UNIVERSITY OAKS - SECTION TWO
LOTS 14R1, 14R2, 15R1, 15R2, 16R1, 16R2, 20R1, 20R2, 24R1 & 24R2
SIDEWALK IMPROVEMENTS
COLLEGE STATION, BRAZOS COUNTY, TEXAS
�'Gx '"�' .� f oc�, e� a4� � B, � �,s a�s`" z ? 1, , K 'S �" r '��` �"� . , NIT �. � �`"�r* a � .c i +e, .. .r -" ?45i3�§
0.: T t z OkYi 2' , � , ` it A% t .: r . ad^)ii kFe
PAVING IMPROVEMENTS
1 Mobilization, Construction Staking & All Required 1 LS $500.00 $500.00
Testing by Contractor
2 In -Place Earthwork Embankment Finishing (Topsoil 30 CY $4.00 $120.00
& Miscellaneous)
3 4" Thick Reinforced Concrete Sidewalk (Includes 2,386 SF $4.00 $9,544.00
H/C Ramps)
SUB -TOTAL = $10,164.00
.. � -..* OF TFI,ysk, I ESTIMATED CONSTRUCTION COST = $10,164.00
�1 �- i i 10% CONTINGENCY = $210.53
' ; GRAND TOTAL = $10,374.53
�~ • :: 583 .
/' /
I FS . . NG ��
RME Consulting Engineers
TEXAS FIRM REGISTRATION No. F-4695
/ Ar...1P411E10111fr POST OFFICE BOX 9253
COLLEGE STATION, TEXAS 77842
Cionsiudritina ifilfiginimers OFF/FAX: (979) 764 - 0704
e t E -mail: civil @rmengineer.com
Estimates and projections prepared by RME Consulting Engineers relating to construction costs and
schedules, operation and maintenance costs, equipment characteristics and performance, and operating
results are based on this office's experience, qualifications and judgment as a design professional. Since
RME has no control over weather, cost and availability of labor, material and equipment, labor
productivity, construction contractor's procedures and methods, unavoidable delays, construction
contractor's methods of determining prices, economic conditions, competitive bidding or market
conditions and other factors affecting such estimates or projections, this office does not guarantee that
actual rates, costs, performance, schedules, etc., will not vary from estimates and projections prepared by
the Engineer of record.
CD1- 220 - 0446 -E02 1 of 1