HomeMy WebLinkAboutLetter Acknowledging City Standards 7607 Eastmark Drive, Ste. 250 -F <77840>
P.O. Box 9253, College Station, TX 77842
,r Off /Fax: (979) 764 -0704
Gomm isg lisoisarevers
email: civil@rmengineer.com
er.com
r �
October 5, 2011
Erika Bridges, E.I.T.
Graduate Civil Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Creek Meadows — Section 4, Phase 2A
Acknowledgement of City Standards
RME No. 260 -0426
Erika Bridges:
The purpose of this letter is to acknowledge that the construction plans for the utility
improvements, for the above referenced project, to the best of my knowledge, do not deviate
from the latest B /CS Design Guideline Manual.
I also acknowledge, to the best of my knowledge that the details provided in the construction
plans are in accordance with the B /CS Standard Details.
Please do not hesitate to call if you have any questions.
. : E Il%
Sincerely, ,v ... • . • q
% • RAB A M
4 0p. ��r
I�O •. <�CENS�.•' _
'�C � � o
1 s S /ONAL
Rabon A. Metcalf, P.E. No. 88�'$��' j
Texas Firm Registration No. F -4695
rabon @rmengineer.com
CD1- 260- 0426 -L05 Page 1 of 1