Loading...
HomeMy WebLinkAboutConstruction site notice OEM = W a MINNS I CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.D.2. of the TCEQ General Permit Number TXR150000 for discharges of storm water runoff from construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: http: / /www.tceq. state. tx. us / permitting /water quality /stormwater/TXR15 AIR.html Contact Name and Phone Number: (97 Rhodes (979) 260 -2800 Project Description: Creek Meadows - Section 4, Phase 2A Located between Greens Prairie Trail & Greens Prairie Road W. (Physical address or description of the site's location, estimated start date and projected end Estimated Start Date: 11/15/11 date, or date that disturbed soils will be Estimated End Date: 12/1/12 stabilized) Location of Storm Water Pollution RME Consulting Engineers P.O. Box 9253 Prevention Plan : College Station, TX 77842 For Construction Sites Authorized Under Part II.D.2. (Obtaining Authorization to Discharge) the following certification must be completed: I Chris Rhodes (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.D.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and implemented according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4 system. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Title Date