . yE N � It /ONAL N..- I v 3 ..14 RME Consulting Engineers i a TEXAS FIRM REGISTRATION No. F-4695 �"'_ir POST OFFICE BOX 9253 ' A .. / COLLEGE STATION, TEXAS 77842 t, 4Csrl1"1u '1+s6 ibligialahlabgeM OFF/FAX: (979) 764 - 0704 f _ N E -mail: civil @rmengineer.com Estimates and projections prepared by RME Consulting Engineers relating to construction costs and schedules, operation and maintenance costs, equipment characteristics and performance, and operating results are based on this office's experience, qualifications and judgment as a design professional. Since RME has no control over weather, cost and availability of labor, material an d equipment, labor productivity, construction contractor's procedures and methods, unavoida delays, construction contractor's methods of determining prices, economic conditions, competitive bidding or market conditions and other factors affecting such estimates or projections, this office does not guarantee that actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by the Engineer of record. CD1- 220 - 0446 -E02 1 of 1