HomeMy WebLinkAboutApplication (12-176) `Q ��
'>; \�
_ FO OFFICE EON
CASE NO.: —1_QV — I i
G DATE SUBMITT D: ' I � "
CITY OF COLJ.FGE STATION TIME: ` .
Home of Texas AerM University' ST/IF -
DESIGN REVIEW BOARD APPLICATION
WOLF PEN CREEK DEVELOPMENT REVIEW
(Check all that apply. Note: All items checked must be presented to the Design Revi Board at the
same time): ❑ Site Plan / Building ❑ Building Sign
MINIMUM SUBMITTAL REQUIREMENTS:
[1' $350 Design Review Board Application Fee.
❑ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
For Site Plan / Building consideration:
❑ $932 Site Plan Application Fee.
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance
is due prior to the issuance of any plans or development permit).
❑ $350 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
❑ Fourteen (14) folded copies of site plan.
❑ One (1) folded copy of the landscape plan.
❑ One (1) copy of the following for building review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the public infrastructure plans and supporting documents (if applicable).
❑ The attached Site Plan and Non - Residential Architectural Standards Building Review checklists (if
applicable) with all items checked off or a brief explanation as to why they are not check off.
For Building consideration:
❑ $250 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
❑ One (1) copy of building elevations to scale for all buildings.
❑ A list of building materials for all facades and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ The attached Non - Residential Architectural Standards Building Review checklist with all items checked off
or a brief explanation as to why they are not checked off (if applicable).
Fo ign consideration:
z
Ten (10) copies of sign details with dimensions.
Ten (10) copies of the building elevation showing sign placement (if attached signage is proposed).
m /Ten (10) copies of color samples.
Material samples.
NOTE: Proposed development in Wolf Pen Creek must be reviewed by the Design Review Board. When staff has
completed their technical review of the proposal, it will be scheduled for consideration by the Design Review
Board. Ten (10) copies of all current design plans and color samples will be required for the Board.
1/11 Page 1 of 11
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT 1 QN , 4- 6(2.
ADDRESS 6 C; / A(t 414-4)
LEGAL DESCRIPTION (Lot, Block, Subdivision) //}} �,,{{� �( ,, r f
APPLICANT /PROJECT MANAGER'S INFORMATION (Prima 0
contact for the project): 44 e u �* < 4(\ Ca+^
h,� p ntu p •
Name f "'i� � 'l�� A 5 OI � .51' co.) E -mail Q1' h l. 6 rh
Street Address - In) ti WOE
Cit State � Zip Code
Phone Number 11) i — �p?dL Fax Number
PROPERTY OWNER'S INFORMATI Can{rt(
Name �4'1 ti A / A I l; E -mail
Street Address ' 4a1.4 ( GL. \--
City ilidfj1 State T64._ Zip Code 1113
Phone Number A6-77) 191e3 -- ogg f Fax Number
OTHER CONTACTS (Please spe fy h of contact, i.e. project manager, potential buyer, local contact,etc.): f th
1
Name 'aAy Pi-1\ E -mail on 1 / k
Street Address 1 0/1 O IF hoard m .LA) 15 I Y1 .GOM
City 1, State 1 . Zip Code 7 I( 0
Phone Number � 51 2 ) 3) z - L 5-55 Fax Number (i 1) 30— —
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
r Yes
r No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
1/11 Page 2 of 11
Proposed use of property A 2ij2
Is there Special Flood Hazard Area (Zone A �� oor Zone AE on FEMA FIRM panels) on the property? T Yes fl No
Square footage of attached sign U , 9A
Square footage of freestanding sign
For Site Plan consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Site Lighting:
Solid Waste:
Relationship of building(s) to site:
Relationship of building(s) and site to adjoining areas:
Building footprint design:
Miscellaneous structures and street hardware:
Landscaping:
Site Maintenance:
1/11 Page 3 of 11
For Building consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Building Lighting:
Solid Waste Screening:
Relationship of building(s) to site:
Relationship of building(s) and site to adjoining areas:
Building design:
Maintenance (as related to Building design):
For Sign consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Signs:
51 4 1 If b665 Pep Wad t (VIP/ lolled To 4114 rch PROFS - To fq
Maintenance:
AK e ed-yi till P ofgrv f to Of_. Nw An NEC 4.106(rn df I i
( CIO r,) ,n oil �Pinti r o r etdd , tt "rite/awe clap k , . i.
The ap. h. •repared this application and certifies that the facts stated herein and exhibits attached hereto are true,
car ,i and c o + . e.
) oW it 12 _.it,,‘
gi
Signature and ti e Date
1/11 Page 4 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab
pre -pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
TH ■EVELP' ENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
A RAT:
idevi,..•••,----F " e•Oei l a 104 2,
Property 0 n •r(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer Date
1/11 Page 5 of 11
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A. I, certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
* If a platting- status exemption to this requirement is asserted, provide written justification under
separate letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. I, , certify to the following:
(i) that any nonresidential or multi - family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100 -year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
1/11 Page 6 of 11