HomeMy WebLinkAboutConformity Letter 7607 Eastmark Drive, Ste. 250 -F <77840>
i_. ,��r► P.O. Box 9253, College Station, TX 77842
de X Off /Fax: (979) 764 -0704
Cinessiditina Elpiejik arml ""!
email: civil @rmengineer.com
1
April 20, 2011
Erika Bridges, E.I.T.
Graduate Civil Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Creek Meadows (Section 4, Phase 2C) — Drainage Design Conformity Letter
RME No. 260 -0426
Erika:
The proposed development and correlating grading and drainage improvements are designed and
analyzed in accordance with the criteria outlined in the "B /CS Unified Drainage Design
Guidelines" manual of the City of College Station (CoCS). Furthermore the proposed
improvements are in conformity with the previously approved Construction Drawings &
Drainage Report (approval date 3/6/09) for Creek Meadows — Section 4, Phase 2C with no
changes being made to these items (i.e. grading, drainage, water & sanitary sewer).
Please call should you have any questions or require assistance.
Sincerely,
EoF rEE1 t
i 1t , ' * 1/
* . , , • I *
�...: 1 • LF
de:e ,V111 8858
, O �
t1 ��V\∎∎∎
Rabon A. Metcalf, P.E. No. 88583
Texas Firm Registration No. F -4695
rabon @rmengineer.com
onl '1L( fliV)4 T AA ii...... 1 ,.0 1
1� ct4c.)