From: Spencer Thompson
To: Jeff Robertson
Date: 6/8/2004 4:42:01 PM
Subject: Re: Indian Lakes Final Plat Comments
Phase IV
1. One of the details shows the PSE and one does not.
Phase VI
1. This is a BTU comment. You are correct the comment should have read "west ".
2. Again, this is a BTU easement requirement.
3. Noted.
How is this plat going to address meeting the easement requirements and temporary turn around?
If plat does not meet minimum platting requirements I will have to stop my review of the item.
st
Spencer G. Thompson, Jr.
Engineering Services
City of College Station
PO Box 9960
College Station, TX 77842
Ph. 979.764.3570 Fx.979.764.3496
www.cstx.gov
>>> "Jeff Robertson" <jeffrob @cox - internet.com> 6/8/2004 2:36:58 PM >>>
Spencer,
I have a couple of questions about the comments on Phases IV and VI final
plats at Indian Lakes.
Phase IV Final Plat
1. Comment #3: There is not a Detail #3 shown on the Final Plat. Please
clarify the comment.
Phase VI Final Plat
1. Comment #3: I'm assuming that you meant the west lot line of the HOA
Common Area since there is a PUE on the east property line. As for the west
property line, a 20' PUE was provided with Phase 1 on the Lake Arapaho HOA
Lot. Therefore we did not provide an additional easement with this phase.
2. Comment #4: Again there is a 20' PUE on the Lake Arapaho Lot.
3. Comment #5: If you are looking at the overall drawing in the
construction plans it does appear the drainage will flow into Lot 28.
However, the contours used for that drawing were based on USGS maps so that
we could cover a large area. Based on an on- the - ground survey the
stormwater from the emergency spillway will actually flow through the HOA
easement shown on Lot 28 and not on Lot 28 or Lot 1.
Thanks,
Jeff
Jeff Robertson
McClure & Browne Engineering /Surveying, Inc.
1008 Woodcreek Dr.
College Station, Tx 77845
693 -3838
ieffrob (),cox- internet.com
CONFIDENTIAL NOTICE: The information contained in this transmission is
considered by the sender to be confidential. This material is intended only
for use of the recipient named above. If the reader or other recipient of
this material is not the intended recipient named above, please notify me
and delete this transmission. Thank you.
CC: Bridgette George; Glenn Brown; Mark Smith; Natalie Ruiz
A
r�s
Iljj�
June 9, 2004
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
(979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclure@tca.net
Bridgette George
Assistant Development Manager
Development Services, City of College Station
College Station, TX 77840
Re.: Indian Lakes Subdivision, Phase IV Final Plat
Revisions per City comments Summary Letter
Dear Ms. George:
Below is the summary of the revisions made per the staff's comments.
ENGINEERING:
COMMENT #1: Add curve radii to ROW at intersection of Anasazi and Chaco
Canyon.
ACTION: This revision has been made to the plat.
COMMENT #2: Add 70 -ft temporary turnaround at end of Anasazi.
ACTION: An easement has been shown on the plans. The turnaround will be
shown on the construction plans.
COMMENT #3: To Detail #2, add 55 -ft PSE info as in Detail #1.
ACTION: This revision has been made to the plat.
McCLURE & BROWNE
ENGINEERING /SURVEYING, INC.
COMMENT #4: Add 10 -ft PUE adjacent to ROW on Lots 28, 30 and 31 where PUE
does not cover.
ACTION: The 16 -ft PUE has been increased to a 26 -ft PUE in order to
eliminate the 10 -ft space between the ROW and PUE.
COMMENT #5: The construction documents show the Conservation Area to be such
AND Common Area. How can lot be the conservation area be owned
and maintained by HOA and owner of Lot? Another issue is that all
lots must be encompassed by a PUE; 10 -ft or 20 -ft whichever applies.
This plat does not comply with this requirement. Show easements as
required. No variance for this was requested to my knowledge
ACTION: The construction plans are mislabeled. The conservation areas
should be labeled as "Conservation Buffer"as shown on the plat. The
lot owner will own the portion of the conservation area that lies on
their lot. Additional easements have been added to the plat as
requested.
Sincerely,
Jeff Robertson, E.I.T.
Graduate Engineer
McCLURE & BROWNE ENGINEERING /SURVEYING, INC.