Loading...
HomeMy WebLinkAboutLetter Acknowledging City Standards ti 7607 Eastmark Drive, Ste. 252 <77840> P.O. Box 9253, College Station, TX 77842 ,r A. A Off /Fax: (979) 764 -0704 Ca�saalEci� email civil @rmengineer.com October 5, 2011 Erika Bridges, E.I.T. Graduate Civil Engineer City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: Creek Meadows — Section 4, Phase 2C Acknowledgement of City Standards RME No. 260 -0426 Erika Bridges: The purpose of this letter is to acknowledge that the construction plans for the utility improvements, for the above referenced project, to the best of my knowledge, do not deviate from the latest B /CS Design Guideline Manual with the following exception. • Minimum pipe slope of 0.50% along Sanitary Sewer Line "S l" between Sta. 5 +70.29 and Sta. 9 +17.09. However, as stated and calculated in the Water & Sanitary Sewer Report the pipe velocity, at peak flows, is above 2.0 fps. • The two (2) segments of Sanitary Sewer Line "S4" installed in this phase of construction, do not meet the minimum flow velocity of 2.0 ft/s at peak flow conditions. The design of these lines comply with minimum size, type and slope, however, the low number of dwelling units discharging to these lines prevent peak flows from reaching a flow velocity of 2.0 ft/s; I also acknowledge, to the best of my knowledge that the details provided in the construction plans are in accordance with the B /CS Standard Details. CD 1- 260 - 0426 -L06 Page 1 of 2 • 7607 Eastmark Drive, Ste. 250 -F <77840> P.O. Box 9253, College Station, TX 77842 Off /Fax: (979) 764 -0704 Carsisteil rieao Eiragiesiefers email: civil @rmengineer.com r Please do not hesitate to call if you have any questions. Sincerely, OF T^ ‘‘% ABON METCALFA 4 , /40;" 1 1 .. . / CE NSA L•• Rabon A. Metcalf, P.E. No. 8 � ". P t i Texas Firm Registration No. F -4695 rabon@rmengineer.com CD 1- 260- 0426 -L06 Page 2 of 2