HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM August 19, 2004 TO: Patterson Architects, Via fax (979) 779 -0727 FROM: Jennifer Reeves, Project Manager SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscape plan One (1) revised grading plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: State Bank, Via fax (979) 968 -9781 Robert A. Williamson, Via fax (979) 779 -1539 Case file #04- 00500195 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: STATE BANK WELLBORN RD. BRANCH (SP) — 04- 00500195 PLANNING 1. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. Per site plan application check list, please identify the zoning for the abutting parcels. 3. It appears that you would want to get the future expansions of the building approved at this time. Please adjust the parking legend to reflect the required parking for the total square footage. 4. A portion of the proposed easements are being shown on Block 1 Lot 3 as well as the proposed transformer pad. The adjacent property owner will need to sign off on these easements. 5. Per Pete Caler (Sanitation Superintendent) A 12x12 dumpster pad will need to be approved with this site plan for the future building expansions. 6. Fire lanes are required to be a minimum of 20 -feet, please widen the 16.8 -ft. drive to the north to 20 -feet. 7. FYI: Per Final Plat Lot's 8 & 9 Block One shall share one free standing sign. It appears that a low profile sign is being proposed on the site plan. This would not be permitted. All signs are permitted separately and not approved by site plan. 8. The proposed pipe curbing will not be acceptable. The city requires monolithic concrete curbing. LAN DSCAPING /STREETSCAPING /BUFFER 9. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. 10. Please adjust the irrigation note to say: An irrigation plan is required to be reviewed, approved and installed prior to C.O. Reviewed by: Jennifer Reeves Date: 08 -18 -04 ENGINEERING 1. Provide sealed engineering documents for public water line. 2. Provide Water Design report per BCS Unified Design Guidelines. 3. Provide instruments for the PUE that will be dedicated. 4. Copies of filed proposed off -site Public Utility Easements will need to be submitted prior to Site Plan approval. 5. Per Jay Paige (TxDOT) If the driveway radius encroaches into the projected south adjacent property line (Block 1, Lot 3), a letter of permission will be required from the Owners when the Access Permit is submitted. 6. Show utilities. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 7. It appears that you are planning additional cross access with Lot 9, Block 1 east of the existing 85' access easement. A copy of the filed access easement will be required prior to Site Plan approval. 8. Required pavement for Fire Lane and sanitation ingress /egress is 6" thickness with #4 bars at 18" OCEW. Your proposed design #3 bars at 12" OCEW is okay, but the pavement thickness will need to be 6 ". 9. Minimum fire lane width is 20 feet. 10. TxDOT permit application calls for asphalt driveway, but Site Plan does not indicated asphalt. Will driveway be concrete or asphalt? 11. Delineate areas of asphalt and concrete paving. 12. Show culvert location on driveway. 13. Impact Fees required at time of Building Permit. 14. Development Permit Comments will be returned under separate cover. Reviewed by: Carol Cotter Date: August 18, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides digital AutoCAD 2000 version of plat and /or site plan. email to tmichals(a-cstx.gov 3. College Station Utilities has been working with Britt Rice Electric (Larry Patton) on service requirements. Reviewed by: Tony Michalsky Date: 8 -11 -04 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 i CITY OF COLLEGE STATION DRVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 J Fax (979) 7b4 -:3496 MEMORANDUM August 20, 2004 TO: Patterson Architect, Via fax (979) 77A -0727 FROM: Jennifer Reeves, Project Manager SUBJECT: DP -STATE BANK - WELLBORN RD BRANCH — Development Permit Staff reviewed the above- mentioned construction documents as requesled. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review, approval and issuance of the development permit: Two (2) copies of the Drainage Report SUBAITTEu 9.21.0+69 One (1) copies of the revised construction plans. -T* fkTRS If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details. If you have any questions or need additional information, please call Carol Cotter or myselt at i44 -3570. Attachments: Staff review comments cc: State Bank, Via fax (979) 968 -9781 Robert Williams, Via fax (979) 779 -1539 Case the # ( 04-00100045) STAFF REVIEW COMMENTS NO. 1 Project: DP -STATE BANK - WELLBORN RD BRANCH- DEVELOPMENT PERMIT( 04- 00100045) ENGINEERING 1. Drainage plan cannot be approved without Drainage Report. ` supmlvet 2. Drainage Report will need to show tluw capacity of the drainage channel will be A2VNW maintained as proposed. Typically, the flume is in the center of the channel with sides sloping up to full ea ,emant width resulting in a certain capacity for flow_ Your flume is alongside the buffer wall. Will a berm, opposite the wall, be required to contain flow? 3. Angle discharge from detention pond to follow more along the direction of flow in the - O VOW channel. 4. Add erosion control measures to inlet grate and downstream driveway culvert in-6AAWOeO TXDOT ROW. Reviewed by: Carol Cotter Date: August 18, 2004 HOTL: Any changes made to the plans, that have not been requested by the Chy of College Station, must be explained In your next transmittal lettar and "bubbled" on yaur plans. Any additional changes on these plans that have not been pointed out to the city, VAII Consti w a uuln dwly new review. 8WIT R%-AW Commonty ?ape 2 o f 4 i F D - -(Cis C 00C �- 3b CITY OF COLLEGE STATION T)EVELOPMENT SERVICES 110 1 Texas Avenue South, FO Banc 9960 College Station, Texas 77842 Phone (979) 764 -3570 1 Fax (979) ­I b4 -;1496 MEMORANDUM August 20, 2004 TO: Patterson Architect, Via fax (979) 77cl - 0727 FROM: Jennifer Reeves, Project Manager SUBJECT: DP -STATE BANK - WELLBORN RD BRANCH — Development Permit Staff reviewed the above- mentioned construction documents as requested. The following page is a list of staff review comments detailing items that need to be addre5tied. Please address the comments and submit the following information for further staff review, approval and issuance of the development permit: Two (2) copies of the Drainage Report sueMIrr60 9 , 21 , 04 , 69 One (1) copies of the revised construction plans. Z* 6ATRS If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details. If you have any questions or need additional information, please call Carol Cotter or myselt at 1154 - 3570. Attachments: Staff review comments cc: State Bank, Via fax (979) 968 -9781 Robert Williams, Via fax (979) 779 -1539 Case file # ( 04 - 00100045) M STAFF REVIEW COMMENTS NO. 1 Project: DP- STATE BANK - WELLBORN RD BRANCH- DEVELOPMENT PERMIT( 04- 00100045) ENGINEERING 1. Drainage plan cannot be approved without Drainage Report. - � SUDMIT 2. Urainage Report will need to show tluw capacity of the drainage channel will be GD maintained as proposed. Typically, the flume is in the center of the channel with sides sloping up to full easement width resulting in a certain capacity fnr flow_ Your flume is alongside the buffer wall. Will a berm, opposite the wall, be required to contain flow? 3. Angle discharge from detention pond to follow more along the direction of flow in the • 04 channel. 4. Add erosion control measures to inlet grate and downstream driveway culvert in•Gtidkl TxDOT ROW. ` Reviewed by: Carol Cotter Date: August 18, 2004 NOTE: Any ChangiOV made to the plans that have not been requdsled by the City of Coliege Station, must t)e oxplained In your next trar►sr»htal latter and "bubbled" on yawl plans. Any additional Changes on these plans that have not been pointed out to the Clty, VAN oonatituui m c:uwiiybkily new review. Page 2d4 Staff ftrvirwCommant4 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM August 19, 2004 TO: State Bank, Via fax (979) 968 -9781 FROM: Jennifer Reeves, Project Manager SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscape plan One (1) revised grading plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Robert A. Williamson, Via fax (979) 779 -1539 Patterson Architects, Via fax (979) 779 -0727 Case file #04- 00500195 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: STATE BANK WELLBORN RD. BRANCH (SP) — 04- 00500195 PLANNING 1. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. Per site plan application check list, please identify the zoning for the abutting parcels. 3. It appears that you would want to get the future expansions of the building approved at this time. Please adjust the parking legend to reflect the required parking for the total square footage. 4. A portion of the proposed easements are being shown on Block 1 Lot 3 as well as the proposed transformer pad. The adjacent property owner will need to sign off on these easements. 5. Per Pete Caler (Sanitation Superintendent) A 12x12 dumpster pad will need to be approved with this site plan for the future building expansions. 6. Fire lanes are required to be a minimum of 20 -feet, please widen the 16.8 -ft. drive to the north to 20 -feet. 7. FYI: Per Final Plat Lot's 8 & 9 Block One shall share one free standing sign. It appears that a low profile sign is being proposed on the site plan. This would not be permitted. All signs are permitted separately and not approved by site plan. 8. The proposed pipe curbing will not be acceptable. The city requires monolithic concrete curbing. LANDSCAPING /STREETSCAPING /BUFFER 9. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. 10. Please adjust the irrigation note to say: An irrigation plan is required to be reviewed, approved and installed prior to C.O. Reviewed by: Jennifer Reeves Date: 08 -18 -04 ENGINEERING 1. Provide sealed engineering documents for public water line. 2. Provide Water Design report per BCS Unified Design Guidelines. 3. Provide instruments for the PUE that will be dedicated. 4. Copies of filed proposed off -site Public Utility Easements will need to be submitted prior to Site Plan approval. 5. Per Jay Paige (TxDOT) If the driveway radius encroaches into the projected south adjacent property line (Block 1, Lot 3), a letter of permission will be required from the Owners when the Access Permit is submitted. 6. Show utilities. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 7. It appears that you are planning additional cross access with Lot 9, Block 1 east of the existing 85' access easement. A copy of the filed access easement will be required prior to Site Plan approval. 8. Required pavement for Fire Lane and sanitation ingress /egress is 6" thickness with #4 bars at 18" OCEW. Your proposed design #3 bars at 12" OCEW is okay, but the pavement thickness will need to be 6 ". 9. Minimum fire lane width is 20 feet. 10. TxDOT permit application calls for asphalt driveway, but Site Plan does not indicated asphalt. Will driveway be concrete or asphalt? 11. Delineate areas of asphalt and concrete paving. 12. Show culvert location on driveway. 13. Impact Fees required at time of Building Permit. 14. Development Permit Comments will be returned under separate cover. Reviewed by: Carol Cotter Date: August 18, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides digital AutoCAD 2000 version of plat and /or site plan. email to tmichals _cstx.gov 3. College Station Utilities has been working with Britt Rice Electric (Larry Patton) on service requirements. Reviewed by: Tony Michalsky Date: 8 -11 -04 MISCELLANEOUS Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM August 19, 2004 TO: Robert A. Williamson, Via fax (979) 779 -1539 FROM: Jennifer Reeves, Project Manager SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscape plan One (1) revised grading plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: State Bank, Via fax (979) 968 -9781 Patterson Architects, Via fax (979) 779 -0727 Case file #04- 00500195 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: STATE BANK WELLBORN RD. BRANCH (SP) - 04- 00500195 PLANNING ,11. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. ✓ Per site plan application check list, please identify the zoning for the abutting parcels. . It appears that you would want to get the future expansions of the building approved at this time. Please adjust the parking legend to reflect the required parking for the total square footage. - 4. A portion of the proposed easements are being shown on Block 1 Lot 3 as well as the proposed transformer pad. The adjacent property owner will need to sign off on these easements. ---5. Per Pete Caler (Sanitation Superintendent) A 12x12 dumpster pad will need to be approved with this site plan for the future building expansions. l ' , -=-6. Fire lanes are required to be a minimum of 20 -feet, please widen the 16.8 -ft. drive to the north to 20 -feet. —7. FYI: Per Final Plat Lot's 8 & 9 Block One shall share one free standing sign. It appears that a low profile sign is being proposed on the site plan. This would not be permitted. All signs are permitted separately and not approved by site plan. �8. The proposed pipe curbing will not be acceptable. The city requires monolithic concrete curbing. LAN DSCAPING /STREETSCAPING /BUFFER 1 9. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. x/10. Please adjust the irrigation note to say: An irrigation plan is required to be reviewed, approved and installed prior to C.O. Reviewed by: Jennifer Reeves Date: 08 -18 -04 ENGINEERING 1. Provide sealed engineering documents for public water line. 2. Provide Water Design report per BCS Unified Design Guidelines. 3. Provide instruments for the PUE that will be dedicated. 4. Copies of filed proposed off -site Public Utility Easements will need to be submitted prior to Site Plan approval. 5. Per Jay Paige (TxDOT) If the driveway radius encroaches into the projected south adjacent property line (Block 1, Lot 3), a letter of permission will be required from the Owners when the Access Permit is submitted. 6. Show utilities. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 7. It appears that you are planning additional cross access with Lot 9, Block 1 east of the existing 85' access easement. A copy of the filed access easement will be required prior to Site Plan approval. 8. Required pavement for Fire Lane and sanitation ingress /egress is 6" thickness with #4 bars at 18" OCEW. Your proposed design #3 bars at 12" OCEW is okay, but the pavement thickness will need to be 6 ". 9. Minimum fire lane width is 20 feet. 10. TxDOT permit application calls for asphalt driveway, but Site Plan does not indicated asphalt. Will driveway be concrete or asphalt? 11. Delineate areas of asphalt and concrete paving. 12. Show culvert location on driveway. 13. Impact Fees required at time of Building Permit. 14. Development Permit Comments will be returned under separate cover. Reviewed by: Carol Cotter Date: August 18, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides digital AutoCAD 2000 version of plat and /or site plan. email to tmichals _cstx.gov 3. College Station Utilities has been working with Britt Rice Electric (Larry Patton) on service requirements. Reviewed by: Tony Michalsky Date: 8 -11 -04 MISCELLANEOUS Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM September 22, 2004 TO: Robert A. Williamson, Via fax (979) 779 -1539 FROM: Bridgette George, Assistant Development Manager SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised set of complete construction documents; and One (1) Site Plan and Landscaping Plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Patterson Architects, Via fax (979) 779 -0727 State Bank, Via fax (979) 968 -9781 Case file #04- 00500195 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 2 Project: STATE BANK WELLBORN RD. BRANCH (SP) - 04- 00500195 PLANNING 1. Per phone conversation that Bridgette George and Rick Ravey had on 9/1, additional documentation will be required for the off site easements. (easement dedication sheet for the adjacent property owner to sign) 2. The entire fire truck "T" turn - around must be painted. Please remove the proposed fire lane markings from the 16'8" drive way. Reviewed by: Jennifer Reeves Date: 09 -01 -04 ENGINEERING 1. Drainage Report: You cannot discharge more to TxDOT ROW than is going there currently. It appears that you are almost doubling it. 2. Drainage Report: Show how you determined the runoff coefficient for developed conditions? 3. Site Plan shows a double culvert. Grading Plan shows a single. Please size the culvert/s. The driveway permit shows a single 18" diameter culvert. Please verify that it is sized appropriately. 4. How will Lot 3 be able to drain if the flowline of the channel beginning on your property is at 327? 5. Fire Flow Report: For commercial development, the second fire hydrant can be no more than 300' feet lay of hose with spray coverage of 150' radius from the structure. Can you meet the fire flow requirements with one fire hydrant? 6. Fire Flow Report: Fire Report shows a 2,880 sf total build -out. The drainage report shows a total build -out of 4,223 sf. Please reconcile report and drawings. It is my understanding that the future expansion will bring the total building to no more than 2,880 sf. 7. To submit the TxDOT driveway permits, I need supporting documents to show complete driveway design; including curb return radii, connection to roadway detail (undercutting of pavement is not allowed), pavement detail, culvert size, culvert flowlines, etc. Please submit 4 copies of supporting documents necessary to show this (If you have this information on separate sheets, then I need 4 copies of each sheet). Reviewed by: Carol Cotter Date: 09 -22 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM September 22, 2004 TO: Patterson Architects, Via fax (979) 779 -0727 FROM: Bridgette George, Assistant Development Manager SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised set of complete construction documents; and One (1) Site Plan and Landscaping Plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: State Bank, Via fax (979) 968 -9781 Robert A. Williamson, Via fax (979) 779 -1539 Case file #04- 00500195 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 2 Project: STATE BANK WELLBORN RD. BRANCH (SP) - 04- 00500195 PLANNING 1. Per phone conversation that Bridgette George and Rick Ravey had on 9/1, additional documentation will be required for the off site easements. (easement dedication sheet for the adjacent property owner to sign) 2. The entire fire truck "T" turn - around must be painted. Please remove the proposed fire lane markings from the 16'8" drive way. Reviewed by: Jennifer Reeves Date: 09 -01 -04 ENGINEERING 1. Drainage Report: You cannot discharge more to TxDOT ROW than is going there currently. It appears that you are almost doubling it. 2. Drainage Report: Show how you determined the runoff coefficient for developed conditions? 3. Site Plan shows a double culvert. Grading Plan shows a single. Please size the culvert/s. The driveway permit shows a single 18" diameter culvert. Please verify that it is sized appropriately. 4. How will Lot 3 be able to drain if the flowline of the channel beginning on your property is at 327? 5. Fire Flow Report: For commercial development, the second fire hydrant can be no more than 300' feet lay of hose with spray coverage of 150' radius from the structure. Can you meet the fire flow requirements with one fire hydrant? 6. Fire Flow Report: Fire Report shows a 2,880 sf total build -out. The drainage report shows a total build -out of 4,223 sf. Please reconcile report and drawings. It is my understanding that the future expansion will bring the total building to no more than 2,880 sf. 7. To submit the TxDOT driveway permits, I need supporting documents to show complete driveway design; including curb return radii, connection to roadway detail (undercutting of pavement is not allowed), pavement detail, culvert size, culvert flowlines, etc. Please submit 4 copies of supporting documents necessary to show this (If you have this information on separate sheets, then I need 4 copies of each sheet). Reviewed by: Carol Cotter Date: 09 -22 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 (*O r"" CITY OF COLLEGE STATION Planning 6 Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM October 19, 2004 TO: State Bank, via fax 979.968.9781 FROM: Bridgette George, Development Coordinator SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 processing fee for the next round of three (3) staff reviews; and One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or myself at 764.3570. Attachments: Staff review comments cc: Robert A. Williamson, via fax 779.1539 v Patterson Architects, via fax 779.0727 Case file #04- 00500195 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 3 Project: STATE BANK WELLBORN RD. BRANCH (SP) - 04- 00500195 PLANNING 1. The dumpster is not being shown on the landscape plan. Please be aware that it will be visible from the right of way and will be required to have a gate. 2. The fire lanes on the landscape plan do not match the one on the site plan. Please adjust. Reviewed by: Jennifer Reeves Date: 10 -13 -04 ENGINEERING 1. The northern adjacent property may not be constructing the flume to the inlet box. If they do not, you will be required to improve the drainage easement all the way to the inlet. The City requires an improved channel in a Public Drainage Easement and this includes a trickle channel. 2. It appears that the elevation of the drainage flume will block drainage from the southern adjacent property. Your design needs to consider the flow upstream being able to use the drainage channel improvements. This may require you to drop lower the elevation of your flume. 3. As previously commented: Per Jay Paige (TxDOT) If the driveway radius encroaches into the projected south adjacent property line (Block 1, Lot 3), a letter of permission will be required from the Owners when the Access Permit is submitted. Since a letter one was not received, I submitted the driveway permit to TxDOT without one. Be prepared to provide this letter as it may hold up TxDOT permit. Reviewed by: Carol Cotter Date: October 14, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM September 22, 2004 TO: State Bank, Via fax (979) 968 -9781 FROM: Bridgette George, Assistant Development Manager SUBJECT: STATE BANK WELLBORN RD. BRANCH (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised set of complete construction documents; and One (1) Site Plan and Landscaping Plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Robert A. Williamson, Via fax (979) 779 -1539 Patterson Architects, Via fax (979) 779 -0727 Case file #04- 00500195 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 2 Project: STATE BANK WELLBORN RD. BRANCH (SP) - 04- 00500195 PLANNING 1. Per phone conversation that Bridgette George and Rick Ravey had on 9/1, additional documentation will be required for the off site easements. (easement dedication sheet for the adjacent property owner to sign) 2. The entire fire truck "T" turn - around must be painted. Please remove the proposed fire lane markings from the 168" drive way. Reviewed by: Jennifer Reeves Date: 09 -01 -04 ENGINEERING 1. Drainage Report: You cannot discharge more to TxDOT ROW than is going there currently. It appears that you are almost doubling it. 2. Drainage Report: Show how you determined the runoff coefficient for developed conditions? 3. Site Plan shows a double culvert. Grading Plan shows a single. Please size the culvert/s. The driveway permit shows a single 18" diameter culvert. Please verify that it is sized appropriately. 4. How will Lot 3 be able to drain if the flowline of the channel beginning on your property is at 327? 5. Fire Flow Report: For commercial development, the second fire hydrant can be no more than 300' feet lay of hose with spray coverage of 150' radius from the structure. Can you meet the fire flow requirements with one fire hydrant? 6. Fire Flow Report: Fire Report shows a 2,880 sf total build -out. The drainage report shows a total build -out of 4,223 sf. Please reconcile report and drawings. It is my understanding that the future expansion will bring the total building to no more than 2,880 sf. 7. To submit the TxDOT driveway permits, I need supporting documents to show complete driveway design; including curb return radii, connection to roadway detail (undercutting of pavement is not allowed), pavement detail, culvert size, culvert flowlines, etc. Please submit 4 copies of supporting documents necessary to show this (If you have this information on separate sheets, then I need 4 copies of each sheet). Reviewed by: Carol Cotter Date: 09 -22 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of3 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3of3